[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,9,50,2250,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,213,225,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,460,472,484,495,506,518,530,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1100496,1,"单选题","根据《标准施工招标文件》，关于评标委员会对投标文件质疑的说法，错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","评标委员会以书面形式要求投标人书面澄清质疑问题",false,{"key":24,"text":25,"correct":26},"B","评标委员会约请投标人当面澄清并作会议记录",true,{"key":28,"text":29,"correct":22},"C","评标委员会不接受投标人主动提出的澄清说明",{"key":31,"text":32,"correct":22},"D","投标人的书面澄清说明作为投标书的组成文件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1100497,"根据《招标投标法》，应由（ ）确定中标人。",[38,40,42,44],{"key":20,"text":39,"correct":26},"招标人",{"key":24,"text":41,"correct":22},"招标代理机构",{"key":28,"text":43,"correct":22},"评标委员会",{"key":31,"text":45,"correct":22},"招标投标监督机构",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1100498,"建设工程项目招标人与中标人签订合同前，可就投标文件中的（ ）进行协商谈判",[50,52,54,56],{"key":20,"text":51,"correct":26},"细微偏差",{"key":24,"text":53,"correct":22},"投标价格",{"key":28,"text":55,"correct":22},"质量要求",{"key":31,"text":57,"correct":22},"工期要求",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1100499,"中标人在签订施工合同前，应履行的担保义务是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"按招标文件的规定向招标人提交预付款担保",{"key":24,"text":65,"correct":26},"按招标文件的规定向招标人提交履约担保",{"key":28,"text":67,"correct":22},"书面同意从工程款中扣留履约保证金",{"key":31,"text":69,"correct":22},"按招标文件规定提交工程款支付担保",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1100500,"根据《标准施工招标文件》，到投标截止时间时，投标人数量不足（ ）个的，应当重新招 标。",[74,76,78,80],{"key":20,"text":75,"correct":22},"2",{"key":24,"text":77,"correct":26},"3",{"key":28,"text":79,"correct":22},"4",{"key":31,"text":81,"correct":22},"5",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1100501,"根据《招标投标法实施条例》，招标人可以釆用两阶段招标的项目是（ ）",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设规模100万㎡以上，建设周期3年以上的项目",{"key":24,"text":89,"correct":22},"项目初步设计已完成且施工图设计尚未完成的项目",{"key":28,"text":91,"correct":26},"技术复杂或者无法精确拟定技术规范的项目",{"key":31,"text":93,"correct":22},"构成内容多且专业性强的大型项目",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1100502,"技术复杂的建设工程项目，招标人可采用两阶段招标。关于第二阶段评标的说法，错误的是 （ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"评标委员会检查各投标书是否按照第一阶段提出的要求作出响应性修改",{"key":24,"text":101,"correct":22},"投标人在澄清问题会后，应以书面形式对投标书的不明之处加以说明",{"key":28,"text":103,"correct":22},"技术标未通过者，商务标原封不动退还给投标人",{"key":31,"text":105,"correct":26},"技术标未通过，但商务报价及优惠条件对项目有利的，可参加第二阶段评标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1100503,"某招标项目，招标人在原定投标截止之日前10d发出最后一份书面答疑文件，则此时投标截止 时间至少延长（ ）d。",[110,111,113,115],{"key":20,"text":81,"correct":26},{"key":24,"text":112,"correct":22},"10",{"key":28,"text":114,"correct":22},"15",{"key":31,"text":116,"correct":22},"20",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1100504,"建设工程项目的招标人发现招标文件有错误时，应在投标截止时间15日前通知投标人，同时进 行的工作是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":26},"以书面形式修改招标文件，但不延长投标截止日期",{"key":24,"text":124,"correct":22},"以口头形式修改招标文件，但不延长投标截止日期",{"key":28,"text":126,"correct":22},"以书面形式修改招标文件，并延长投标截止日期",{"key":31,"text":128,"correct":22},"以口头形式修改招标文件，并延长投标截止日期",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1100505,"关于招标人解答投标人质疑的说法，正确的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"招标人给予口头答复即可",{"key":24,"text":136,"correct":22},"招标人答复只给予提问者",{"key":28,"text":138,"correct":26},"招标人答复作为招标文件的组成部分",{"key":31,"text":140,"correct":22},"招标人答复与招标文件不一致，以招标文件为准",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1100506,"公开招标时，对招标人和投标人均有法律约束力的投标有效期应从（ ）起算",[145,147,149,151],{"key":20,"text":146,"correct":22},"发布招标公告日",{"key":24,"text":148,"correct":22},"开始资格预审日",{"key":28,"text":150,"correct":22},"发售招标文件日",{"key":31,"text":152,"correct":26},"投标截止日",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1100507,"工程投标时，投标保证金对投标人具有约束力的期限是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"申请资格预审日起，至开标日止",{"key":24,"text":160,"correct":22},"购买招标文件日起，至开标日止",{"key":28,"text":162,"correct":22},"投标截止日起，至招标人确定中标人日止",{"key":31,"text":164,"correct":26},"投标截止日起，至招标人与中标人签订合同日止",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1100508,"在投标有效期内出现特殊情况，招标人以书面形式通知投标人延长投标有效期时，投标人的正 确做法是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":26},"同意延长，并相应延长投标保证金的有效期",{"key":24,"text":172,"correct":22},"同意延长，并要求修改投标文件",{"key":28,"text":174,"correct":22},"同意延长，但拒绝延长投标保证金的有效期",{"key":31,"text":176,"correct":22},"拒绝延长，但无权收回投标保证金",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},1100509,"关于延长投标有效期的说法，错误的是（ ）",[181,183,185,187],{"key":20,"text":182,"correct":22},"需要延长投标有效期时，招标人应以书面形式通知所有投标人",{"key":24,"text":184,"correct":22},"投标人同意延长投标有效期，其投标保证金的有效期相应延长",{"key":28,"text":186,"correct":22},"投标人可以拒绝延长投标有效期，但会失去参与投标竞争的资格",{"key":31,"text":188,"correct":26},"投标人拒绝延长投标有效期的，无权收回投标保证金",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1100510,"关于投标保证金的说法，正确的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"招标文件的主要内容中不包括投标保证金",{"key":24,"text":196,"correct":26},"投标人不按要求提交投标保证金的，其投标文件按废标处理",{"key":28,"text":198,"correct":22},"投标保证金有效期应当长于投标有效期",{"key":31,"text":200,"correct":22},"投标保证金不得超过招标项目估算价的10%",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1100511,"下列关于中标的描述中正确的是( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"确定中标人的权力归评标委员会",{"key":24,"text":208,"correct":26},"招标人在评标委员会推荐的中标候选人中确定中标人",{"key":28,"text":210,"correct":22},"招标人可以根据自己的意愿确定中标人",{"key":31,"text":212,"correct":22},"中标通知书发出后，招标人有权拒绝订立合同",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1100516,"建立进度控制目标体系，明确建设工程现场监理组织机构中进度控制人员及其职责分工属于监理工程师实 施进度控制的（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"组织措施",{"key":24,"text":220,"correct":22},"技术措施",{"key":28,"text":222,"correct":22},"经济措施",{"key":31,"text":224,"correct":22},"合同措施",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1100517,"在工程项目实施阶段，项目监理机构及时为承包商办理工程预付款，属于项目监理机构在进度目标控制过 程中采取的（ ）。",[229,230,231,232],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":22},{"key":28,"text":222,"correct":26},{"key":31,"text":224,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},1100518,"按照建设项目总进度目标论证的工作步骤，项目结构分析后紧接着需要进行的工作是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"调查研究和收集资料",{"key":24,"text":240,"correct":22},"项目的工作编码",{"key":28,"text":242,"correct":22},"编制各层进度计划",{"key":31,"text":244,"correct":26},"进度计划系统的结构分析",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1100519,"关于建设工程项目总进度目标的说法，正确的是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"建设工程项目总进度目标的控制是施工总承包方项目管理的任务",{"key":24,"text":252,"correct":26},"在进行项目总进度目标控制前，应分析和论证目标实现的可能性",{"key":28,"text":254,"correct":22},"项目实施阶段的总进度指的就是施工进度",{"key":31,"text":256,"correct":22},"项目总进度目标论证就是要编制项目的总进