[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,7,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,211,223,235,247,259,269,281,293,305,317,329,341,353,365,377,389,401,413,422,432,441,453,461,473,483,493,505,517,529,538,550,562,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1100366,1,"单选题","(2017年真题)根据《标准施工合同》，施工期的结束日期是指（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","发包人组织的工程竣工验收合格日",false,{"key":24,"text":25,"correct":22},"B","工程施工合同中双方约定的完工日",{"key":27,"text":28,"correct":29},"C","工程接收证书中写明的实际竣工日",true,{"key":31,"text":32,"correct":22},"D","承包人施工任务的实际完工日","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1100367,"(2017年真题)根据《标准施工合同》，投保“建筑工程一切险”和“第三者责任险”的正确做法是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分别由发包人和承包人负责投保",{"key":24,"text":41,"correct":22},"均由发包人负责投保",{"key":27,"text":43,"correct":22},"分别由承包人和发包人负责投保",{"key":31,"text":45,"correct":29},"均由承包人负责投保",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1100368,"(2018年真题)《标准施工合同》通用条款规定的“基准日期”是指（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投标截止日",{"key":24,"text":53,"correct":22},"开标之日",{"key":27,"text":55,"correct":22},"中标通知书发出之日",{"key":31,"text":57,"correct":29},"投标截止日前28日",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1100369,"(2018年真题)《标准施工合同》中“暂估价”的含义是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"暂估价是指用于支付必然发生但暂时不能确定价格的计日工费用",{"key":24,"text":65,"correct":22},"暂估价是指可能发生的劳务分包费用",{"key":27,"text":67,"correct":22},"暂估价是指用于支付可能发生工程变更增加的费用",{"key":31,"text":69,"correct":29},"暂估价属于签约合同价的组成部分",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1100370,"(2018年真题)《标准施工合同》中的“合同工期”是指（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"承包人完成工程从开工之日起至实际竣工日经历的期限",{"key":24,"text":77,"correct":22},"合同协议书中写明的施工总日历天数",{"key":27,"text":79,"correct":22},"承包人从监理人发出的开工通知中写明的开工日起，至工程接收证书中写明的实际竣工日止的期限",{"key":31,"text":81,"correct":29},"承包人在投标函内承诺完成工程的时间期限，以及按照合同条款通过变更和索赔程序应给予的顺延工期时间之和",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1100371,"(2018年真题)《标准施工招标文件》的适用范围是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"大型复杂的工程项目",{"key":24,"text":89,"correct":22},"无投资主体的工程项目",{"key":27,"text":91,"correct":22},"工期在一年之内的工程项目",{"key":31,"text":93,"correct":22},"跨行业的工程项目",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1100372,"(2018年真题)根据《标准施工合同》，关于“暂列金额”的说法，正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"暂列金额未包括在签约合同价内",{"key":24,"text":101,"correct":22},"暂列金额不可以计日工方式支付",{"key":27,"text":103,"correct":29},"暂列金额可能全部使用或部分使用",{"key":31,"text":105,"correct":22},"暂列金额应按合同规定全部支付给承包人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1100373,"(2018年真题)根据《标准施工合同》，关于监理人对质量检验和试验的说法，正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"监理人收到承包人共同检验的通知，未按时参加检验，承包人单独检验，该检验无效",{"key":24,"text":113,"correct":22},"监理人对承包人的检验结果有疑问，要求承包人重新检验时，由监理人和第三方检测机构共同进行",{"key":27,"text":115,"correct":29},"监理人对承包人已覆盖的隐蔽工程部位质量有疑问时，有权要求承包人对已覆盖的部位进行解开重新检验",{"key":31,"text":117,"correct":22},"重新检验结果证明质量符合合同要求的，因此增加的费用由发包人和监理人共同承担",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1100374,"(2018年真题)根据《标准施工合同》，监理人在施工准备阶段的职责是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"按专用条款约定的时间向承包人无条件发出开工通知",{"key":24,"text":125,"correct":22},"在开工日期15日前向承包人发出开工通知",{"key":27,"text":127,"correct":29},"批准或要求修改承包人报送的施工进度计划",{"key":31,"text":129,"correct":22},"组织编制施工“合同进度计划”",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1100375,"(2018年真题)根据《标准施工合同》，下列引起暂停施工的情形中，属于承包人的责任的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":29},"施工技术事故",{"key":24,"text":137,"correct":22},"异常恶劣天气",{"key":27,"text":139,"correct":22},"不可抗力",{"key":31,"text":141,"correct":22},"因设计缺陷导致的设计变更",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1100376,"(2018年真题)根据《标准施工合同》履约担保的期限自发包人和承包人订立合同之日起至（ ）之日止。