[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104349":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1104349,780,1,"单选题","根据《国务院关于投资体制改革的决定》，采用投资补助、转贷或贷款贴息的政府投资工程， 政府需要审批()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":14},"B","可行性研究报告",{"key":19,"text":20,"correct":14},"C","初步设计和概算",{"key":22,"text":23,"correct":24},"D","资金申请报告",true,"根据《国务院关于投资体制改革的决定》，政府投资工程实行审批制；非政府投资工程实行核准制 或登记备案制。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]