[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1103209":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1103209,780,1,"单选题","Project Controlling与Partnering模式的共同之处是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","信息共享",false,{"key":16,"text":17,"correct":14},"B","协调机制",{"key":19,"text":20,"correct":14},"C","长期协议",{"key":22,"text":23,"correct":24},"D","不能独立存在",true,"2020版教材P198-201 2020版教材Project Controlling与2020版教材Partnering这两种模式均不能独立存在。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]