[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104439":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104439,780,2,"多选题","导致非计划性风险自留的主要原因有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","风险意识过强",false,{"key":16,"text":17,"correct":18},"B","风险识别失误",true,{"key":20,"text":21,"correct":18},"C","风险分析与评价失误",{"key":23,"text":24,"correct":18},"D","风险决策延误",{"key":26,"text":27,"correct":18},"E","风险决策实施延误","BCDE","考点:建设工程风险管理。导致非计划性风险自留的主要原因有：缺乏风险意识、风险识别失误、风险分析与评价失误、风险决策延误、风险决策实施延误等。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]