[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-44":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,44,50,2250,[13,38,53,68,82,96,111,125,139,153,168,182,197,212,226,240,254,269,281,296,310,325,340,354,368,383,398,412,426,440,455,469,483,497,511,525,539,553,567,581,596,610,625,639,653,665,679,693,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1102609,2,"多选题","根据《标准施工招标文件》的规定，（ ）情况，可以不再招标。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","重新招标后投标人仍少于3个",true,{"key":24,"text":25,"correct":22},"B","重新招标后所有投标被否决",{"key":27,"text":28,"correct":29},"C","发包方认为可以不招标的",false,{"key":31,"text":32,"correct":29},"D","未提交投标保证金的",{"key":34,"text":35,"correct":29},"E","未提交履约保证金的","AB","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1102610,"投标人须知中的附表格式包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"投标函格式",{"key":24,"text":45,"correct":22},"开标记录表格式",{"key":27,"text":47,"correct":22},"问题澄清通知书格式",{"key":31,"text":49,"correct":22},"中标通知书格式",{"key":34,"text":51,"correct":29},"合同协议书格式","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1102611,"根据《标准施工招标文件》，投标人须知包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"投标人的资格要求",{"key":24,"text":60,"correct":22},"对工程分包的要求或限制",{"key":27,"text":62,"correct":22},"投标有效期",{"key":31,"text":64,"correct":29},"评标办法",{"key":34,"text":66,"correct":29},"合同条款及格式","ABC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":81,"analysis":37},1102612,"以下（ ）属于招标公告的内容。",[72,74,76,77,79],{"key":20,"text":73,"correct":22},"项目概况",{"key":24,"text":75,"correct":22},"投标人资格要求",{"key":27,"text":64,"correct":29},{"key":31,"text":78,"correct":29},"通用条款",{"key":34,"text":80,"correct":22},"招标文件的获取方式","ABE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":52,"analysis":37},1102613,"以下属于资质预审审查报告内容的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"评标方法",{"key":24,"text":89,"correct":22},"资格审查委员会名单",{"key":27,"text":91,"correct":22},"澄清、说明、补正事项纪要等",{"key":31,"text":93,"correct":22},"评分比较一览表的排序",{"key":34,"text":95,"correct":29},"投标文件格式要求",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1102614,"组织投标人踏勘现场的时间一般应在（ ）之前进行。",[100,102,104,106,108],{"key":20,"text":101,"correct":29},"投标预备会召开15日之前",{"key":24,"text":103,"correct":22},"投标预备会召开之前",{"key":27,"text":105,"correct":29},"投标人资格预审之前",{"key":31,"text":107,"correct":29},"发售招标文件之前",{"key":34,"text":109,"correct":22},"投标截止时间15日之前","BE",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":52,"analysis":37},1102615,"当评标专家为以下（ ）情况时，根据《标准施工招标文件》的规定需要回避。",[115,117,119,121,123],{"key":20,"text":116,"correct":29},"招标人或者招标人主要负责人的近亲属",{"key":24,"text":118,"correct":22},"投标人或者投标人主要负责人的近亲属",{"key":27,"text":120,"correct":22},"项目主管部门或者行政监督部门的人员",{"key":31,"text":122,"correct":22},"与投标人有经济利益关系，可能影响对投标公正评审的",{"key":34,"text":124,"correct":29},"受过行政处罚或刑事处罚的",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":36,"analysis":37},1102616,"根据规定，行业标准施工招标文件和试点项目的招标文件，应不加修改地引用《标准施工招标文件》中的（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"投标人须知正文",{"key":24,"text":132,"correct":22},"评标办法正文",{"key":27,"text":134,"correct":29},"通用合同条款",{"key":31,"text":136,"correct":29},"技术标准和要求",{"key":34,"text":138,"correct":29},"投标文件格式",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":36,"analysis":37},1102617,"根据《标准资格预审文件》，资格预审的方法（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"合格制",{"key":24,"text":146,"correct":22},"有限数量制",{"key":27,"text":148,"correct":29},"综合评分法",{"key":31,"text":150,"correct":29},"经评审的最低投标价法",{"key":34,"text":152,"correct":29},"最低评标价法",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":37},1102618,"根据《标准施工招标文件》的规定，存在以下（ ）情况时，资格预审不得通过。