[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,4,50,2250,[13,34,46,58,69,77,89,101,113,125,137,149,161,173,185,197,207,219,228,240,248,260,268,280,292,304,316,328,340,352,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,541,550,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1100210,1,"单选题","施工阶段因承包人违约解除合同，发包人有权要求承包人将其为实施合同而签订的材料和设备的订货合同或任何服务协议转让给发包人，并在解除合同后的（ ）d内，依法办理转让手续。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","7",false,{"key":24,"text":25,"correct":26},"B","14",true,{"key":28,"text":29,"correct":22},"C","21",{"key":31,"text":32,"correct":22},"D","28","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1100212,"承包人应按合同约定的安全工作内容，编制施工安全措施计划报送（ ）审批，按其的指示制定应对灾害的紧急预案。",[38,40,42,44],{"key":20,"text":39,"correct":26},"监理人",{"key":24,"text":41,"correct":22},"发包人",{"key":28,"text":43,"correct":22},"勘察人",{"key":31,"text":45,"correct":22},"设计人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1100214,"关于施工阶段承包人违约处理的表述中，不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"发生承包人不履行或无力履行合同义务的情况时，承包人可通知发包人立即解除合同",{"key":24,"text":53,"correct":22},"对于承包人违反合同规定的情况，监理人应向承包人发出整改通知，要求其在指定的期限内改正",{"key":28,"text":55,"correct":22},"承包人应承担其违约所引起的费用增加和(或)工期延误",{"key":31,"text":57,"correct":22},"监理人发出整改通知28d后，承包人仍不纠正违约行为，发包人可向承包人发出解除合同通知",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1100215,"单位工程验收合格后，由监理人向承包人出具经发包人签认的单位工程验收证书。单位工程的验收成果和结论作为全部工程竣工验收申请报告的附件，移交后的单位工程由（ ）负责照管。",[62,64,65,67],{"key":20,"text":63,"correct":22},"承包人",{"key":24,"text":41,"correct":26},{"key":28,"text":66,"correct":22},"监理单位",{"key":31,"text":68,"correct":22},"发包人与承包人共同",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},1100217,"施工阶段发包人应在监理人收到进度付款申请单后的（ ）d内，将进度应付款支付给承包人。",[73,74,75,76],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":24,"analysis":33},1100219,"承包人未按监理人的要求恢复临时占地，或者场地清理未达到合同约定，发包人有权委托其他人恢复或清理，所发生的费用（ ）。",[81,83,85,87],{"key":20,"text":82,"correct":22},"由发包人自行承担",{"key":24,"text":84,"correct":26},"从拟支付给承包人的款项中扣除",{"key":28,"text":86,"correct":22},"由发包人与原承包人按比例承担",{"key":31,"text":88,"correct":22},"由原承包人与监理人共同承担",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":28,"analysis":33},1100220,"某施工合同履行过程中，承包人因自身原因造成实际工程进度滞后计划进度，按照工程师要求对进度计划进行了修改，并得到工程师的确认。但执行修改后的进度计划，仍不能按期完工。下列关于该拖期的处理方法中，正确的是（ ）。",[93,95,97,99],{"key":20,"text":94,"correct":22},"追究承包人拖期违约责任时，减少合同约定的日拖期赔偿金额",{"key":24,"text":96,"correct":22},"工程师对确认进度计划负责，承担部分拖期完工违约金",{"key":28,"text":98,"correct":26},"承包人按合同约定的拖期违约金的计算办法承担违约责任",{"key":31,"text":100,"correct":22},"按照修改后的进度计划确认新的合同工期，不视为拖期完工",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":24,"analysis":33},1100221,"如果施工索赔事件的影响持续存在，承包商应在该项索赔事件影响结束后的28日内向工程师提交（ ）。",[105,107,109,111],{"key":20,"text":106,"correct":22},"索赔意向通知",{"key":24,"text":108,"correct":26},"索赔通知",{"key":28,"text":110,"correct":22},"施工现场的记录",{"key":31,"text":112,"correct":22},"索赔依据",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},1100223,"项目建设完工后，施工企业已经提交竣工验收报告，但建设单位未按预期组织竣工验收，当事人对建设工程实际竣工日期有争议的，该项目的竣工日期（ ）。",[117,119,121,123],{"key":20,"text":118,"correct":22},"相应顺延",{"key":24,"text":120,"correct":26},"以施工企业提交竣工验收报告之日为准",{"key":28,"text":122,"correct":22},"以合同约定计划竣工日期为准",{"key":31,"text":124,"correct":22},"以实际通过竣工验收之日为准",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":20,"analysis":33},1100224,"根据《标准施工合同》，发包人在收到承包人竣工验收申请报告56天后未进行验收，视为验收合格。