度规划",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1100520,"关于中标和签订合同的说法，正确的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"招标人应当授权评标委员会直接确定中标人",{"key":24,"text":264,"correct":22},"招标人与中标人签订合同的标的、价款、质量等主要条款应当与招标文件一致，但履行期限可以另行协商确定",{"key":28,"text":266,"correct":26},"确定中标人的权利属于招标人",{"key":31,"text":268,"correct":22},"中标人应当自中标通知书送达之日起30日内，根据招标文件与投标人订立书面合同",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},1100521,"某建设工程施工项目招标文件要求中标人提交履约担保，中标人拒绝提交，则应（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"按中标无效处理",{"key":24,"text":276,"correct":22},"视为放弃投标",{"key":28,"text":278,"correct":22},"按废标处理",{"key":31,"text":280,"correct":26},"视为放弃中标项目",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1100528,"关于招标文件的澄清，说法正确的有（）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"投标人可以书面或口头形式提出质疑，要求招标人予以澄清",{"key":24,"text":288,"correct":26},"招标人应以书面形式对投标人的质疑予以解答，并发送给每一位投标人，",{"key":28,"text":290,"correct":22},"解答可以涉及问题的来源",{"key":31,"text":292,"correct":22},"如果澄清文件发出的时间距投标截止日期不足20天，须相应延长投标截止日期",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},1100529,"我国招标投标法规定，评标委员会成员一般应于（）确定。",[297,299,301,303],{"key":20,"text":298,"correct":22},"招标前",{"key":24,"text":300,"correct":22},"接标前",{"key":28,"text":302,"correct":26},"开标前",{"key":31,"text":304,"correct":22},"评标前",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1100530,"下列关于评标专家必须满足的条件，说法不正确的是（）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"从事相关专业领域工作满8年",{"key":24,"text":312,"correct":26},"具有高级职称",{"key":28,"text":314,"correct":22},"熟悉有关招标投标的法律法规",{"key":31,"text":316,"correct":22},"具有与招标项目相关的实践经验",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},1100531,"某项目招标，经评标委员会评审认为所有投标都不符合招标文件的要求，这时应当（）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"与相对接近要求的投标人协商，改为议标确定中标人",{"key":24,"text":324,"correct":22},"改为直接发包",{"key":28,"text":326,"correct":22},"用原招标文件重新招标",{"key":31,"text":328,"correct":26},"修改招标文件后重新招标",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1100532,"下列有关邀请招标的说法正确的有（）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"邀请对象的数目不应少于5家，以5—7家为宜",{"key":24,"text":336,"correct":26},"不需要发布招标公告和设置资格预审程序，节约费用和节省时间",{"key":28,"text":338,"correct":22},"由于邀请的范围较小选择面窄，增加了合同履行过程中承包方违约的风险",{"key":31,"text":340,"correct":22},"由于对投标人以往的业绩和履约能力比较了解，不要求在投标书内报送表明投标人资质能力的有关证明材料",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},1100533,"某工程的招标人具有编制招标文件和组织评标的能力，则招标人（）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"经批准后可以自行招标",{"key":24,"text":348,"correct":22},"办理备案后可以自行招标",{"key":28,"text":350,"correct":26},"可以自行招标",{"key":31,"text":352,"correct":22},"应当委托代理机构招标",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},1100534,"建设工程项目施工采用公开招标方式并且需要通过资格预审筛选出有资格的投标人的，应当按规定发布（），公布投标人资格条件。",[357,359,361,363],{"key":20,"text":358,"correct":22},"邀请公告",{"key":24,"text":360,"correct":22},"招标公告",{"key":28,"text":362,"correct":26},"资格预审公告",{"key":31,"text":364,"correct":22},"投标邀请书",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1100535,"关于国有资金占控股地位的依法必须招标的项目，说法不正确的是（）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"应当公开招标",{"key":24,"text":372,"correct":22},"应当组建资格审查委员会",{"key":28,"text":374,"correct":26},"应当由评标委员会确定中标人",{"key":31,"text":376,"correct":22},"应当确定排名第一的中标候选人为中标人",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},1100536,"我国招标投标法规定，评标委员会成员名