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"申请人为项目前期准备提供设计或咨询服务（设计施工总承包除外）",{"key":24,"text":160,"correct":22},"申请人为招标人不具备独立法人资格的附属机构",{"key":27,"text":162,"correct":22},"申请人为本项目的招标代理人",{"key":31,"text":164,"correct":29},"申请人为施工总承包三级资质",{"key":34,"text":166,"correct":22},"申请人本年内有骗取中标或严重违约或重大工程质量问题","ABCE",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":67,"analysis":37},1102619,"根据《标准资格预审文件》的规定，以下（ ）属于初步审查标准。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"申请函的签字盖章",{"key":24,"text":175,"correct":22},"申请文件的格式",{"key":27,"text":177,"correct":22},"投标保函",{"key":31,"text":179,"correct":29},"业绩",{"key":34,"text":181,"correct":29},"项目经理资格",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":196,"analysis":37},1102620,"资格预审申请文件包括（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"联合体协议书",{"key":24,"text":189,"correct":29},"申请人须知",{"key":27,"text":191,"correct":22},"近年财务状况",{"key":31,"text":193,"correct":29},"资格审查方法",{"key":34,"text":195,"correct":22},"正在施工的和新承接的项目情况表","ACE",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":211,"analysis":37},1102621,"以下（ ）属于招标资格审查中不能通过审查的情形。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"申请人不具备相应的资质",{"key":24,"text":204,"correct":22},"申请人未按审查委员会的要求提供澄清说明",{"key":27,"text":206,"correct":29},"申请人为项目的设计单位",{"key":31,"text":208,"correct":22},"申请人为本项目的招标代理机构",{"key":34,"text":210,"correct":22},"申请人本年内有骗取中标的违规行为","ABDE",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":81,"analysis":37},1102622,"根据《标准施工招标文件》，关于建设工程施工评标的说法，正确的有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"评标过程可分为初步评审和详细评审两个阶段",{"key":24,"text":219,"correct":22},"初步评审检查投标书是否对招标文件做出实质性响应",{"key":27,"text":221,"correct":29},"评标委员会不得主动提出对投标文件澄清或补正要求",{"key":31,"text":223,"correct":29},"初步评审有不符合评审标准的，在进行详细评审后再处理",{"key":34,"text":225,"correct":22},"招标文件没有说明的评标标准和方法不得作为评标依据",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":239,"analysis":37},1102623,"根据《标准施工招标文件》的规定，施工招标的评标办法包括（ ）。",[230,232,234,236,237],{"key":20,"text":231,"correct":29},"打分法",{"key":24,"text":233,"correct":29},"有限数量法",{"key":27,"text":235,"correct":29},"经评审的最低评标价法",{"key":31,"text":152,"correct":22},{"key":34,"text":238,"correct":22},"综合评估法","DE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":36,"analysis":37},1102624,"根据《标准施工招标文件》的规定，在最低评标价法中，以下（ ）属于响应性评审标准。