实际竣工日期为（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":26},"承包人提交竣工验收申请报告之日",{"key":24,"text":132,"correct":22},"承包人提交竣工验收申请报告后第28天",{"key":28,"text":134,"correct":22},"承包人提交竣工验收申请报告后第56天",{"key":31,"text":136,"correct":22},"工程接收证书颁发日",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},1100225,"下列关于承包人承担工程缺陷修复义务的说法正确的是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"施工期运行中发现的工程设计缺陷不应由承包人负责修复",{"key":24,"text":144,"correct":26},"缺陷责任期内出现的工程设计缺陷应当由承包人负责修复",{"key":28,"text":146,"correct":22},"保修期内出现的工程设计缺陷应当由承包人负责修复",{"key":31,"text":148,"correct":22},"保修期内出现的工程施工缺陷不应由承包人负责修复",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":31,"analysis":33},1100226,"《标准施工合同》中的“合同工期”是指（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"承包人完成工程从开工之日起至实际竣工日经历的期限",{"key":24,"text":156,"correct":22},"合同协议书中写明的施工总日历天数",{"key":28,"text":158,"correct":22},"承包人从监理人发出的开工通知中写明的开工日起，至工程接收证书中写明的实际竣工日止的期限",{"key":31,"text":160,"correct":26},"承包人在投标函内承诺完成工程的时间期限，以及按照合同条款通过变更和索赔程序应给予的顺延工期时间之和",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},1100227,"某工程未经竣工验收，发包人于 4 月 6 日开始擅自使用工程，承包人于 4 月 15 日向监理人送交了竣工验收申请报告，4 月 20 日经验收质量合格，监理人于 4 月 25 日签发工程接收证书。当事人对工程实际竣工日期产生争议，则承包人的竣工日应为（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":26},"4月6日",{"key":24,"text":168,"correct":22},"4月15日",{"key":28,"text":170,"correct":22},"4月20日",{"key":31,"text":172,"correct":22},"4月25日",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":24,"analysis":33},1100228,"当事人对建设工程实际竣工日期有争议时，对竣工日期的确定不正确的是（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"建设工程经竣工验收合格的，以提交竣工验收报告日为竣工日期",{"key":24,"text":180,"correct":26},"建设工程经竣工验收不合格的，以重新竣工验收合格之日为竣工日期",{"key":28,"text":182,"correct":22},"发包人拖延验收的，以提交竣工验收报告日为竣工日期",{"key":31,"text":184,"correct":22},"建设工程未经竣工验收，发包人擅自使用的，以转移占有建设工程之日为竣工日期",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},1100229,"下列关于施工期运行中发现工程设备存在设计缺陷时确定责任方的说法中，正确的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"由承包人进行修复，并承担相应的费用",{"key":24,"text":192,"correct":26},"由承包人进行修复，设计人承担相应的费用",{"key":28,"text":194,"correct":22},"由设计人进行修复，承包人承担相应的费用",{"key":31,"text":196,"correct":22},"由设计人进行修复，并承担相应的费用",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1100230,"某工程竣工验收阶段，承包人于 4 月 6 日向监理人递交了竣工验收申请报告，监理人4 月 8 日收到报告后，经审查于 4 月 20 日认为具备竣工验收条件，并于 4 月 26 日提请发包人竣工验收，但发包人延误竣工验收，则承包人的实际竣工日应为（ ）。",[201,202,204,205],{"key":20,"text":166,"correct":26},{"key":24,"text":203,"correct":22},"4月8日",{"key":28,"text":170,"correct":22},{"key":31,"text":206,"correct":22},"4月26日",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},1100231,"建设工程未经竣工验收，发包人擅自使用，后又组织竣工验收合格的，该工程竣工日期应为（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"提交竣工验收申请报告日",{"key":24,"text":214,"correct":22},"竣工验收合格日",{"key":28,"text":216,"correct":22},"签发工程接收证书日",{"key":31,"text":218,"correct":26},"转移占有建设工程日",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":28,"analysis":33},1100232,"施工工程竣工验收合格后，当事人对实际竣工日期有争议，则承包人的竣工日为（ ）。",[223,224,226,227],{"key":20,"text":212,"correct":22},{"key":24,"text":225,"correct":22},"开始进行竣工验收日",{"key":28,"text":214,"correct":26},{"key":31,"text":216,"correct":22},{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1100233,"施工合同履行中，工程造价管理部门进行价格调整，导致承包人成本增加。根据标准施工合同通用条款的规定，可以给予承包人的补偿包括（ ）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"工期",{"key":24,"text":235,"correct":26},"费用",{"key":28,"text":237,"correct":22},"利润",{"key":31,"text":239,"correct":22},"以上均可以",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},1100234,"施工合同履行中，项目所在地突发地震导致施工不得不暂停。根据标准施工合同通用条款的规定，可以给予承包人的补偿包括（ ）。",[244,245,246,247],{"key":20,"text":233,"correct":26},{"key":24,"text":235,"correct":22},{"key":28,"text":237,"correct":22},{"key":31,"text":239,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1100235,"由于施工过程发现文物、古迹以及其他遗迹、化石、钱币或物品，导致工期延长和成本增加，则承包商有权索赔（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"工期.费用和利润",{"key":24,"text":255,"correct":26},"工期.费用，但不包括利润",{"key":28,"text":257,"correct":22},"工期，但不包括费用",{"key":31,"text":259,"correct":22},"费用，但不包括工期",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1100236,"施工合同履行中，发包人迟延提供由其负责采购的材料、工程设备，承包人向监理人提出索赔要求。根据标准施工合同通用条款的规定，可以给予承包人的补偿包括（ ）。",[264,265,266,267],{"key":20,"text":233,"correct":22},{"key":24,"text":235,"correct":22},{"key":28,"text":237,"correct":22},{"key":31,"text":239,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1100237,"承包人根据合同认为有权得到追加付款和（或）延长工期时，提出索赔要求的方式正确的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"在引起索赔事件发生后28天内，向监理人递交索赔意向通知书",{"key":24,"text":275,"correct":22},"在引起索赔事件发生后28天内，向监理人递交索赔通知书",{"key":28,"text":277,"correct":26},"在引起索赔事件发生后28天内，向监理人递交索赔意向通知书，并且在发出索赔意向通知书后28天内，向监理人递交索赔通知书",{"key":31,"text":279,"correct":22},"在引起索赔事件发生后28天内，既可以向监理人递交索赔意向通知书，也可以向监理人递交索赔通知书",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1100238,"施工合同履行中，关于承包人提出索赔的期限，说法正确的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":26},"承包人接受了竣工付款证书后，不得再对施工阶段.竣工阶段的事项提出索赔要求",{"key":24,"text":287,"correct":22},"承包人接受了最终结清证书后，仍保留对施工合同履行阶段的事项提出索赔的权利",{"key":28,"text":289,"correct":22},"承包人提交的最终结清申请单中，不得对缺陷责任期的事项提出索赔要求",{"key":31,"text":291,"correct":22},"承包人提交的最终结清申请单中，只限于对竣工日期后发生的事项提出索赔要求",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":31,"analysis":33},1100239,"下列关于工程进度款的支付，说法正确的是（）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"监理人应在收到承包人进度付款申请单以及相应的支持性证明文件后28天内完成核查",{"key":24,"text":299,"correct":22},"监理人出具的进度付款证书视为监理人已同意.