[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,8,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,233,245,257,269,280,292,304,316,327,336,348,357,366,374,382,394,406,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1100418,1,"单选题","（2020年真题）根据《标准施工招标文件》，关于缺陷责任期的说法，正确的是（ ） ．",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","缺陷责任期应从工程接收证书写明的竣工日开始起算",true,{"key":24,"text":25,"correct":26},"B","缺陷责任期内出现的工程缺陷由发包人负责修复",false,{"key":28,"text":29,"correct":26},"C","缺陷责任期内发生的修复费用由承包人承担",{"key":31,"text":32,"correct":26},"D","缺陷责任期最长不得超过1年","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1100419,"（2020年真题）根据《标准施工招标文件》，关于进度款支付证书的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"进度款支付证书应由监理人审查承包人进度付款申请单后签发",{"key":24,"text":41,"correct":26},"监理人出其进度款支付证书视为监理人已批准承包人完成该部分工作",{"key":28,"text":43,"correct":22},"进度款支付证书应经发包人审查同意并签认后由监理人出具",{"key":31,"text":45,"correct":26},"进度款支付证书- - 经签发监理人无权修改",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1100420,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，承包人的施工安全责任是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"执行监理人编制的施工安全摺施计划",{"key":24,"text":53,"correct":26},"要求发包人提供劳动保护用具",{"key":28,"text":55,"correct":22},"制定安全操作规程",{"key":31,"text":57,"correct":26},"承担施工现场所有人员工伤事故的赔偿责任",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1100421,"在建设工程材料设备采购合同中，关于当事人下列说法不正确的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":26},"永久工程的大型设备一般情况下由发包人采购",{"key":24,"text":65,"correct":26},"买受人即采购人，可以是发包人，也可能是承包人",{"key":28,"text":67,"correct":26},"采购合同的出卖人即供货人，可以是生产厂家，也可以是从事物资流转业务的供应商",{"key":31,"text":69,"correct":22},"材料设备供应的时间不能延误，但可以提前",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1100431,"关于材料采购合同货样买卖的表述中，不正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"货样买卖，是指当事人双方按照货样或样本所显示的质量进行交易",{"key":24,"text":77,"correct":26},"凭样品买卖的当事人应当封存样品，并可以对样品质量予以说明",{"key":28,"text":79,"correct":26},"出卖人交付的标的物应当与样品及其说明的质量相同",{"key":31,"text":81,"correct":22},"凭样品买卖的买受人不知道样品有隐蔽瑕疵的，即使交付的标的物与样品相同，出卖人交付的标的物质量仍然应当符合同种物的最高标准",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1100432,"建设工程材料设备采购合同的标的数量较大时，一般都采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"即时买卖合同",{"key":24,"text":89,"correct":22},"非即时买卖合同",{"key":28,"text":91,"correct":26},"材料采购合同",{"key":31,"text":93,"correct":26},"自由买卖合同",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1100433,"建设工程材料采购合同履行中，关于材料交付法律意义的说法，正确的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"交付导致材料所有权发生转移",{"key":24,"text":101,"correct":26},"在标的物交付之前由买受人承担",{"key":28,"text":103,"correct":26},"材料交付时间即合同生效时间",{"key":31,"text":105,"correct":26},"交付后材料灭失的风险由供货人承担",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1100434,"材料采购合同中，预付款一般为签约合同价的（）",[110,112,114,116],{"key":20,"text":111,"correct":22},"10%",{"key":24,"text":113,"correct":26},"15%",{"key":28,"text":115,"correct":26},"20%",{"key":31,"text":117,"correct":26},"30%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1100435,"材料采购合同履行管理中，除专用合同条款另有约定外，买方如果发现技术资料存在短缺和(或)损坏，卖方应在收到买方的通知后（）日内免费补齐短缺和(或)损坏的部分。",[122,124,126,128],{"key":20,"text":123,"correct":22},"7",{"key":24,"text":125,"correct":26},"14",{"key":28,"text":127,"correct":26},"24",{"key":31,"text":129,"correct":26},"28",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1100438,"材料采购合同，除专用合同条款另有约定外，供货周期不超过（）的签约合同价为固定价格。",[134,136,138,140],{"key":20,"text":135,"correct":22},"12个月",{"key":24,"text":137,"correct":26},"14个月",{"key":28,"text":139,"correct":26},"24个月",{"key":31,"text":141,"correct":26},"36个月",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1100440,"根据《标准材料采购合同》的规定，买方在全部合同材料交付后（ ）内未安排检验和验收的，卖方可签署进度款支付函并提交买方，买方在收到后（ ）内未提出书面异议的，则进度款支付函生效。",[146,148,150,152],{"key":20,"text":147,"correct":26},"7日，3日",{"key":24,"text":149,"correct":26},"28日，3日",{"key":28,"text":151,"correct":22},"3个月，7日",{"key":31,"text":153,"correct":26},"6个月，7日",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1100441,"根据《标准设备采购合同》，对于专用合同条款约定的超大超重件，卖方应在包装箱两侧标注（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"此端朝上，请勿倒置",{"key":24,"text":161,"correct":22},"重心、起吊点",{"key":28,"text":163,"correct":26},"尺寸，重量",{"key":31,"text":165,"correct":26},"危险标识",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1100442,"设备采购合同中，卖方应在合同材料预计（ ）预通知买方，并在合同材料（ ）正式通知买方。",[170,172,174,176],{"key":20,"text":171,"correct":26},"启运7日前，启运24小时前",{"key":24,"text":173,"correct":22},"启运7日前，启运24小时内",{"key":28,"text":175,"correct":26},"启运24小时前，启动24小时内",{"key":31,"text":177,"correct":26},"启运24小时前，到达前24小时内",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1100446,"设备采购合同，卖方按合同约定交付全部合同设备后，买方在收到卖方提交的下列全部单据并经审核无误后28 日内，向卖方支付合同价格的（）",[182,183,184,186],{"key":20,"text":115,"correct":26},{"key":24,"text":117,"correct":26},{"key":28,"text":185,"correct":26},"50%",{"key":31,"text":187,"correct":22},"60%",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},1100448,"根据《标准设备采购合同》的规定，设备安装完成后，为买方进行考核的机会不超过（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"一次",{"key":24,"text":195,"correct":26},"二次",{"key":28,"text":197,"correct":22},"三次",{"key":31,"text":199,"correct":26},"四次",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1100449,"根据《标准设备采购合同》的规定，买方在收到卖方提交的买方签署的（ ）证书或已生效的结清款支付函正本一份，并经审核无误后（ ）内，向卖方支付结清款。",[204,206,208,210],{"key":20,"text":205,"correct":26},"缺陷责任期届满，14天",{"key":24,"text":207,"correct":26},"缺陷责任期届满，28天",{"key":28,"text":209,"correct":26},"质量保证期届满，14天",{"key":31,"text":211,"correct":22},"质量保证期届满，28天",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1100450,"建设工程材料设备采购合同具有（）的一般特点。",[216,218,220,222],{"key":20,"text":217,"correct":22},"买卖合同",{"key":24,"text":219,"correct":26},"无偿合同",{"key":28,"text":221,"correct":26},"实践性合同",{"key":31,"text":223,"correct":26},"单务合同",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},1100451,"材料采购合同属于()。",[228,229,230,232],{"key":20,"text":221,"correct":26},{"key":24,"text":219,"correct":26},{"key":28,"text":231,"correct":22},"诺成合同",{"key":31,"text":223,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1100452,"建设工程材料设备采购合同属于买卖合同，其特点有（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"出卖人与买受人订立合同，不以转移财产所有权为目的",{"key":24,"text":240,"correct":22},"买卖合同是双务、有偿合同",{"key":28,"text":242,"correct":26},"买卖合同以实物的交付为合同成立的条件",{"key":31,"text":244,"correct":26},"出卖人转移财产所有权，可不以买受人支付价款为对价",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1100453,"在建设工程材料设备采购合同中，按照标的不同分为材料采购合同和设备采购合同。