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"投标报价",{"key":24,"text":247,"correct":22},"工期",{"key":27,"text":249,"correct":29},"财务状况",{"key":31,"text":251,"correct":29},"资质等级",{"key":34,"text":253,"correct":29},"质量管理体系与措施",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":268,"analysis":37},1102625,"《标准设计施工总承包招标文件》中的发包人要求附件清单，包括（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"性能保证表",{"key":24,"text":261,"correct":22},"工作界区图",{"key":27,"text":263,"correct":22},"工程项目管理规定",{"key":31,"text":265,"correct":22},"竣工后试验规定",{"key":34,"text":267,"correct":29},"竣工图纸编制","ABCD",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":280,"analysis":37},1102626,"根据《标准设计施工总承包招标文件》，设计施工总承包项目评标的方法包括（ ）。",[273,275,276,277,278],{"key":20,"text":274,"correct":29},"综合评价法",{"key":24,"text":238,"correct":22},{"key":27,"text":148,"correct":29},{"key":31,"text":150,"correct":22},{"key":34,"text":279,"correct":29},"最低投标价法","BD",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":295,"analysis":37},1102627,"《标准设计施工总承包招标文件》中的价格清单，包括（ ）。",[285,287,289,291,293],{"key":20,"text":286,"correct":22},"勘察设计费清单",{"key":24,"text":288,"correct":29},"管理人员清单",{"key":27,"text":290,"correct":22},"建筑安装工程费清单",{"key":31,"text":292,"correct":22},"技术服务费清单",{"key":34,"text":294,"correct":29},"暂例金额清单","ACD",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":81,"analysis":37},1102628,"材料设备采购的方式包括（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"询价",{"key":24,"text":303,"correct":22},"直接订购",{"key":27,"text":305,"correct":29},"竞争性谈判",{"key":31,"text":307,"correct":29},"无底价竞争",{"key":34,"text":309,"correct":22},"招标投标",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":324,"analysis":37},1102629,"材料设备采购从合同性质上可以分为（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"买卖合同",{"key":24,"text":317,"correct":29},"租赁合同",{"key":27,"text":319,"correct":29},"劳务合同",{"key":31,"text":321,"correct":22},"加工承担合同",{"key":34,"text":323,"correct":29},"融资租赁合同","AD",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},1102630,"材料设备采购招标中，以下说法正确的是（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"材料设备招标的基本单位是标包",{"key":24,"text":332,"correct":29},"标包划分得越细越好",{"key":27,"text":334,"correct":29},"投标人只能投一个标包，不能同时投多个标包",{"key":31,"text":336,"correct":22},"标包划分过大，中小供应厂商无法满足供应",{"key":34,"text":338,"correct":22},"标包划分过小，缺乏对大型供应厂商的吸引力","ADE",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":295,"analysis":37},1102631,"CIF价包含（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"离岸价",{"key":24,"text":347,"correct":29},"出口国内陆运费",{"key":27,"text":349,"correct":22},"海运费",{"key":31,"text":351,"correct":22},"国际运输保险费",{"key":34,"text":353,"correct":29},"进口增值税",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":268,"analysis":37},1102633,"材料采购招标中，材料评标总价包含（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"出厂价",{"key":24,"text":361,"correct":22},"运输费",{"key":27,"text":363,"correct":22},"缺漏项加价",{"key":31,"text":365,"correct":22},"技术、商务偏差加价",{"key":34,"text":367,"correct":29},"安装费",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":382,"analysis":37},1102634,"在材料采购招标中，最低评标价法，是以（ ）作为比较要素，选择总价格最低者中标。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"材料设备的报价",{"key":24,"text":375,"correct":22},"交货期",{"key":27,"text":377,"correct":29},"寿命期内所需的燃料消耗费",{"key":31,"text":379,"correct":22},"付款条件",{"key":34,"text":381,"correct":29},"寿命期内的维修费用","ABD",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":397,"analysis":37},1102635,"以下有关材料设备招标与施工招标的说法，不正确的是（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":29},"材料设备招标与施工招标均可以采用公开招标或邀请招标的方式",{"key":24,"text":390,"correct":29},"材料设备招标