[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103306":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1103306,780,1,"单选题","（ ）是指完成项目计划中确定的工作以实现项目目标的一组过程。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","启动过程组",false,{"key":16,"text":17,"correct":14},"B","计划过程组",{"key":19,"text":20,"correct":21},"C","执行过程组",true,{"key":23,"text":24,"correct":14},"D","监控过程组","2020版教材P169-171 本题考查重点是“2020版教材PMBOK总体框架的五个基本过程组”。 2020版教材PMBOK将项目管理活动归结为五个基本过程组，即：启动、计划、执行、监控和收尾。执行过程组是指完成项目计划中确定的工作以实现项目标的一组过程。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]