批准或接受了承包人完成的该部分工作",{"key":28,"text":301,"correct":22},"发包人应在监理人出具进度付款证书后28天内向承包人支付进度应付款",{"key":31,"text":303,"correct":26},"监理人有权扣发承包人未能按照合同要求履行任何工作或义务的相应金额",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1100240,"依照标准施工合同通用条款的规定，由发包人采购材料时，下列表述中正确的是（）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"在到货5天前进行通知承包人",{"key":24,"text":311,"correct":26},"承包人会同监理人共同进行验收",{"key":28,"text":313,"correct":22},"要求提前交货时，承包人可以拒绝",{"key":31,"text":315,"correct":22},"如承包人同意提前交货，由此增加的保管费用由承包人承担",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1100241,"根据建设工程施上合同示范文本的规定，下列关于隐蔽工程检验的说法中，正确的是（）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"工程师与承包人共同检验",{"key":24,"text":323,"correct":22},"工程师无故不参加验收，视为该隐蔽工程通过检验",{"key":28,"text":325,"correct":22},"工程师未在检验记录上签字，承包人7日内不得进行工程隐蔽",{"key":31,"text":327,"correct":26},"验收不合格，承包人应在工程师限定的时间内返工后重新报验",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},1100242,"发生承包人违反合同规定的情况时，处理方法正确的是（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"发包人向承包人发出立即解除合同通知",{"key":24,"text":335,"correct":22},"发包人向承包人发出整改通知",{"key":28,"text":337,"correct":22},"发出整改通知28天后承包人仍不纠正，监理人可发出解除合同通知",{"key":31,"text":339,"correct":26},"违约导致的费用增加和（或）工期延误由承包人承担",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1100243,"监理人在处理索赔时的行为正确的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":26},"认为必要时，要求承包人提供索赔证据的补充资料",{"key":24,"text":347,"correct":22},"认为必要时，与发包人和承包人协商达成索赔处理的一致意见",{"key":28,"text":349,"correct":22},"应当单独确定索赔处理结果",{"key":31,"text":351,"correct":22},"应当在收到索赔意向通知书后的42天内，将索赔处理结果答复承包人",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1100244,"对于具有持续影响的索赔事件，承包人提出索赔要求的方式正确的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"按合理时间间隔陆续递交延续的索赔意向通知，在索赔事件影响结束后的28天内，向监理人递交最终索赔意向通知书",{"key":24,"text":359,"correct":26},"按合理时间间隔陆续递交延续的索赔通知，在索赔事件影响结束后的28天内，向监理人递交最终索赔通知书",{"key":28,"text":361,"correct":22},"按合理时间间隔陆续递交延续的索赔意向通知，在索赔事件影响结束后的28天内，向监理人递交索赔通知书",{"key":31,"text":363,"correct":22},"按合理时间间隔陆续递交延续的索赔通知，在索赔事件影响结束后的28天内，向监理人递交索赔意向通知书，并且在发出索赔意向通知书后28天内，向监理人递交最终索赔通知书",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":28,"analysis":33},1100245,"施工合同履行期间，一方当事人因不可抗力导致其履行合同义务受到阻碍时，下列说法正确的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"应立即通知监理人，监理人应立即通知另一方当事人",{"key":24,"text":371,"correct":22},"如果没有采取有效措施导致损失扩大，应对全部损失承担责任",{"key":28,"text":373,"correct":26},"如果不可抗力的影响持续时间较长，应及时提交中间报告",{"key":31,"text":375,"correct":22},"于不可抗力事件结束后14天内提交最终报告",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1100246,"下列关于不利物质条件的说法正确的是（）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"不利物质条件属于承包人应承担的风险",{"key":24,"text":383,"correct":26},"承包人遇到不利物质条件时，应采取合理措施继续施工，并通知监理人",{"key":28,"text":385,"correct":22},"监理人没有发出指示，承包人因采取合理措施而增加的费用和工期延误，由承包人承担",{"key":31,"text":387,"correct":22},"不利物质条件包括不利气候条件",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1100247,"施工合同履行中，由于设计变更需要确定变更价款，而报价单中没有适用于变更工作的单价，则下列计算变更合同价款的方法正确的是（）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"按照报价单内类似工作的单价计算变更价款",{"key":24,"text":395,"correct":26},"参照报价单内类似工作的单价商定或确定单价",{"key":28,"text":397,"correct":22},"根据成本