[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104362":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1104362,780,1,"单选题","建设工程初步设计是根据（ ）的要求进行具体实施方案的设计。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可行性研究报告",true,{"key":16,"text":17,"correct":18},"B","项目建议书",false,{"key":20,"text":21,"correct":18},"C","使用功能",{"key":23,"text":24,"correct":18},"D","批准的投资额","本题考查的是建设实施阶段工作内容。初步设计是根据可行性研究报告的要求进行具体实施方案设计，目的是为了阐明在指定的地点、时间和投资控制数额内，拟建项目在技术上的可行性和经济上的合理性，并通过对建设工程所作出的基本技术经济规定，编制工程总概算。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]