与施工招标在招标程序上基本相同",{"key":27,"text":392,"correct":22},"材料设备招标中不得分包，但施工招标可以分包",{"key":31,"text":394,"correct":29},"材料设备招标与施工招标在评标的评审要素有所有不同",{"key":34,"text":396,"correct":22},"材料设备招标与施工招标在评标量化比较方法上基本相同","CE",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":339,"analysis":37},1102636,"在设备招标的综合评估法评标中，以下说法正确的是（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"每个评标委员会成员对评价因素响应值的评价结果称为独立评价值",{"key":24,"text":405,"correct":29},"评价值为各独立评价值之和",{"key":27,"text":407,"correct":29},"最差的评价因素得基准评价值，其余的评价因素将依据其优劣程度获得相应的评价值",{"key":31,"text":409,"correct":22},"若投标人的投标价格超出最高投标限价，其投标将被否决",{"key":34,"text":411,"correct":22},"综合评价最高者为排名第一的中标候选人",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":295,"analysis":37},1102637,"设备采购招标中，一定运行年限内的费用贴现值计算的费用包括估算寿命期内所需的（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"燃料消耗费",{"key":24,"text":419,"correct":29},"设备折旧的费用",{"key":27,"text":421,"correct":22},"备件及维修费用",{"key":31,"text":423,"correct":22},"估算寿命期残值",{"key":34,"text":425,"correct":29},"购置贷款的利息费用",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":67,"analysis":37},1102638,"机电设备采购招标范围不属于伴随服务内容包括（ ）。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"提供合同约定的货物",{"key":24,"text":433,"correct":22},"负责所供货的设备监造",{"key":27,"text":435,"correct":22},"所供货物的运输",{"key":31,"text":437,"correct":29},"所供设备的组装",{"key":34,"text":439,"correct":29},"所供设备的试运行",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":454,"analysis":37},1102639,"下列关于设计施工总承包合同的说法，正确的是（ ）。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"合同责任单一",{"key":24,"text":447,"correct":29},"有利于发包人对承包人的监督和检查",{"key":27,"text":449,"correct":22},"固定工期、固定费用",{"key":31,"text":451,"correct":22},"减少承包人的索赔",{"key":34,"text":453,"correct":22},"可以缩短建设周期","ACDE",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":382,"analysis":37},1102640,"与平行发包或陆续发包方式相比，对发包人而言，建设项目总承包模式的优点是（ ）。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"简化了对设计、招标、实施过程管理的工作内容",{"key":24,"text":462,"correct":22},"采用固定工期、固定费用方式，建设的预期目标容易实现",{"key":27,"text":464,"correct":29},"有利于设计方案优化和提高工程质量标准",{"key":31,"text":466,"correct":22},"减少了设计变更和承包人的索赔",{"key":34,"text":468,"correct":29},"加强了实施阶段发包人对承包人的监督和检查",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":36,"analysis":37},1102641,"设计施工总承包合同模式下，发包人的职责包括（ ）。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"对工程项目的实施负责投资支付",{"key":24,"text":476,"correct":22},"对项目建设有关重大事项的决定",{"key":27,"text":478,"correct":29},"负责试运行的质量缺陷修复责任",{"key":31,"text":480,"correct":29},"负责缺陷责任期的质量缺陷修复",{"key":34,"text":482,"correct":29},"提供图纸及采购设备",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":211,"analysis":37},1102642,"设计施工总承包模式下，发包人要求包括（ ）。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"功能要求",{"key":24,"text":490,"correct":22},"工艺安排或要求",{"key":27,"text":492,"correct":29},"合同价款",{"key":31,"text":494,"correct":22},"技术要求及质量标准",{"key":34,"text":496,"correct":22},"工作界区说明",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":196,"analysis":37},1102643,"根据《标准设计施工总承包合同》，承包人建议书应包括的内容有（ ）。