[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102771":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1102771,780,1,"单选题","关于风险识别方法的说法，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","流程图法不仅分析流程本身，也可显示发生问题的损失值或损失发生的概率",false,{"key":16,"text":17,"correct":14},"B","风险初始清单是项目风险管理的经验总结，可以作为项目风险识别的最终结论",{"key":19,"text":20,"correct":21},"C","经验数据法根据已建各类工程与风险有关的统计资料来识别拟建工程风险",true,{"key":23,"text":24,"correct":14},"D","专家调查法是从分析具体工程特点入手，对已经识别出的风险进行鉴别和确认","考点:建设工程风险管理。选项A错误，流程图分析仅着重于流程本身，而无法显示发生问题的损失值或损失发生的概率。选项B错误，初始清单只是为了便于人们较全面地认识风险的存在，而不至于遗漏重要的建设工程风险，但并不是风险识别的最终结论。选项D错误，专家调查法不是对已经识别出的风险进行鉴别和确认。",{"id":6,"name":27,"category":28,"favorite":29},"监理概论","建筑工程",0]