[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,6,50,2250,[13,34,46,58,70,82,93,105,115,124,135,147,155,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,341,349,361,373,385,397,409,421,433,445,457,469,481,493,505,517,529,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1100316,1,"单选题","根据《标准施工合同》，施工准备阶段设计交底应由（ ）组织。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","设计人",false,{"key":24,"text":25,"correct":22},"B","监理人",{"key":27,"text":28,"correct":29},"C","发包人",true,{"key":31,"text":32,"correct":22},"D","总承包人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1100317,"土方填筑工程的施工中，因连续降雨导致停工15天，其中6天的降雨强度超过专用条款约定的标准构成延长合同工期的条件，则需要承包人应承担的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"其中6天的不利气候条件风险",{"key":24,"text":41,"correct":29},"其余9天的不利气候条件风险",{"key":27,"text":43,"correct":22},"停工15天的工期延误",{"key":31,"text":45,"correct":22},"停工15天造成的费用损失",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1100318,"承包人以基准日期前的市场价格编制工程报价。长期合同中调价公式中的可调因素价格指数来源于（ ）的价格。",[50,52,54,56],{"key":20,"text":51,"correct":29},"基准日",{"key":24,"text":53,"correct":22},"基准日3日前",{"key":27,"text":55,"correct":22},"基准日7日前",{"key":31,"text":57,"correct":22},"上一年度同期基准日",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1100319,"如果投保工程一切险的保险金额少于工程实际价值，工程受到保险事件的损害时，不能从保险公司获得实际损失的全额赔偿，则损失赔偿的不足部分按合同相应条款的约定，由该事件的（ ）负责补偿。",[62,64,66,68],{"key":20,"text":63,"correct":22},"保险人",{"key":24,"text":65,"correct":22},"被保险人",{"key":27,"text":67,"correct":22},"受益人",{"key":31,"text":69,"correct":29},"风险责任方",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1100320,"采用设计施工总承包，工程竣工验收未能通过，经过承包人修正缺陷再次验收检验合格。这种情况下，计算承包人的实际竣工日期应为()的日期。",[74,76,78,80],{"key":20,"text":75,"correct":22},"承包人第一次提交竣工验收报告",{"key":24,"text":77,"correct":29},"承包人修改后再次提交竣工验收报告",{"key":27,"text":79,"correct":22},"最终验收合格",{"key":31,"text":81,"correct":22},"办理竣工验收手续",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1100321,"由于施工过程中，施工单位甲某违反操作规定，直接将拆除的模板从上往下扔，将其扔到了维护的外侧，砸伤路人乙某，则乙某的医护费用由()承担。",[86,87,89,91],{"key":20,"text":28,"correct":22},{"key":24,"text":88,"correct":29},"承包人",{"key":27,"text":90,"correct":22},"甲某",{"key":31,"text":92,"correct":22},"乙某",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1100322,"关于施工阶段施工部位检查的表述中，不正确的是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":29},"承包人自检确认的工程隐蔽部位具备覆盖条件后即无需通知监理人检查",{"key":24,"text":100,"correct":22},"经监理人检查确认质量符合隐蔽要求，并在检查记录上签字后，承包人才能进行覆盖",{"key":27,"text":102,"correct":22},"监理人检查确认质量不合格的，承包人应在监理人指示的时间内修整或返工后，由监理人重新检查",{"key":31,"text":104,"correct":22},"承包人应对施工工艺进行全过程的质量检查和检验，认真执行自检、互检和工序交叉检验制度",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1100323,"根据《标准施工合同》，投保工程一切险的保险金额不足以赔偿实际损失时，差额部分应由（ ）进行补偿。",[109,110,111,113],{"key":20,"text":28,"correct":22},{"key":24,"text":88,"correct":22},{"key":27,"text":112,"correct":22},"造价咨询机构",{"key":31,"text":114,"correct":29},"合同条款确定的该风险责任人",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},1100324,"应根据合同工程的施工需要，负责办理取得出入施工场地的专用和临时道路的通行权，以及取得为工程建设所需修建场外设施的权利，并承担有关费用的主体是（ ）。",[119,120,121,123],{"key":20,"text":88,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":122,"correct":22},"勘察人",{"key":31,"text":28,"correct":29},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},1100325,"建设工程施工合同，施工组织设计完成后，承包人按专用条款的约定，将施工进度计划和施工方案说明报送（ ）审批。",[128,130,132,134],{"key":20,"text":129,"correct":22},"设计单位负责人",{"key":24,"text":131,"correct":22},"勘察单位负责人",{"key":27,"text":133,"correct":22},"总承包单位负责人",{"key":31,"text":25,"correct":29},{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":24,"analysis":33},1100326,"下列关于变更管理的说法，错误的是（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"直接指示的变更属于必须实施的变更",{"key":24,"text":142,"correct":29},"承包人建议的变更可以以口头形式提交监理人",{"key":27,"text":144,"correct":22},"承包人提出的变更涉及建议变更和要求变更两类",{"key":31,"text":146,"correct":22},"与承包人协商后确定的变更属于可能发生的变更",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":24,"analysis":33},1100327,"暂停施工期间由（）负责妥善保护工程并提供安全保障。",[151,152,153,154],{"key":20,"text":28,"correct":22},{"key":24,"text":88,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":21,"correct":22},{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":20,"analysis":33},1100328,"缺陷责任期内工程运行期间出现的工程缺陷，()应负责修复，直到检验合格为止。",[159,160,161,163],{"key":20,"text":88,"correct":29},{"key":24,"text":28,"correct":22},{"key":27,"text":162,"correct":22},"业主",{"key":31,"text":164,"correct":22},"责任人",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1100329,"某工程项目，承包人于2013年5月1日提交了工程竣工报告，5月15日通过了工程师组织的工程预验收，5月25日发包人组织工程验收，5月28日监理人向承包人出具有经发包人签认的工程接收证书，承包人的竣工日期应确定为()。",[169,171,173,175],{"key":20,"text":170,"correct":29},"5月1日",{"key":24,"text":172,"correct":22},"5月15日",{"key":27,"text":174,"correct":22},"5月25日",{"key":31,"text":176,"correct":22},"5月28日",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1100330,"下列情况承包人只能索赔工期和费用的是()。",[181,183,185,187],{"key":20,"text":182,"correct":22},"发包人要求违法",{"key":24,"text":184,"correct":29},"不可预见物质条件",{"key":27,"text":186,"correct":22},"发包人要求提前交货",{"key":31,"text":188,"correct":22},"发包人原因指示的暂停施工",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1100331,"承包人施工期从监理人发出的开工通知中写明的开工日起算，至工程接收证书中写明的实际竣工日止的时间称为（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":29},"施工期",{"key":24,"text":196,"correct":22},"合同工期",{"key":27,"text":198,"correct":22},"缺陷责任期",{"key":31,"text":200,"correct":22},"保修期",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1100332,"根据《标准设计施工总承包合同》，工程实施中应给予承包人延长工期、增加费用并支付合理利润的情形是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"异常恶劣的气候条件",{"key":24,"text":208,"correct":22},"不可预见的物质条件",{"key":27,"text":210,"correct":29},"监理人的指示错误",{"key":31,"text":212,"correct":22},"发包人提供的材料提前交货",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1100333,"发包人应在监理人出具竣工付款证书后的（ ）d内，将应支付款支付给承包人。",[217,219,221,223],{"key":20,"text":218,"correct":22},"7",{"key":24,"text":220,"correct":29},"14",{"key":27,"text":222,"correct":22},"21",{"key":31,"text":224,"correct":22},"28",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},1100334,"施工阶段因承包人原因造成工程质量达不到合同约定验收标准，监理人有权要求承包人返工直至符合合同要求为止，由此造成的（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"费用增加由发包人承担，工期延误由承包人承担",{"key":24,"text":232,"correct":22},"费用增加由承包人承担，工期延误由发包人承担",{"key":27,"text":234,"correct":29},"费用增加和(或)工期延误由承包人承担",{"key":31,"text":236,"correct":22},"费用增加和(或)工期延误由发包人承担",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":27,"analysis":33},1100335,"关于竣工验收的表述中，不正确的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"以承包人提交竣工验收申请报告的日期为实际竣工日期，并在工程接收证书中写明",{"key":24,"text":244,"correct":22},"实际竣工日用以计算施工期限，与合同工期对照判定承包人是提前竣工还是延误竣工",{"key":27,"text":246,"correct":29},"发包人在收到承包人竣工验收申请报告56d后未进行验收，视为未通过验收",{"key":31,"text":248,"correct":22},"实际竣工日期以提交竣工验收申请报告的日期为准，但发包人由于不可抗力不能进行验收的情况除外",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1100336,"(2009年真题)按照施工合同示范文本规定，下列关于发包人供应的材料设备运至施工现场后（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"应当由发包人保管",{"key":24,"text":256,"correct":29},"应当由承包人保管",{"key":27,"text":258,"correct":22},"应当由监理人保管",{"key":31,"text":260,"correct":22},"应当由材料供应商保管",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1100337,"(2009年真题)施工合同履行中，发包人另行发包的设备安装工程开始施工，合同中没有规定承包人有配合安装的义务。