下列属于材料采购合同范畴的是( )。",[249,251,253,255],{"key":20,"text":250,"correct":26},"安装在电力工程中的发电机",{"key":24,"text":252,"correct":26},"塔吊",{"key":28,"text":254,"correct":26},"安装在建筑工程中的空调",{"key":31,"text":256,"correct":22},"用于建筑设备的材料，如电线、水管等",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1100454,"（ ）是指购买的标的物要分批交付。",[261,263,265,267],{"key":20,"text":262,"correct":26},"货样买卖",{"key":24,"text":264,"correct":26},"试用买卖",{"key":28,"text":266,"correct":22},"分期交付买卖",{"key":31,"text":268,"correct":26},"分期付款买卖",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1100455,"材料设备采购合同中，出卖人应当保质、保量、按期交付合同订购的物资、设备，买受人应当按合同约定的条件接收货物并及时支付货款，体现了买卖合同是()。",[273,274,276,278],{"key":20,"text":231,"correct":26},{"key":24,"text":275,"correct":22},"双务、有偿合同",{"key":28,"text":277,"correct":26},"单务、有偿合同",{"key":31,"text":279,"correct":26},"实践合同",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1100456,"某单位采用货样买卖方式签订了设备采购合同，关于采购方式及合同的说法，正确的是()。",[284,286,288,290],{"key":20,"text":285,"correct":26},"该合同属于即时买卖合同",{"key":24,"text":287,"correct":26},"货样应留存在供货人处",{"key":28,"text":289,"correct":22},"当事人可以在合同中对货样进行说明",{"key":31,"text":291,"correct":26},"采购人不知道货样有隐蔽瑕疵的，供货人可按货样交付货物",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1100457,"设备采购合同履行过程中，由于包装防护不当，造成货物锈蚀，由此造成的损失由( )承担。",[296,298,300,302],{"key":20,"text":297,"correct":22},"卖方",{"key":24,"text":299,"correct":26},"买方",{"key":28,"text":301,"correct":26},"运输方",{"key":31,"text":303,"correct":26},"买卖双方",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1100458,"在建设工程材料设备采购合同中，关于分期交付买卖说法，错误的是( )。",[308,310,312,314],{"key":20,"text":309,"correct":22},"工程建设的工期较长时一般不用",{"key":24,"text":311,"correct":26},"购买的标的物要分批交付",{"key":28,"text":313,"correct":26},"买受人如果对其中一批标的物解除，其可以解除与之相互依存的已交付标的物",{"key":31,"text":315,"correct":26},"买受人如果对其中一批标的物解除，其可以解除与之相互依存的未交付标的物",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1100459,"关于分期交付买卖合同的说法，正确的是（ ）。",[320,322,324,325],{"key":20,"text":321,"correct":26},"出卖人允许买受人试验其标的物，认可后再支付价款.",{"key":24,"text":323,"correct":22},"出卖人交付一批标的物不能实现合同目的，买受人可以就该批标的物解除",{"key":28,"text":79,"correct":26},{"key":31,"text":326,"correct":26},"出卖人解除合同的，可以向买受人要求支付该标的物的使用费",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1100460,"设备采购合同，合同生效后，买方在收到卖方开具的注明应付预付款金额的财务收据正本一份并经审核无误后28 日内，向卖方支付签约合同价的（）作为预付款。",[331,333,334,335],{"key":20,"text":332,"correct":26},"5%",{"key":24,"text":111,"correct":22},{"key":28,"text":113,"correct":26},{"key":31,"text":115,"correct":26},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},1100461,"设备采购合同，买方在收到卖方提交的买卖双方签署的合同设备验收证书或已生效的验收款支付函正本一份并经审核无误后（）日内，向卖方支付合同价格的（）。",[340,342,344,346],{"key":20,"text":341,"correct":26},"14；20%",{"key":24,"text":343,"correct":26},"28；20%",{"key":28,"text":345,"correct":26},"14；25%",{"key":31,"text":347,"correct":22},"28；25%",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1100462,"材料采购合同，除专用合同条款另有约定外，延交付违约金的最高限额为合同价格的（）。",[352,353,355,356],{"key":20,"text":111,"correct":22},{"key":24,"text":354,"correct":26},"12%",{"key":28,"text":113,"correct":26},{"key":31,"text":115,"correct":26},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},1100463,"材料采购合同，全部合同材料质量保证期届满后，买方在收到卖方提交的由买方签署的质量保证期届满证书并经审核无误后（）日内，向卖方支付合同价格5% 