[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103334":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1103334,780,1,"单选题","(2015年真题）建设工程风险识别是由若干工作构成的过程，最主要成果是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","风险清单",true,{"key":16,"text":17,"correct":18},"B","识别建设工程风险因素",false,{"key":20,"text":21,"correct":18},"C","建设工程风险分解",{"key":23,"text":24,"correct":18},"D","识别建设工程风险事件及其后果","风险识别的最主要成果是风险清单。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]