监理人为避免施工的交叉干扰发出暂停部分土建施工指示，导致土建承包人的损失，由（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":29},"发包人承担，批准顺延工期",{"key":24,"text":268,"correct":22},"发包人承担，不批准顺延工期",{"key":27,"text":270,"correct":22},"承包人承担，可以顺延工期",{"key":31,"text":272,"correct":22},"承包人承担，工期不可顺延",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1100338,"(2011年真题)某工程施工合同约定的工期为20个月，专用条款规定承包人提前竣工或延误竣工均按月计算奖金或延误损害赔偿金。施工至第16个月，因承包人原因导致实际进度滞后于计划进度。承包人修改后的进度计划的竣工时间为第22个月，工程师认可了该进度计划的修改。承包人的实际施工期为21个月。下列关于承包人的工期责任的说法中，正确的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"提前工期1个月给予承包人奖励",{"key":24,"text":280,"correct":29},"延误工期1个月追究承包人拖期违约责任",{"key":27,"text":282,"correct":22},"对承包人既不追究拖期违约责任，也不给予奖励",{"key":31,"text":284,"correct":22},"因工程师对修改进度计划的认可，按延误工期0.5个月追究承包人违约责任",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1100339,"(2012年真题)某施工合同履行过程中，承包人因自身原因造成实际工程进度滞后计划进度，按照工程师要求对进度计划进行了修改，并得到工程师的确认。但执行修改后的进度计划，仍不能按期完工。下列关于该拖期的处理方法中，正确的是（ )",[289,291,293,295],{"key":20,"text":290,"correct":22},"追究承包人拖期违约责任时，减少合同约定的日拖期赔偿金额",{"key":24,"text":292,"correct":22},"工程师对确认进度计划负责，承担部分拖期完工违约金",{"key":27,"text":294,"correct":29},"承包人按合同约定的拖期违约金的计算办法承担违约责任",{"key":31,"text":296,"correct":22},"按照修改后的进度计划确认新的合同工期，不视为拖期完工",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1100340,"(2014年真题)根据《标准施工合同》，关于承包人施工安全责任的说法，正确的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":29},"承包人应按合同约定的安全工作内容编制施工安全措施计划",{"key":24,"text":304,"correct":22},"合同约定的安全施工措施所需费用由承包人承担，安全作业环境所需费用由发包人承担",{"key":27,"text":306,"correct":22},"承包人对施工现场所有人员的工伤事故承担责任",{"key":31,"text":308,"correct":22},"因采取合同未约定的安全施工措施增加的费用由承包人自行承担",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1100341,"(2014年真题)根据《标准施工合同》，关于暂估价的说法，错误的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"暂估价是签约合同价的组成部分",{"key":24,"text":316,"correct":29},"暂估价内的专业工程不一定实施",{"key":27,"text":318,"correct":22},"暂估价的内容在投标时难以确定准确价格",{"key":31,"text":320,"correct":22},"非招标项目，暂估价由承包人负责提供，监理确认",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1100342,"(2014年真题)根据《标准施工合同》，施工合同文件包括（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"招标文件",{"key":24,"text":328,"correct":29},"投标函及投标函附录",{"key":27,"text":330,"correct":22},"委托监理协议书",{"key":31,"text":332,"correct":22},"投标企业定额标准",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},1100343,"(2014年真题)根据《标准施工合同》，施工准备阶段设计交底应由（ ）组织。",[337,338,339,340],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},1100344,"(2014年真题)根据《标准施工合同》，投保工程一切险的保险金额不足以赔偿实际损失时，差额部分应由（ ）进行补偿。",[345,346,347,348],{"key":20,"text":28,"correct":22},{"key":24,"text":88,"correct":22},{"key":27,"text":114,"correct":29},{"key":31,"text":112,"correct":22},{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":27,"analysis":33},1100345,"(2015年真题)根据《标准施工合同》，“合同进度计划”是指（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":22},"承包人投标书内提交的进度计划",{"key":24,"text":356,"correct":22},"施工准备阶段承包人编制的进度计划",{"key":27,"text":358,"correct":29},"承包人按监理人指示修改后经监理人批准的进度计划",{"key":31,"text":360,"correct":22},"承包人按监理人指示修改后经发