[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103674":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1103674,780,1,"单选题","在监理实施细则中，不属于监理工作涉及的流程的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","进度控制流程",false,{"key":16,"text":17,"correct":14},"B","造价控制流程",{"key":19,"text":20,"correct":21},"C","监理大纲编制流程",true,{"key":23,"text":24,"correct":14},"D","分包单位资格审核流程","2020教材P125-129 监理工作涉及的流程包括：开工审核工作流程、施工质量控制流程、进度控制流程、造价(工程量计量)控制流程、安全生产和文明施工监理流程、测量监理流程、施工组织设计审核工作流程、分包单位资格审核流程、建筑材料审核流程、技术审核流程、工程质量问题处理审核流程、旁站检查工作流程、隐蔽工程验收流程、工程变更处理流程、信息资料管理流程等。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]