[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104227":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1104227,780,1,"单选题","根据《招标投标法实施条例》，下列说法错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","履约保证金不得超过中标合同金额的10%",false,{"key":16,"text":17,"correct":18},"B","招标人最迟应当在书面合同签订后7日内向中标人和未中标的投标人退还投标保证金及银行同期存款利息",true,{"key":20,"text":21,"correct":14},"C","招标人和中标人不得再行订立背离合同实质性内容的其他协议",{"key":23,"text":24,"correct":14},"D","评标委员会成员拒绝在评标报告上签字又不书面说明其不同意见和理由的，视为同意评标结果","2020版教材P49 已经发售资格预审文件、招标文件或者已经收取投标保证金的，招标人应当及时退还所收取的资格预审文件、招标文件的费用，以及所收取的投标保证金及银行同期存款利息；招标人已收取投标保证金的，应当自收到投标人书面撤回通知之日起5日内退还。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]