包人批准的进度计划",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},1100346,"(2015年真题)根据《标准施工合同》，承包人需要变动保险合同条款时，正确的处理方式是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"直接与保险人协商一致后，通知发包人",{"key":24,"text":368,"correct":22},"直接与保险人协商一致后，通知监理人",{"key":27,"text":370,"correct":29},"应事先征得发包人同意，并通知监理人",{"key":31,"text":372,"correct":22},"应事先征得监理人同意，并通知发包人",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},1100347,"(2015年真题)根据《标准施工合同》，关于监理人指示的说法，错误的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"发布指示前与当事人双方协商，尽量达成一致",{"key":24,"text":380,"correct":22},"监理人的指示无权免除合同约定的承包人义务",{"key":27,"text":382,"correct":22},"监理人的指示无权变更合同约定的承包人权力",{"key":31,"text":384,"correct":29},"监理人的指示有权变更合同约定的发包人义务",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1100348,"(2015年真题)根据《标准施工合同》，监理人在工程施工准备阶段的职责是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"组织施工图设计交底",{"key":24,"text":392,"correct":29},"审查承包人质量管理体系",{"key":27,"text":394,"correct":22},"组织专项施工方案论证",{"key":31,"text":396,"correct":22},"审查暂估价及暂列金额",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},1100349,"(2015年真题)根据《标准施工合同》，就图纸、通用合同条款和已标价的工程量清单而言，优先解释的顺序是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"已标价的工程量清单→通用合同条款→图纸",{"key":24,"text":404,"correct":22},"已标价的工程量清单→图纸→通用合同条款",{"key":27,"text":406,"correct":22},"通用合同条款→已标价的工程量清单→图纸",{"key":31,"text":408,"correct":29},"通用合同条款→图纸→已标价的工程量清单",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1100350,"(2016年真题)根据《标准施工合同》，当中标通知书、图纸和专用合同条款出现含义或内容矛盾时，合同文件的优先解释的顺序是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"图纸→专用合同条款→中标通知书",{"key":24,"text":416,"correct":22},"图纸→中标通知书→专用合同条款",{"key":27,"text":418,"correct":22},"中标通知书→图纸→专用合同条款",{"key":31,"text":420,"correct":29},"中标通知书→专用合同条款→图纸",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1100351,"(2016年真题)根据《标准施工合同》，对于发包人提供的材料和工程设备，承包人应在约定时间内，（ ）共同进行验收。",[425,427,429,431],{"key":20,"text":426,"correct":29},"会同监理人在交货地点",{"key":24,"text":428,"correct":22},"会同发包人代表、监理人在交货地点",{"key":27,"text":430,"correct":22},"会同监理人在施工现场",{"key":31,"text":432,"correct":22},"会同发包人代表、监理人在施工现场",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},1100352,"(2016年真题)根据《标准施工合同》，发包人在工程施工准备阶段的义务是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"组织施工单位测设施工控制网",{"key":24,"text":440,"correct":22},"组织监理单位编制施工组织设计",{"key":27,"text":442,"correct":29},"组织设计单位进行设计交底",{"key":31,"text":444,"correct":22},"组织勘察单位进行现场勘查",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1100353,"(2016年真题)根据《标准施工合同》，关于预付款担保方式及生效的说法，正确的是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":29},"采用无条件担保方式，并自预付款支付给承包人起生效",{"key":24,"text":452,"correct":22},"采用有条件担保方式，并自预付款支付给承包人起生效",{"key":27,"text":454,"correct":22},"采用无条件担保方式，并自合同协议书签订之日起生效",{"key":31,"text":456,"correct":22},"采用有条件担保方式，并自合同协议书签订之日起生效",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1100354,"(2016年真题)根据《标准施工合同》，合同附件格式包括（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"项目经理任命书",{"key":24,"text":464,"correct":29},"合同协议书",{"key":27,"text":466,"correct":22},"工程设备表",{"key":31,"text":468,"correct":22},"建筑材料表",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1100355,"(2016年真题)根据《标准施工合同》，合同工期应自（ ）载明的开工日起计算。",[473,475,477,479],{"key":20,"text":474,"correct":22},"发包人发出的中标通知书",{"key":24,"text":476,"correct":29},"监理人发出的开工通知",{"key":27,"text":478,"correct":22},"合同双方签订的合同协议书",{"key":31,"text":480,"correct":22},"监理人批准的施工进度计划",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},1100356,"(2016年真题)根据《标准施工合同》，投保“建筑工程一切险”的正确做法是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":29},"承包人负责投保，并承担办理保险的费用",{"key":24,"text":488,"correct":22},"发包人负责投保，并承担办理保险的费用",{"key":27,"text":490,"correct":22},"承包人负责投保，发包人承担办理保险的费用",{"key":31,"text":492,"correct":22},"发包人负责投保，承包人承担办理保险的费用",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":27,"analysis":33},1100357,"(2016年真题)根据《标准施工合同》，因承包人原因未在约定的工期内竣工时，原约定竣工日的价格指数和实际支付日的价格指数会有所不同，后续支付时应将（ ）作为支付计算的价格指数。",[497,499,501,503],{"key":20,"text":498,"correct":22},"两个价格指数中的较高者",{"key":24,"text":500,"correct":22},"两个价格指数中的均值",{"key":27,"text":502,"correct":29},"两个价格指数中的较低者",{"key":31,"text":504,"correct":22},"两个价格指数按约定比例的均值",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},1100358,"(2016年真题)根据《标准施工合同》，因承包人原因逾期竣工时，承包人应支付逾期竣工违约金，最高赔偿限额为（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"工程结算价的2%",{"key":24,"text":512,"correct":22},"签约合同价的2%",{"key":27,"text":514,"correct":22},"工程结算价的3%",{"key":31,"text":516,"correct":29},"签约合同价的3%",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1100359,"(2016年真题)为了明确划分由于政策法规变化或市场物价浮动对合同价格影响的责任，《标准施工合同》中的通用条款规定的基准日期是指（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"投标截止日前第14天",{"key":24,"text":524,"correct":29},"投标截止日前第28天",{"key":27,"text":526,"correct":22},"招标公告发布之日前14天",{"key":31,"text":528,"correct":22},"招标公告发布之日前28天",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},1100360,"(2017年真题)根据《标准施工合同》，承包人在工程施工准备阶段的义务是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"办理出入施工现场的道路通行手续",{"key":24,"text":536,"correct":29},"建立施工现场质量管理体系",{"key":27,"text":538,"correct":22},"确定施工测量的基准点和基准线",{"key":31,"text":540,"correct":22},"收集地下管线和地下设施相关资料",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":27,"analysis":33},1100361,"(2017年真题)根据《标准施工合同》，当投标函、合同协议书和通用合同条款出现含义或内容矛盾时，优先解释的顺序是（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"投标函→合同协议书→通用合同条款",{"key":24,"text":548,"correct":22},"投标函→通用合同条款→合同协议书",{"key":27,"text":550,"correct":29},"合同协议书→投标函→通用合同条款",{"key":31,"text":552,"correct":22},"合同协议书→通用合同条例→投标函",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},1100362,"(2017年真题)根据《标准施工合同》，对于未达到必须招标规模或标准的项目，可由监理人在暂估价内直接确定价格的是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"临时设施",{"key":24,"text":560,"correct":22},"建筑材料",{"key":27,"text":562,"correct":22},"工程设备",{"key":31,"text":564,"correct":29},"专业工程",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1100363,"(2017年真题)根据《标准施工合同》，工程预付款担保采用的形式是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"第三方保证",{"key":24,"text":572,"correct":22},"动产质押",{"key":27,"text":574,"correct":22},"既有建筑物抵押",{"key":31,"text":576,"correct":29},"银行保函",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},1100364,"(2017年真题)根据《标准施工合同》，合同协议书中除明确规定合同组成文件外，双方在订立合同时还必须填写的内容包括（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"结算方式",{"key":24,"text":584,"correct":22},"预付款支付时间",{"key":27,"text":586,"correct":29},"质量标准",{"key":31,"text":588,"correct":22},"合同争议解决方式",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},1100365,"(2017年真题)根据《标准施工合同》，监理人征得发包人同意后，应在开工日期（ ）天前向承包人发出开工通知。",[593,594,595,596],{"key":20,"text":218,"correct":29},{"key":24,"text":220,"correct":22},{"key":27,"text":222,"correct":22},{"key":31,"text":224,"correct":22},[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]