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"工程设计方案",{"key":24,"text":504,"correct":29},"工程施工方案",{"key":27,"text":506,"correct":22},"工程分包方案",{"key":31,"text":508,"correct":29},"工程报价清单",{"key":34,"text":510,"correct":22},"工程设备方案",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":295,"analysis":37},1102644,"根据《标准设计施工总承包招标文件》中的《合同条款及格式》，承包人应投保而发包人不投保的保险有（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"职业责任险",{"key":24,"text":518,"correct":29},"现场人员工伤保险",{"key":27,"text":520,"correct":22},"第三者责任险",{"key":31,"text":522,"correct":22},"设计和工程保险",{"key":34,"text":524,"correct":29},"现场人员意外伤害保险",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":110,"analysis":37},1102645,"下列文件中，属于设计施工总承包合同组成文件的是（ ）。",[529,531,533,535,537],{"key":20,"text":530,"correct":29},"工程量清单",{"key":24,"text":532,"correct":22},"价格清单",{"key":27,"text":534,"correct":29},"分项报价表",{"key":31,"text":536,"correct":29},"商务及技术偏差",{"key":34,"text":538,"correct":22},"发包人要求",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":211,"analysis":37},1102646,"在设计施工总承包模式下，设计施工总承包合同的价格清单包括（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"设计的费用",{"key":24,"text":546,"correct":22},"施工的费用",{"key":27,"text":548,"correct":29},"索赔的费用",{"key":31,"text":550,"correct":22},"试运行阶段的费用",{"key":34,"text":552,"correct":22},"缺陷责任期阶段的费用",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":324,"analysis":37},1102647,"根据《标准设计施工总承包合同》，承包人提交的履约担保的期限可以至（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"颁发工程接收证书",{"key":24,"text":560,"correct":29},"颁发工程缺陷责任证书",{"key":27,"text":562,"correct":29},"颁发结清单",{"key":31,"text":564,"correct":22},"竣工后试验通过",{"key":34,"text":566,"correct":29},"保修期结束",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":211,"analysis":37},1102648,"根据《标准设计施工总承包合同》，承包人在复核“发包人要求”时未发现存在的错误而导致承包人费用增加时，由发包人承担责任的有（ ）。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"引用的原始数据和资料错误",{"key":24,"text":574,"correct":22},"对工程的功能要求错误",{"key":27,"text":576,"correct":29},"对工程进度的要求不合理",{"key":31,"text":578,"correct":22},"试验和检验标准不准确",{"key":34,"text":580,"correct":22},"对项目生产工艺的要求错误",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":595,"analysis":37},1102649,"在设计施工总承包合同模式下，关于缺陷责任期的说法正确的是（ ）。",[585,587,589,591,593],{"key":20,"text":586,"correct":29},"缺陷责任期内，承包人需要对已接收使用的工程负责日常维护工作",{"key":24,"text":588,"correct":22},"在使用过程中，发现接收工程存在新的缺陷，由承包人负责修复",{"key":27,"text":590,"correct":29},"缺陷责任期内，工程缺陷的修复和查验费用由承包人承担",{"key":31,"text":592,"correct":22},"缺陷责任期最长不超过2年",{"key":34,"text":594,"correct":22},"缺陷责任期内，承包人不能在合理时间内修复缺陷，发包人可以委托他人修复","BDE",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":382,"analysis":37},1102650,"某采用标准设计施工总承包合同的工程项目，合同履行出现合同进度计划工作的延误，应由发包人承担延长工期和增加费用并支付合理利润的是（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"发包人要求的设计变更",{"key":24,"text":603,"correct":22},"发包人未按期审查承包人文件",{"key":27,"text":605,"correct":29},"承包人未按已确认修改的设计文件实施",{"key":31,"text":607,"correct":22},"发包人提供的材料延误",{"key":34,"text":609,"correct":29},"异常不利的气候条件",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":624,"analysis":37},1102651,"根据《标准设计施工总承包合同》，可给予承包人费用和工期补偿的有（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":29},"缺陷责任期内非承包人原因缺陷的修复",{"key":24,"text":617,"correct":29},"发包人违约解除合同",{"key":27,"text":619,"correct":22},"隐蔽工程的重新检查证明质量合格",{"key":31,"text":621,"correct":22},"发包人原因的工期延误",{"key":34,"text":623,"correct":22},"基准