加利润的原则商定或确定单价",{"key":31,"text":399,"correct":22},"参照设计单位提出的单价商定或确定单价",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},1100248,"对于可能发生的变更，下列关于监理人指示变更的说法正确的是（）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"不需征求承包人意见",{"key":24,"text":407,"correct":22},"承包人收到变更意向书后应当同意实施变更",{"key":28,"text":409,"correct":22},"承包人同意实施变更的，监理人应当发出变更指示",{"key":31,"text":411,"correct":26},"经发包人同意后发出变更指示",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1100249,"对于必须实施的变更，监理人在指示变更时应当（）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"征求承包人意见，经发包人同意后发出变更指示",{"key":24,"text":419,"correct":26},"不需征求承包人意见，经发包人同意后发出变更指示",{"key":28,"text":421,"correct":22},"征求承包人意见，可自行确定发出变更指示",{"key":31,"text":423,"correct":22},"不需征求承包人意见，可自行确定发出变更指示",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},1100250,"下列关于安全事故处理程序说法正确的是（）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"施工过程中发生安全事故时，承包人应立即通知发包人",{"key":24,"text":431,"correct":22},"监理人应立即组织人员和设备进行紧急抢救和抢修，减少人员伤亡和财产损失",{"key":28,"text":433,"correct":26},"需要移动现场物品时，应做出标记和书面记录，妥善保管有关证据",{"key":31,"text":435,"correct":22},"监理人应及时向有关部门如实报告事故发生的情况，以及正在采取的紧急措施",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1100251,"下列对监理人出具的进度付款证书理解正确的是（）。",[440,442,444,446],{"key":20,"text":441,"correct":26},"不视为监理人已同意.批准或接受了承包人完成的该部分工作",{"key":24,"text":443,"correct":22},"监理人和承包人均有权对历次已签发的进度付款证书中的错.漏或重复予以修正",{"key":28,"text":445,"correct":22},"监理人作出的修正应在本次进度付款中支付或扣除",{"key":31,"text":447,"correct":22},"承包人作出的修正经与监理人共同复核同意后在本次进度付款中支付或扣除",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":28,"analysis":33},1100252,"下列（）情形导致承包人原因未在约定的工期内竣工，后续支付时应采用原约定竣工日与实际支付日的两个价格指数中较低的一个作为支付计算的价格指数。",[452,454,456,458],{"key":20,"text":453,"correct":22},"不可抗力",{"key":24,"text":455,"correct":22},"工程量增加",{"key":28,"text":457,"correct":26},"承包商基础施工超挖",{"key":31,"text":459,"correct":22},"设计变更",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},1100253,"根据《标准施工合同》，关于“暂列金额”的说法，正确的是（）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"暂列金额未包括在签约合同价内",{"key":24,"text":467,"correct":22},"暂列金额不可以计日工方式支付",{"key":28,"text":469,"correct":26},"暂列金额可能全部使用或部分使用",{"key":31,"text":471,"correct":22},"暂列金额应按合同规定全部支付给承包人",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1100254,"《标准施工合同》中“暂估价”的含义是（）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"暂估价是指用于支付必然发生但暂时不能确定价格的计日工费用",{"key":24,"text":479,"correct":22},"暂估价是指可能发生的劳务分包费用",{"key":28,"text":481,"correct":22},"暂估价是指用于支付可能发生工程变更需增加的费用",{"key":31,"text":483,"correct":26},"暂估价属于签约合同价的组成部分",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1100255,"下列关于签约合同价和合同价格的说法正确的是（）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"签约合同价指承包人完成全部承包工作后发包人应付给承包人的金额",{"key":24,"text":491,"correct":22},"合同价格指签订合同时合同协议书中写明的合同总金额",{"key":28,"text":493,"correct":22},"签约合同价的数额在签订合同时不能确定",{"key":31,"text":495,"correct":26},"合同价格的数额只有在最终结算时才能确定",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1100256,"履行施工合同时双方达成一致的洽商书面协议的解释应排在（）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"所有合同文件之后",{"key":24,"text":503,"correct":26},"中标通知书之前",{"key":28,"text":505,"correct":22},"投标书之后",{"key":31,"text":507,"correct":22},"图纸之后",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1100257,"某建设项目施工过程中，现场有甲、乙两个分别承包的施工单位同时进行施工。