单应当保密直至（）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"评标结束",{"key":24,"text":384,"correct":22},"提交评标报告",{"key":28,"text":386,"correct":26},"中标结果确定",{"key":31,"text":388,"correct":22},"签订合同",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1100537,"关于从依法组建的专家库中确定评标专家的方式，说法正确的是（）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"采取随机抽取或者招标人直接确定的方式",{"key":24,"text":396,"correct":22},"一律由招标人直接确定",{"key":28,"text":398,"correct":22},"一律采取随机抽取的方式",{"key":31,"text":400,"correct":22},"任意选择随机抽取或者招标人直接确定的方式",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1100538,"下列项目中可以由招标人直接确定评标专家的有（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"技术复杂.专业性强的项目",{"key":24,"text":408,"correct":22},"专业性强的项目",{"key":28,"text":410,"correct":22},"国家有特殊要求的项目",{"key":31,"text":412,"correct":26},"国家有特殊要求，采取随机抽取方式确定的专家难以保证胜任的项目",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1100539,"关于评标委员会的组成，下列说法正确的有（）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"评标委员会中的专家应从事相关专业领域工作至少10年",{"key":24,"text":420,"correct":26},"评标委员会由招标人或其委托的招标代理机构熟悉相关业务的代表，以及有关技术.经济等方面的专家组成，不得包括项目主管部门或者行政监督部门代表",{"key":28,"text":422,"correct":22},"评标委员会成员人数为5人以上，其中技术.经济等方面的专家不得少于成员总数的2\u002F3",{"key":31,"text":424,"correct":22},"评标委员会的专家一般由招标人直接确定，但对技术复杂.专业性强或者国家有特殊要求的招标项目，可以从依法组建的专家库中随机抽取",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1100541,"关于编写招标投标情况书面报告并向建设行政主管部门备案的说法正确的是（）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"由评标委员会编写，中标通知书发出后15日内备案",{"key":24,"text":432,"correct":22},"由招标人编写，中标通知书发出后15日内备案",{"key":28,"text":434,"correct":22},"由招标代理机构编写，确定中标人15日内备案",{"key":31,"text":436,"correct":26},"由招标人编写，确定中标人15日内备案",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1100542,"在施工招标程序中，发售招标文件后的下一个工作阶段是（）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"踏勘现场",{"key":24,"text":444,"correct":22},"召开投标预备会",{"key":28,"text":446,"correct":22},"组建评标委员会",{"key":31,"text":448,"correct":22},"递交投标文件",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1100543,"下列选项中，不属于标准施工招标资格预审文件的主要内容的是( )。",[453,454,456,458],{"key":20,"text":362,"correct":22},{"key":24,"text":455,"correct":22},"申请人须知",{"key":28,"text":457,"correct":22},"资格审查办法",{"key":31,"text":459,"correct":26},"工程概况",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1100553,"通过资格预审详细审查的申请人数量不足（ ）的 ，招标人应重新组织资格预审或不再组织资格预审而直接招标。",[464,466,468,470],{"key":20,"text":465,"correct":22},"2个",{"key":24,"text":467,"correct":26},"3个",{"key":28,"text":469,"correct":22},"5个",{"key":31,"text":471,"correct":22},"有限数量制中规定的数量",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},1100554,"在有限数量制的资格审查中，如通过详细审查的申请人为8个，而资格审查文件规定的数量为7个，则（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"不需要进行评分，随时选取7个通过资格审查",{"key":24,"text":479,"correct":22},"需要进行评分，8家均通过资格审查",{"key":28,"text":481,"correct":26},"需要进行评分，前7家通过资格审查",{"key":31,"text":483,"correct":22},"不需要进行评分，提交资格申请文件时间排在前7位的通过资格审查",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":28,"analysis":33},1100555,"在有限数量制的资格审查中，如通过详细审查的申请人为8个，而资格审查文件规定的数量为9个，则（ ）。",[488,490,491,493],{"key":20,"text":489,"correct":22},"不需要评分，选其中前3名通过资格审查",{"key":24,"text":479,"correct":22},{"key":28,"text":492,"correct":26},"不需要进行评分，8家均通过资格审查",{"key":31,"text":494,"correct":22},"需重新进行资格审查",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1100556,"在有限数量制的资格审查中，如通过详细审查的申请人为8个，未超过规定数量，则（ ）。",[499,501,503,504],{"key":20,"text":500,"correct":22},"选其中前3名通过资格审查",{"key":24,"text":502,"correct":26},"8家均通过资格审查",{"key":28,"text":494,"correct":22},{"key":31,"text":505,"correct":22},"对8家重新进行打分排序",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1100557,"招标程序中资格预审与资格后审的区别，主要体现在审查投标人资格的（）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"目的",{"key":24,"text":513,"correct":26},"时间",{"key":28,"text":515,"correct":22},"内容",{"key":31,"text":517,"correct":22},"方法",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1100558,"下列对资格预审申请文件进行审查的说法正确的是（）。",[522,524,526,528],{"key":20,"text":523,"correct":26},"资格审查委员会按照初步审查和详细审查两个阶段进行",{"key":24,"text":525,"correct":22},"初步审查中有一项不符合审查标准，还需再进行详细审查，如详细审查中有任一项因素不符合审查标准，才能判为资格预审不合格",{"key":28,"text":527,"correct":22},"资格审查委员会审查联合体申请人的资质条件时，按照资质等级较高的单位确定其资质等级",{"key":31,"text":529,"correct":22},"资格审查委员会要求申请人澄清，而申请人未予书面说明，不影响审查委员会对该项按审查标准继续进行审查",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":532,"answer":24,"analysis":33},1100559,[533,534,535,536],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1100560,"下列施工招标中投标人资格预审的内容，属于初步审查内容的是（）。",[541,543,545,547],{"key":20,"text":542,"correct":26},"联合体投标的，是否具备联合协议",{"key":24,"text":544,"correct":22},"资质条件",{"key":28,"text":546,"correct":22},"类似项目的业绩",{"key":31,"text":548,"correct":22},"项目经理资格",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},1100561,"根据9 部委于2007 年颁发的《标准施工招标资格预审文件》，下列单位能作为资格预审申请人的有（）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"本标段的监理人",{"key":24,"text":556,"correct":22},"为项目前期准备曾提供设计服务的单位",{"key":28,"text":558,"correct":26},"三年前曾骗取中标的单位",{"key":31,"text":560,"correct":22},"与本标段的招标代理机构同为一个法定代表人的单位",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":28,"analysis":33},1100562,"资格审查方法分为合格制和有限数量制两种，两者的区别主要体现在（）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"审查程序",{"key":24,"text":568,"correct":22},"审查因素",{"key":28,"text":570,"correct":26},"合格者数量限制",{"key":31,"text":572,"correct":22},"审查标准",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1100566,"某招标项目采用经评审的最低投标价法进行评标，有四家单位投标有效，其中()的投标书为最优投标书。",[577,579,581,583],{"key":20,"text":578,"correct":22},"投标报价2000万元，评标价1950万元",{"key":24,"text":580,"correct":26},"投标报价2050万元，评标价1940万元",{"key":28,"text":582,"correct":22},"投标报价1980万元，评标价1970万元",{"key":31,"text":584,"correct":22},"投标报价1950万元，评标价1960万元",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},1100569,"某污水处理厂项目采用经评审的最低投标价法进行评标。评标办法规定，对提前竣工、污水处理成本偏差等因素进行价格折算。价格折算的办法如下：该工程招标工期为30个月，承诺工期每提前1个月，给招标人带来的预期收益为50万元。污水处理成本比招标文件规定的标准每高一个百分点，投标报价增加2％，每低一个百分点，投标报价减少1％。高于10％投标将被否决。投标人A：投标报价为4850万元，污水处理成本比规定标准高2个百分点，承诺的工期为30个月。投标人B：投标报价为4900万元，污水处理成本比规定标准高1个百分点，承诺的工期为29个月。投标人C：投标报价为5000万元，污水处理成本比规定标准低2个百分点，承诺的工期为28个月。则最终评标价由低到高的顺序为( )。",[589,591,593,595],{"key":20,"text":590,"correct":22},"投标人A，投标人B，投标人C",{"key":24,"text":592,"correct":26},"投标人C，投标人B，投标人A",{"key":28,"text":594,"correct":22},"投标人A，投标人C，投标人B",{"key":31,"text":596,"correct":22},"投标人C，投标人A，投标人B",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":28,"analysis":33},1100572,"采用评标价法进行评标，评标委员会确定的评标价格本质上是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"确定中标价",{"key":24,"text":604,"correct":22},"确定合同价",{"key":28,"text":606,"correct":26},"衡量各投标书优劣的依据",{"key":31,"text":608,"correct":22},"评审的各因素的打分之和",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]