[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103407":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1103407,780,1,"单选题","下列选项中，编制工程质量评估报告的时间是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分部工程验收合格后",false,{"key":16,"text":17,"correct":14},"B","工程竣工验收合格后",{"key":19,"text":20,"correct":21},"C","工程竣工预验收合格后",true,{"key":23,"text":24,"correct":14},"D","保修期过后","2020教材P158-161 工程竣工预验收合格后，由总监理工程师组织专业监理工程师编制工程质量评估报告，编制完成后，由项目总监理工程师及监理单位技术负责人审核签认并加盖监理单位公章后报建设单位。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]