[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102896":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1102896,780,1,"单选题","某工程分为2个子项目，合同总价为3900万美元，其中子项目1的合同价为2100万美元，子项目2的合同价为1800万美元，合同工期为30个月，则工程建设强度为（ ）万美元\u002F年。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1560",true,{"key":16,"text":17,"correct":18},"B","840",false,{"key":20,"text":21,"correct":18},"C","720",{"key":23,"text":24,"correct":18},"D","1280","考点:项目监理机构人员配备。工程建设强度是指单位时间内投入的建设工程资金的数量，即：工程建设强度=投资\u002F工期=[3900\u002F30]×12=1560万美元\u002F年。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]