[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102794":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1102794,780,1,"单选题","监理例会会议纪要由（ ）根据会议记录整理。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工单位",false,{"key":16,"text":17,"correct":14},"B","建设单位代表",{"key":19,"text":20,"correct":21},"C","项目监理机构",true,{"key":23,"text":24,"correct":14},"D","项目经理部","考点:建设工程监理主要文件资料分类及编制要求。监理例会会议纪要：（1）监理例会会议纪要由项目监理机构根据会议记录整理。（2）例会上意见不一致的重大问题，应将各方的主要观点，特别是相互对立的意见记入“其他事项”中。会议纪要的内容应真实准确，简明扼要，经总监理工程师审阅，与会各方代表会签，发至合同有关各方，并应有签收手续。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]