[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104432":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104432,780,2,"多选题","在损失控制计划系统中，应急计划是在损失基本确定后的处理计划，其应包括的内容有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","采用多种货币组合的方式付款",false,{"key":16,"text":17,"correct":18},"B","全面审查可使用的资金情况",true,{"key":20,"text":21,"correct":18},"C","准备保险索赔依据",{"key":23,"text":24,"correct":14},"D","控制事故的进一步发展，最大限度地减少资产和环境损害",{"key":26,"text":27,"correct":18},"E","确定保险索赔的额度","BCE","考点:建设工程风险管理。应急计划应包括的内容有：调整整个建设工程实施进度计划、材料与设备的采购计划、供应计划；全面审查可使用的资金情况；准备保险索赔依据；确定保险索赔的额度；起草保险索赔报告；必要时需调整筹资计划等。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]