[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103354":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1103354,780,1,"单选题","(2019年真题）关于工程勘察成果审查的说法，正确的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","岩土工程勘察正确反映场地工程地质条件",true,{"key":16,"text":17,"correct":18},"B","详勘阶段的勘察成果应满足初步设计的深度要求",false,{"key":20,"text":21,"correct":18},"C","勘察报告应有完成单位的公章和法人代表签字",{"key":23,"text":24,"correct":18},"D","勘察评估报告由专业监理工程师组织编制","详勘阶段的勘察成果应满足施工图设计的深度要求。勘察报告应有完成单位的公章（法人公章或资料专业章），应有法人代表（或其委托代理人）和项目主要负责人签章。勘察评估报告由总监理工程师组织各专业监理工程师编制。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]