[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103981":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1103981,780,1,"单选题","根据《标准监理招标文件(2017 年版)》，委托人需要换委托人代表时，应提前()天通知监理人。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","5",{"key":19,"text":20,"correct":14},"C","7",{"key":22,"text":23,"correct":24},"D","14",true,"⑴除专用合同条款另有约定外，委托人应在合同签订后14 天内，将委托人代表的姓名、职务、联系方式、授权范围和授权期限书面通知监理人，由委托人代表在其授权范围和授权期限内，代表委托人行使权利、履行义务和处理合同履行中的具体事宜。委托人更换委托人代表的，应提前14 天将更换人员的姓名、职务、联系方式、授权范围和授权期限书面通知监理人。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]