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工程竣工验收",{"key":24,"text":149,"correct":22},"工程缺陷责任期满",{"key":27,"text":151,"correct":29},"工程移交证书",{"key":31,"text":153,"correct":22},"签发最终结清证书",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1100377,"(2018年真题)根据《标准施工合同》通用条款，建筑工程一切险应由（ ）负责投保，并承担保险费用。",[158,160,162,164],{"key":20,"text":159,"correct":22},"发包人",{"key":24,"text":161,"correct":29},"承包人",{"key":27,"text":163,"correct":22},"发包人和承包人",{"key":31,"text":165,"correct":22},"监理人",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1100378,"(2018年真题)关于监理人的合同管理地位和职责的说法，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"在合同规定的权限范围内，监理人可独立处理变更估价、索赔等事项",{"key":24,"text":173,"correct":22},"监理人向承包人发出的指示，承包人征得发包人批准后执行",{"key":27,"text":175,"correct":22},"发包人可不通过监理人直接向承包人发出工程实施指令",{"key":31,"text":177,"correct":22},"监理人的指示错误给承包人造成损失，由承包人和监理人承担连带责任",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1100379,"(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，“不利气候条件”对施工的影响应当属于（ ）承担的风险。",[182,183,184,186],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":29},{"key":27,"text":185,"correct":22},"发包人和承包人共同",{"key":31,"text":187,"correct":22},"由专用条款约定的一方",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1100380,"(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，“合同进度计划”是指由（ ）的施工进度计划。",[192,194,196,198],{"key":20,"text":193,"correct":22},"发包人审定",{"key":24,"text":195,"correct":29},"监理人批准",{"key":27,"text":197,"correct":22},"承包人投标文件提交、",{"key":31,"text":199,"correct":22},"招标文件提出",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1100381,"(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，如果一个建设工程项目的施工采用平行发包的方式分别交由多个承包人施工，为防止重复投保或漏保，双方可在专用条款中约定由（ ）投保为宜。",[204,205,207,209],{"key":20,"text":159,"correct":29},{"key":24,"text":206,"correct":22},"其中一个承包人",{"key":27,"text":208,"correct":22},"多个承包人分别",{"key":31,"text":210,"correct":22},"组成联合体",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1100382,"(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，支付管理中的“合同价格”是指（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"协议书中的签约合同价格",{"key":24,"text":218,"correct":29},"承包人最终完成全部施工和保修义务后应得的全部合同价款",{"key":27,"text":220,"correct":22},"中标通知书中的中标价格",{"key":31,"text":222,"correct":22},"承包人的投标报价",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1100383,"(2019年真题)关于《标准施工招标文件》合同通用条款和专用条款的说法，正确的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"通用条款中适用于招标项目的条或款应在专用条款中体现",{"key":24,"text":230,"correct":29},"专用条款需要补充、细化的内容应与通用条款的条或款的序号一致",{"key":27,"text":232,"correct":22},"通用条款可以根据工程实际由合同当事人协商调整",{"key":31,"text":234,"correct":22},"专用条款可以约定合同当事人放弃部分通用条款",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},1100384,"(2019年真题)下列合同文件中，列入《标准施工招标文件》中施工合同文本中的合同附件格式的是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"协议书、投标保函、履约保函",{"key":24,"text":242,"correct":22},"投标保函、履约保函、预付款保函",{"key":27,"text":244,"correct":29},"协议书、预付款保函、履约保函",{"key":31,"text":246,"correct":22},"工程量清单、材料设备一览表、工程预付款明细单",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1100385,"(2019年真题)下列合同文件中，属于《标准施工招标文件》中施工合同文本的合同文件，在专用条款没有另行约定的情况下，其正确的解释次序是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"中标通知书、专用合同条款、通用合同条款、合同协议书",{"key":24,"text":254,"correct":22},"合同协议书、通用合同条款、专用合同条款、中标通知书",{"key":27,"text":256,"correct":29},"合同协议书、中标通知书、专用合同条款、通用合同条款",{"key":31,"text":258,"correct":22},"中标通知书、合同协议书、专用合同条款、通用合同条款",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1100387,"(2015年真题)采用《简明施工合同》的工程，负责材料和设备的供应人通常为（ ）。",[263,265,266,268],{"key":20,"text":264,"correct":22},"分包人",{"key":24,"text":159,"correct":29},{"key":27,"text":267,"correct":22},"施工项目部",{"key":31,"text":161,"correct":22},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},1100388,"(2015年真题)施工合同履行期间市场价格浮动对施工成本造成影响时，是否允许调整合同价格要视（ ）来决定。",[273,275,277,279],{"key":20,"text":274,"correct":29},"合同工期长短",{"key":24,"text":276,"correct":22},"材料价格浮动幅度",{"key":27,"text":278,"correct":22},"合同计价方式",{"key":31,"text":280,"correct":22},"劳动力价格浮动幅度",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1100389,"(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，缺陷责任期满（包括延长的期限终止）后14天内，应当向承包人出具缺陷任期终止证书，该证书由（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"发包人出具经监理人审核",{"key":24,"text":288,"correct":29},"监理人出具经发包人签认",{"key":27,"text":290,"correct":22},"发包人和监理人共同签认",{"key":31,"text":292,"correct":22},"监理人签认",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},1100390,"(2015年真题)根据《标准施工合同》，关于签约合同价总金额的说法，正确的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"只包括暂列金额，不包括暂估价",{"key":24,"text":300,"correct":22},"即不包括暂列金额，也不包括暂估价",{"key":27,"text":302,"correct":22},"不包括暂列金额，只包括暂估价",{"key":31,"text":304,"correct":29},"既包括暂列金额，也包括暂估价",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1100391,"(2015年真题)根据《标准施工合同》，采用公式法调价方式考虑市场价格浮动对合同价的影响，仅适用于工程量清单中的（ ）部分。",[309,311,313,315],{"key":20,"text":310,"correct":29},"单价支付",{"key":24,"text":312,"correct":22},"工程材料费用",{"key":27,"text":314,"correct":22},"总价支付",{"key":31,"text":316,"correct":22},"人工费用",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":27,"analysis":33},1100392,"(2016年真题)根据《标准施工合同》，发包人在施工合同订立阶段的义务是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"组织施工单位测设施工控制网",{"key":24,"text":324,"correct":22},"组织监理单位编制施工组织设计",{"key":27,"text":326,"correct":29},"组织设计单位进行设计交底",{"key":31,"text":328,"correct":22},"组织勘察单位进行现场查勘",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1100393,"(2017年真题)根据《标准设计施工总承包招标文件》中的《合同条款及格式》，在合同履行过程中，承包人提出合理化建议时，正确的处理程序是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":29},"承包人向监理人提出——监理人与发包人协商——监理人向承包人发出变更指示",{"key":24,"text":336,"correct":22},"承包人向监理人提出——监理人向发包人报告——发包人与承包人协商合同变更",{"key":27,"text":338,"correct":22},"承包人向发包人提出——发包人与监理人协商——监理人向承包人发出变更指示",{"key":31,"text":340,"correct":22},"承包人向发包人提出——发包人通知监理人——监理人向承包人发出变更指示",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1100394,"(2017年真题)工程施工过程中，对于变更工作的单价在已标价工程量清单中无法适用或类似子目时，应由监理人按照（ ）的原则商定或确定。",[345,347,349,351],{"key":20,"text":346,"correct":22},"成本加酬金",{"key":24,"text":348,"correct":29},"成本加利润",{"key":27,"text":350,"correct":22},"成本加规费",{"key":31,"text":352,"correct":22},"直接成本加间接成本",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},1100395,"(2014年真题)根据《标准施工合同》，下列事件中，属于不可抗力的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"政策汇率调整",{"key":24,"text":360,"correct":22},"世界金融危机",{"key":27,"text":362,"correct":22},"政府投资政策变化",{"key":31,"text":364,"correct":29},"局部武装暴动",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1100396,"(2014年真题)根据《标准施工合同》，不属于施工合同履行中“不利物质条件”的是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"不利地质条件",{"key":24,"text":372,"correct":22},"不利水文条件",{"key":27,"text":374,"correct":22},"有毒作业环境",{"key":31,"text":376,"correct":29},"不利气候条件",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1100397,"(2014年真题)根据《标准施工合同》，承包人向监理人递交索赔意向书的时效是（ ）天。",[381,383,385,387],{"key":20,"text":382,"correct":22},"7",{"key":24,"text":384,"correct":22},"14",{"key":27,"text":386,"correct":29},"28",{"key":31,"text":388,"correct":22},"30",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1100398,"(2011年真题)根据《建设工程施工合同（示范文本）》，下列关于承包人提交索赔意向通知的说法中，正确的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"承包人应向发包人提交索赔意向通知",{"key":24,"text":396,"correct":29},"承包人应向监理人提交索赔意向通知",{"key":27,"text":398,"correct":22},"承包人提交索赔意向通知没有期限限制",{"key":31,"text":400,"correct":22},"承包人不提交索赔意向通知不会导致索赔权利丧失",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1100399,"(2020年真题)关于建设工程合同承包人工程价款优先受偿权的说法，正确的是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"装饰装修工程的分包人，请求装饰装修工程价款就该装饰装修工程折价或者拍卖的价款优先受偿的，人民法院应予支持",{"key":24,"text":408,"correct":29},"优先受偿的范围包括承包人应获得的利润",{"key":27,"text":410,"correct":22},"施工合同无效或建筑工程未经竣工验收，承包人不得行使工程价款的优先受偿权",{"key":31,"text":412,"correct":22},"承包人行使优先受偿权的期限为1年，自发包人应当给付建设工程价款之日起计算",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1100400,"(2017年真题)根据《标准施工合同》，监理人收到承包人提交的工程竣工验收申请报告后，经审查认为已具备竣工验收条件时，应在收到工程竣工验收申请报告后的（ ）天内提请发包人进行工程验收。",[417,418,419,421],{"key":20,"text":382,"correct":22},{"key":24,"text":384,"correct":22},{"key":27,"text":420,"correct":22},"21",{"key":31,"text":386,"correct":29},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1100401,"(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，竣工验收管理程序中，监理人审查竣工验收申请报告的各项内容，认为工程尚不具备竣工验收条件时，应当在收到竣工申请报告后（ ）天内通知承包人。",[426,427,428,430],{"key":20,"text":386,"correct":29},{"key":24,"text":388,"correct":22},{"key":27,"text":429,"correct":22},"56",{"key":31,"text":431,"correct":22},"60",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":31,"analysis":33},1100402,"(2016年真题)根据《标准施工合同》，发包人在收到承包人竣工验收申请报告（ ）天后未进行验收，视为验收合格。",[436,437,438,440],{"key":20,"text":384,"correct":22},{"key":24,"text":386,"correct":22},{"key":27,"text":439,"correct":22},"42",{"key":31,"text":429,"correct":29},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},1100403,"(2015年真题)根据《标准施工合同》，缺陷责任期满承包人提交最终结清单前，仍有权提出索赔要求。索赔的原因应是在（ ）发生的事项。",[445,447,449,451],{"key":20,"text":446,"correct":22},"施工期间",{"key":24,"text":448,"correct":22},"竣工验收期间",{"key":27,"text":450,"correct":29},"缺陷责任期内",{"key":31,"text":452,"correct":22},"合同有效期内",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1100404,"(2016年真题)工程施工过程中，对于变更工作的单价在已标价工程量清单中无适用或类似子目时，应由监理人按照（ ）的原则商定或确定。",[457,458,459,460],{"key":20,"text":346,"correct":22},{"key":24,"text":348,"correct":29},{"key":27,"text":350,"correct":22},{"key":31,"text":352,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1100405,"(2017年真题)根据《标准施工合同》，工程施工中承包人有权得到费用和工期补偿，但无利润补偿的情形是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"发包人提供图纸延误",{"key":24,"text":468,"correct":29},"不利的物质条件",{"key":27,"text":470,"correct":22},"隐蔽工程重新检验质量合格",{"key":31,"text":472,"correct":22},"监理人指示错误",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},1100407,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，负有投保义务的- -方当事人未按合同约定办理保险，导致受益人未能得到保险人赔偿的，损失赔偿应由（ ）承担。",[477,478,479,481],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":22},{"key":27,"text":480,"correct":22},"受益人",{"key":31,"text":482,"correct":29},"负有投保义务的当事人",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},1100408,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，监理人征得发包人同意后，应提前（ ）日向承包人发出开工通知。",[487,488,490,491],{"key":20,"text":382,"correct":29},{"key":24,"text":489,"correct":22},"10",{"key":27,"text":384,"correct":22},{"key":31,"text":492,"correct":22},"15",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":31,"analysis":33},1100409,"（2020年真题）根据《标准施工招标文件》，合同文件的优先解释顺序是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"技术标准和要求— 图纸—已标价工程量清单—投标函 及其附录",{"key":24,"text":500,"correct":22},"投标函及其附录一已标价工程量清单一技术标准和要求一图纸",{"key":27,"text":502,"correct":22},"技术标准和要求—投标函及其附录—图纸—已标价工程量清单",{"key":31,"text":504,"correct":29},"投标函及其附录—技术标准和要求—图纸—已标价工程量清单",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},1100410,"（2020年真题）根据《标准设计招标文件》中的通用合同条款，下列工程勘察合同组成文件中，优先解释顺序排在中标通知书之前的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":29},"合同协议书",{"key":24,"text":512,"correct":22},"专用合同条款",{"key":27,"text":514,"correct":22},"勘察费用清单",{"key":31,"text":516,"correct":22},"通用合同条款",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},1100411,"（2020年真题）通用条款规定的费用是指（ ）",[521,523,525,527],{"key":20,"text":522,"correct":29},"施工合同履行中发生的不计利润的合理开支",{"key":24,"text":524,"correct":22},"施工合同履行中由发包人支付给承包人的全部款项",{"key":27,"text":526,"correct":22},"发包人对承包人履行合同支付的结算价",{"key":31,"text":528,"correct":22},"承包人完成工程的实际成本",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":27,"analysis":33},1100412,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，在暂停施工期间，负贵施工现场保护和安全保障的主体是（ ）。",[533,534,535,536],{"key":20,"text":159,"correct":22},{"key":24,"text":165,"correct":22},{"key":27,"text":161,"correct":29},{"key":31,"text":537,"correct":22},"监理人和承包人",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1100413,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，关于监理人对承包人的材料、设备和工程的质量试验和检验的说法，正确的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"承包人按合同约定进行材料、设备和工程的试验和检验，均须由监理人组织",{"key":24,"text":545,"correct":22},"监理．人未按合同约定派员参加试验和检验的，承包人应重新组织试验和检验",{"key":27,"text":547,"correct":22},"监理人对承包人的试验和检验结果有疑间，要求承包人重新试验和检验的，须经发包人同意",{"key":31,"text":549,"correct":29},"监理人提出的重新试验和检验证明材料、设备和工程的质量不符合合同要求的，由此造成的费用增加和工期延误由承包人承担",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1100414,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，发包人根据实际情况向承包人提出提前竣工要求的，应在提前竣工协议中明确的内容是（ ） ．",[554,556,558,560],{"key":20,"text":555,"correct":29},"承包人修订的进度计划和赶工措施，发包人提供的条件和追加的合同价款",{"key":24,"text":557,"correct":22},"发包人提出的赶工要求和追加合同价款，承包人要求的奖励办法",{"key":27,"text":559,"correct":22},"发包人修订的进度计划和奖励办法，承包人提出的赶I措施和追加的费用",{"key":31,"text":561,"correct":22},"承包人修订的进度计划和施工条件要求，发包人的工期要求和追加的合同价款",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1100415,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，发包人负责提供的材料和工程设备经验收后，接收保管和施工现场内二次搬运所发生的费用由（ ）承担。",[566,567,568,569],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":29},{"key":27,"text":163,"correct":22},{"key":31,"text":570,"correct":22},"发包人和材料设备供应商",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},1100416,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，采用公式法调整工程价款时，合同约定变更范围和内容导致调整公式中的权重不合理时，由监理人与（ ）协商后进行调整。",[575,577,579,581],{"key":20,"text":576,"correct":22},"发包人和分包人",{"key":24,"text":578,"correct":22},"承包人和分包人",{"key":27,"text":580,"correct":29},"承包人和发包人",{"key":31,"text":582,"correct":22},"分包人和造价管理部门",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":27,"analysis":33},1100417,"（2020年真题）根据《标准施工招标文件》，关于暂估价的说法，正确的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"暂估价是指签约合同价之外用于支付部分材料设备的费用或专业工程价款",{"key":24,"text":590,"correct":22},"暂估价是指施工合同履行中可能发生的工程费用",{"key":27,"text":592,"correct":29},"暂估价是指发包人在工程量清单中写明支付但暂时不能确定价格的工程款项",{"key":31,"text":594,"correct":22},"暂估价内的工程材料设备或专业工程施工均须由承包人负责提供",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]