[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104384":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1104384,780,1,"单选题","根据《建设工程质量管理条例》，组织有关单位参加建设工程竣工验收的义务主体是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工企业",false,{"key":16,"text":17,"correct":18},"B","建设单位",true,{"key":20,"text":21,"correct":14},"C","建设行政主管部门",{"key":23,"text":24,"correct":14},"D","建设工程质量监督机构","2020版教材P11-13 建设工程按设计文件的规定内容和标准全部完成，并按规定将施工现场清理完毕后，达到竣工验收条件时，建设单位即可组织工程竣工验收。工程勘察、设计、施工、监理等单位应参加工程竣工验收。选项B正确。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]