[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104514":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104514,780,2,"多选题","建设单位采用施工总承包模式发包工程的优点有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","分包单位参与管理，可降低施工总承包单位的报价",false,{"key":16,"text":17,"correct":14},"B","建设周期相对较短，有利于工程较早投入使用",{"key":19,"text":20,"correct":21},"C","总包合同价确定较早，有利于工程造价控制",true,{"key":23,"text":24,"correct":21},"D","有总承包单位监督和分包单位自控，有利于工程质量控制",{"key":26,"text":27,"correct":21},"E","协调工作量减少，有利于合同管理","CDE","考点:建设工程监理委托方式。选项AB错误，施工总承包模式的缺点是建设周期较长，施工总承包单位的报价可能偏高。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]