的结清款。",[361,362,363,365],{"key":20,"text":123,"correct":26},{"key":24,"text":125,"correct":26},{"key":28,"text":364,"correct":26},"20",{"key":31,"text":129,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},1100464,"材料采购合同中，合同生效后，买方在收到卖方开具的注明应忖预付款金额的财务收据正本一份井经审核无误后（）日内，向卖方支付签约合同价的10% 作为预付款。",[370,371,372,373],{"key":20,"text":123,"correct":26},{"key":24,"text":125,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":129,"correct":22},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},1100466,"（2014年真题）某单位采用货样买卖方式签订了设备采购合同，关于采购方式及合同的说法，正确的是（ ）。",[378,379,380,381],{"key":20,"text":285,"correct":26},{"key":24,"text":287,"correct":26},{"key":28,"text":289,"correct":22},{"key":31,"text":291,"correct":26},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1100467,"（2020年真题）因卖方未能按时支付合同约定的材料时，每延迟一天，应向买方支付（ ）违约金",[386,388,390,392],{"key":20,"text":387,"correct":22},"0.08%",{"key":24,"text":389,"correct":26},"0.5%",{"key":28,"text":391,"correct":26},"0.8%",{"key":31,"text":393,"correct":26},"1.0%",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},1100468,"（2020年真题）合同约定的材料经验收合格，买卖双方应签署的文件（ ）",[398,400,402,404],{"key":20,"text":399,"correct":26},"质量合格证",{"key":24,"text":401,"correct":26},"进度款支付证",{"key":28,"text":403,"correct":22},"验收证书",{"key":31,"text":405,"correct":26},"验收款支付证",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1100469,"（2020年真题）根据《标准材料采购招标文件》中的通用合同条款，合同约定的材料运输至施工场地卸货交付后，该材料的照管责任及风险应由（ ）承担。",[410,411,412,414],{"key":20,"text":297,"correct":26},{"key":24,"text":299,"correct":22},{"key":28,"text":413,"correct":26},"卖方和买方",{"key":31,"text":415,"correct":26},"材料生产厂家",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1100470,"（2020年真题）根据《标准设备采购招标文件》中的通用合同条款，合同约定设备在出厂”前 买方参与交货前检验，卖方在设备已包装完毕准备启运前通知买方的，监理人的正确做法是（ ） 。",[420,422,424,426],{"key":20,"text":421,"correct":26},"同意卖方启运，改为设备安装前检验",{"key":24,"text":423,"correct":22},"停止启运，按合同约定进行交货前检验",{"key":28,"text":425,"correct":26},"停止启运，卖方自行检验后再包装启运",{"key":31,"text":427,"correct":26},"同意启运，视为卖方违约并扣合同价15%的违约金",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1100471,"（2020年真题）根据《标准设备采购招标文件》，由于买方原因，合同约定的设备在三次考核中均未能达到技术性能考核指标，买卖双方应签署的文件是（ ） ．",[432,434,436,438],{"key":20,"text":433,"correct":26},"设备质量合格证",{"key":24,"text":435,"correct":22},"验收款支付函",{"key":28,"text":437,"correct":26},"进度款支付函",{"key":31,"text":439,"correct":26},"设备验收证书",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1100472,"（2020年真题）根据《标准设备采购招标文件》，买卖双方可约定合同设备的所有权和风险转移的界面为（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"装在设备制造厂”的运输工具上",{"key":24,"text":447,"correct":26},"施工场地设备安装部位",{"key":28,"text":449,"correct":22},"运至施工场地运输工具的车面上",{"key":31,"text":451,"correct":26},"施工场地的安装作业面",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1100473,"《简明标准施工招标文件》适用于( )。",[456,458,460,462],{"key":20,"text":457,"correct":26},"小型项目",{"key":24,"text":459,"correct":26},"中型项目",{"key":28,"text":461,"correct":26},"施工采购总承包项目",{"key":31,"text":463,"correct":22},"设计和施工不是由同一承包人承担的小型项目",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1100474,"下列关于邀请招标的描述中，正确的是( )。",[468,470,472,474],{"key":20,"text":469,"correct":26},"邀请招标也称为无限竞争性招标",{"key":24,"text":471,"correct":22},"只有少量潜在投标人可供选择可采用邀请招标",{"key":28,"text":473,"correct":26},"对技术复杂或者无法精确拟定技术规格的项目必须采用邀请招标",{"key":31,"text":475,"correct":26},"邀请招标一般采用资格预审的方式",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1100477,"某项目的招标人具有编制招标文件和组织评标的能力，则该招标人( )。",[480,482,484,486],{"key":20,"text":481,"correct":26},"可以采用直接委托方式发包",{"key":24,"text":483,"correct":22},"可以自行招标，但应当备案",{"key":28,"text":485,"correct":26},"可以自行招标，无须备案",{"key":31,"text":487,"correct":26},"必须委托中介机构代理招标",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1100479,"编制施工招标项目的资格预审文件和招标文件时，必须不加修改地引用《标准施工招标资格预 