[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104449":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104449,780,2,"多选题","工程监理单位对工程勘察方案审查的内容有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","勘察工作内容是否与勘察合同及设计要求相符",true,{"key":16,"text":17,"correct":14},"B","勘察点布置是否合理",{"key":19,"text":20,"correct":14},"C","现场勘察组织及人员安排是否合理",{"key":22,"text":23,"correct":14},"D","勘察进度计划是否满足工程总进度计划要求",{"key":25,"text":26,"correct":27},"E","试样的数量和质量是否符合规范要求",false,"ABCD","考点:勘察设计阶段服务内容。工程勘察方案审查的重点内容包括：（1）勘察技术方案中工作内容与勘察合同及设计要求是否相符，是否有漏项或冗余；（2）勘察点的布置是否合理，其数量、深度是否满足规范和设计要求；（3）各类相应的工程地质勘察手段、方法和程序是否合理，是否符合有关规范的要求；（4）勘察重点是否符合勘察项目特点，技术与质量保证措施是否还需要细化，以确保勘察成果的有效性；（5）勘察方案中配备的勘察设备是否满足本工程勘察技术要求；（6）勘察单位现场勘察组织及人员安排是否合理，是否与勘察进度计划相匹配。（7）勘察进度计划是否满足工程总进度计划。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]