资料错误","CDE",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":52,"analysis":37},1102652,"根据《标准设计施工总承包合同》，承包人在编制进度款支付分解表时，对拟支付的款项进行分解应考虑的因素有（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":29},"工程效率",{"key":24,"text":632,"correct":22},"费用性质",{"key":27,"text":634,"correct":22},"计划发生时间",{"key":31,"text":636,"correct":22},"相应工作量",{"key":34,"text":638,"correct":29},"人员安排",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":454,"analysis":37},1102653,"设计施工总承包模式下，材料和工程设备费，一般按（ ）阶段按比例进行分解支付。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"订立采购合同",{"key":24,"text":646,"correct":29},"设备制造完成",{"key":27,"text":648,"correct":22},"进场验收合格",{"key":31,"text":650,"correct":22},"安装就位",{"key":34,"text":652,"correct":22},"工程竣工",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":268,"analysis":37},1102654,"设计施工总承包合同，不能索赔工期的情况有（ ）。",[657,659,661,662,663],{"key":20,"text":658,"correct":22},"为他人提供方便",{"key":24,"text":660,"correct":22},"发包人要求提前交货",{"key":27,"text":615,"correct":22},{"key":31,"text":617,"correct":22},{"key":34,"text":664,"correct":29},"不可预见的物质条件",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":624,"analysis":37},1102655,"根据FIDIC施工合同条件，项目通过了试验或颁发了证书后，工程师可以指示进行的工作包括（ ）。",[669,671,673,675,677],{"key":20,"text":670,"correct":29},"进行项目日常管理工作",{"key":24,"text":672,"correct":29},"进行工程结算",{"key":27,"text":674,"correct":22},"对不符合合同规定的任何工作进行返工",{"key":31,"text":676,"correct":22},"将不符合合同规定的永久设备或材料从现场移走并进行更换",{"key":34,"text":678,"correct":22},"实施任何因事故、不可预见事件等导致的为保护工程安全而急需的工作",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":196,"analysis":37},1102656,"根据FIDIC施工合同条件，以下有关工程师的说法，正确的是（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"工程师受业主委托授权为业主开展项目日常管理工作",{"key":24,"text":686,"correct":29},"工程师是合同履行中独立的第三方，应履行合同中赋予的职责",{"key":27,"text":688,"correct":22},"工程师履行职责过程中应保持公平的态度",{"key":31,"text":690,"correct":29},"工程师的人员仅指具备资格的工程师",{"key":34,"text":692,"correct":22},"工程师无权修改合同",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":707,"analysis":37},1102657,"以下有关争端裁决的说法，正确的是（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":29},"DAAB应当由具有适当资格的三人组成",{"key":24,"text":700,"correct":22},"DAAB成员不得与业主、承包商及工程师有利害关系",{"key":27,"text":702,"correct":22},"DAAB由业主、承包商双方联合任命、分摊酬金",{"key":31,"text":704,"correct":29},"DAAB应在收到委托事项后28天内或在双方认可的其他期限内，提出其有理由的决定",{"key":34,"text":706,"correct":29},"DAAB的裁决对双方都有约束力","BC",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":382,"analysis":37},1102658,"根据FIDIC施工合同条件，以下有关不可预见的物质条件论述正确的是（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"包括承包商在工程实施中遇见的外界自然条件及人为的条件",{"key":24,"text":715,"correct":22},"包括承包商在工程实施中遇见的其他障碍和污染物",{"key":27,"text":717,"correct":29},"不包括地下和水文条件",{"key":31,"text":719,"correct":22},"不包括气侯条件",{"key":34,"text":721,"correct":29},"承包商有权提出工期和费用和利润索赔",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":454,"analysis":37},1102659,"在FIDIC设计采购施工EPC合同条件中，以下（ ）属于合同文件的内容。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"合同协议书",{"key":24,"text":729,"correct":29},"中标通知书",{"key":27,"text":731,"correct":22},"业主要求",{"key":31,"text":733,"correct":22},"明细表",{"key":34,"text":735,"correct":22},"投标书",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]