当甲受到乙施工干扰时，甲受到的损失应（）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"向发包人索赔",{"key":24,"text":515,"correct":22},"向乙施工单位索赔",{"key":28,"text":517,"correct":22},"向监理单位索赔",{"key":31,"text":519,"correct":22},"自行承担",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1100258,"施工过程中发生变更，而合同中没有适用或类似工程的价格，应（）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"由监理人提出适当的变更价格，经发包人批准后执行",{"key":24,"text":527,"correct":22},"由承包人提出适当的变更价格，经监理人确认后执行",{"key":28,"text":529,"correct":22},"由发包人提出适当的变更价格，经承包人同意后执行",{"key":31,"text":531,"correct":26},"按照成本加利润原则，由监理人商定",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1100259,"发包人在收到承包人竣工验收申请报告（）天后未进行验收，视为验收合格。实际竣工日期以提交竣工验收申请报告的日期为准。",[536,537,538,539],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":32,"correct":22},{"key":31,"text":540,"correct":26},"56",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1100260,"某施工合同约定钢材由发包商供应，当钢材到货时发包人与监理工程师都没有通知承包人验收，供应商就把钢材卸货于施工现场，在使用前发现钢材数量不足，则损失由（）承担。",[545,546,547,548],{"key":20,"text":63,"correct":22},{"key":24,"text":41,"correct":26},{"key":28,"text":66,"correct":22},{"key":31,"text":549,"correct":22},"钢材供应商",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1100261,"下列有关工程师对索赔作出决定的说法中，正确的是（）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"在授权范围内，工程师与承包人就费用补偿额达不成一致时，有权单方面作出决定",{"key":24,"text":557,"correct":22},"工程师在授权范围内所作出的索赔处理决定，对发包人具有强制性的约束力",{"key":28,"text":559,"correct":22},"工程师的索赔处理决定对承包人是最终的决定",{"key":31,"text":561,"correct":22},"工程师的索赔处理决定不需通知发包人",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},1100262,"《建设工程施工合同（示范文本）》规定，监理人对承包人索赔的处理决定，在法律上的效力（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"是终局的，对发包人具有强制约束力",{"key":24,"text":569,"correct":22},"不是终局的，对发包人具有强制约束力",{"key":28,"text":571,"correct":22},"是终局的，仅对承包人具有强制约束力",{"key":31,"text":573,"correct":26},"不是终局的，对发包人和承包人均没有强制约束力",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},1100263,"施工工程竣工验收通过后，确定承包人的实际竣工日应为（）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"开始进行竣工检验日",{"key":24,"text":581,"correct":22},"发包人组织竣工验收日",{"key":28,"text":583,"correct":22},"验收组通过竣工验收日",{"key":31,"text":585,"correct":26},"承包人提交竣工验收报告日",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1100264,"某工程施工合同约定的工期为18个月，专用条款规定承包人提前竣工或延误竣工均按月计算奖金或延误损害赔偿金。施工至第14个月，因承包人原因导致实际进度滞后于计划进度。承包人修改后的进度计划的竣工时间为第20个月，工程师认可了该进度计划的修改。承包人的实际施工期为19个月。下列关于承包人的工期责任的说法中，正确的是（）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"提前工期1个月给予承包人奖励",{"key":24,"text":593,"correct":26},"延误工期1个月追究承包人拖期违约责任",{"key":28,"text":595,"correct":22},"对承包人既不追究拖期违约责任，也不给予奖励",{"key":31,"text":597,"correct":22},"因工程师对修改进度计划的认可，按延误工期0.5个月追究承包人违约责任",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]