审文件》和《标准施工招标文件》中的（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"申请人须知前附表",{"key":24,"text":495,"correct":22},"资格审查办法",{"key":28,"text":497,"correct":26},"投标人须知前附表",{"key":31,"text":499,"correct":26},"资格预审公告",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1100480,"建设工程招标的基本程序主要包括：①发售招标文件；②编制招标文件；③委托招 标代理机构；④履行项目审批手续；⑤开标、评标；⑥签订合同；⑦发布招标公告或投标邀请书；⑧发出中标通知 书。上述程序正确的排列顺序是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"①②③④⑤⑥⑦⑧",{"key":24,"text":507,"correct":26},"③②④⑦①⑤⑧⑥",{"key":28,"text":509,"correct":26},"②③①④⑦⑤⑥⑧",{"key":31,"text":511,"correct":22},"④③②⑦①⑤⑧⑥",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1100481,"建设工程项目施工评标委员会人数应为5人以上单数，其中技术、经济等方面的专家不得少于总 人数的（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"1\u002F2",{"key":24,"text":519,"correct":26},"1\u002F3",{"key":28,"text":521,"correct":22},"2\u002F3",{"key":31,"text":523,"correct":26},"3\u002F4",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":31,"analysis":33},1100483,"根据《标准施工招标文件》，当重新招标时评标委员会否决所有投标，招标人应当（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":26},"再次发布招标公告进行招标",{"key":24,"text":531,"correct":26},"降低对投标人的资格要求再次招标",{"key":28,"text":533,"correct":26},"降低工程质量标准再次招标",{"key":31,"text":535,"correct":22},"采用直接发包形式委托施工任务",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1100484,"关于招标项目标底或投标限价的说法，正确的是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"若招标项目设有标底，开标时应当公布",{"key":24,"text":543,"correct":26},"设有最高投标限价时，应规定最低投标限价",{"key":28,"text":545,"correct":26},"评标时可以投标报价是否接近标底作为中标条件",{"key":31,"text":547,"correct":26},"可以投标报价超过标底上下15%作为否定投标的条件",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},1100485,"招标项目设有标底的，标底应当在（ ）时公布。",[552,554,556,558],{"key":20,"text":553,"correct":26},"发布招标公告",{"key":24,"text":555,"correct":26},"发售招标文件",{"key":28,"text":557,"correct":22},"开标",{"key":31,"text":559,"correct":26},"评标",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1100486,"关于施工招标项目标底的说法，正确的是（ ）",[564,566,568,570],{"key":20,"text":565,"correct":26},"施工招标项目必须有标底",{"key":24,"text":567,"correct":22},"标底应当在开标时公布",{"key":28,"text":569,"correct":26},"标底应当作为评标的依据",{"key":31,"text":571,"correct":26},"一个项目可以有几个不同的标底",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1100494,"关于评标委员会的说法，正确的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"评标委员会成员的名单应当在未发布中标结果前保密",{"key":24,"text":579,"correct":26},"评标委员会成员的名单应当在开标后确定",{"key":28,"text":581,"correct":26},"评标委员会中的技术专家不得多于成员总数的2\u002F3",{"key":31,"text":583,"correct":26},"评标委员会中的专家一律采取随机抽取方式确定",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},1100495,"关于投标中投标质疑的说法，正确的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"投标人可以主动要求进行说明",{"key":24,"text":591,"correct":26},"投标人的说明可以改变投标文件的实质性内容",{"key":28,"text":593,"correct":26},"评标委员会可以口头通知投标人进行说明",{"key":31,"text":595,"correct":22},"投标人的说明应当采用书面形式",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]