[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":721},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,39,50,2250,[13,38,51,66,81,96,109,123,138,152,167,182,196,211,225,240,253,263,277,292,306,320,335,350,364,376,390,405,419,433,447,461,475,489,504,518,532,546,560,574,585,599,610,624,639,653,666,681,693,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1102321,2,"多选题","下列关于设计施工总承包合同的特点，说法正确的是（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","合同责任单一",true,{"key":24,"text":25,"correct":22},"B","固定工期、固定费用",{"key":27,"text":28,"correct":22},"C","减少设计变更",{"key":30,"text":31,"correct":32},"D","建设周期长",false,{"key":34,"text":35,"correct":32},"E","增加承包人的索赔","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":50,"analysis":37},1102322,"下列关于设计施工总承包合同的说法，正确的是（）。",[42,43,45,46,48],{"key":20,"text":21,"correct":22},{"key":24,"text":44,"correct":32},"有利于发包人对承包人的监督和检查",{"key":27,"text":25,"correct":22},{"key":30,"text":47,"correct":22},"减少承包人的索赔",{"key":34,"text":49,"correct":22},"可以缩短建设周期","ACDE",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":65,"analysis":37},1102323,"设计施工总承包合同模式下，承包人只可以索赔费用的是（）。",[55,57,59,61,63],{"key":20,"text":56,"correct":32},"发包人原因造成质量不合格",{"key":24,"text":58,"correct":32},"不可预见物质条件",{"key":27,"text":60,"correct":22},"发包人要求提前交货",{"key":30,"text":62,"correct":32},"发包人原因承包人无法复工",{"key":34,"text":64,"correct":22},"为他人提供方便","CE",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},1102324,"设计施工总承包合同模式下，无论承包人复核时发现与否，由于下列（）资料错误，导致承包人增加费用和（或）延误的工期，均由发包人承担，并向承包人支付合理利润。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"发包人要求中引用的原始数据和资料",{"key":24,"text":73,"correct":22},"对工程的工艺安排",{"key":27,"text":75,"correct":22},"试验和检验标准",{"key":30,"text":77,"correct":22},"对某工程部分功能的要求",{"key":34,"text":79,"correct":32},"承包人可以核实的数据","ABCD",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},1102325,"下列关于设计施工总承包合同模式下分包工程的说法，错误的是（）。",[85,87,89,91,93],{"key":20,"text":86,"correct":32},"承包人不得将其承包的全部工程肢解后以分包的名义分别转包给第三人",{"key":24,"text":88,"correct":22},"发包人已同意投标文件中说明的分包，分包工作不需要经发包人同意",{"key":27,"text":90,"correct":32},"承包人不得将设计和施工的主体、关键性工作的施工分包给第三人",{"key":30,"text":92,"correct":22},"分包人的资质能力不需要进过监理人审查",{"key":34,"text":94,"correct":32},"发包人同意分包的工作，承包人应向发包人和监理人提交分包合同副本","BD",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":108,"analysis":37},1102326,"下列关于设计施工总承包合同的说法，错误的是（）。",[100,102,104,106,107],{"key":20,"text":101,"correct":22},"设计方案最优",{"key":24,"text":103,"correct":32},"削弱实施阶段发包人对承包人的监督和检查",{"key":27,"text":105,"correct":32},"可以减少设计变更",{"key":30,"text":47,"correct":32},{"key":34,"text":31,"correct":22},"AE",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":95,"analysis":37},1102327,"下列关于设计施工总承包合同模式下分包工程的说法错误的是（）。",[113,115,117,119,121],{"key":20,"text":114,"correct":32},"承包人不得将承包的全部工程转包给第三人",{"key":24,"text":116,"correct":22},"分包工作可以自行分包",{"key":27,"text":118,"correct":32},"要求分包人是具有实施工程设计和施工能力的合格主体",{"key":30,"text":120,"correct":22},"分包人的资质能力不需要经过监理人审查",{"key":34,"text":122,"correct":32},"分包人的资格能力应与其分包工作的标准和规模相适应",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":137,"analysis":37},1102328,"在设计施工总承包合同模式下，关于缺陷责任期的说法正确的是（）。",[127,129,131,133,135],{"key":20,"text":128,"correct":32},"缺陷责任期内，承包人需要对已接收使用的工程负责日常维护工作",{"key":24,"text":130,"correct":22},"在使用过程中，发现接收工程存在新的缺陷，由承包人负责修复",{"key":27,"text":132,"correct":32},"缺陷责任期内，工程缺陷的修复和查验费用由承包人承担",{"key":30,"text":134,"correct":22},"缺陷责任期最长不超过2年",{"key":34,"text":136,"correct":22},"缺陷责任期内，承包人不能在合理时间内修复缺陷，发包人可以委托他人修复","BDE",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":50,"analysis":37},1102329,"设计施工总承包合同规定，发包人要求文件说明的其他要求包括（）。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"对承包人的主要人员资格要求",{"key":24,"text":145,"correct":32},"承包、设备供应商",{"key":27,"text":147,"correct":22},"相关审批、核准和备案手续的办理",{"key":30,"text":149,"correct":22},"对项目业主人员的操作培训",{"key":34,"text":151,"correct":22},"缺陷责任期的服务要求",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":166,"analysis":37},1102330,"关于承包人的设计义务，下列说法正确的有()。",[156,158,160,162,164],{"key":20,"text":157,"correct":22},"设计应满足标准规范的要求",{"key":24,"text":159,"correct":32},"设计应满足消费者的要求",{"key":27,"text":161,"correct":22},"设计应符合合同要求",{"key":30,"text":163,"correct":32},"设计应符合物业管理的需要",{"key":34,"text":165,"correct":22},"设计应符合发包人要求","ACE",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},1102331,"不可预见物质条件涉及的范围与标准施工合同相同，但通用条款中对风险责任承担的规定条款有（），双方应当明确本合同选用哪一条款的规定。",[171,173,175,177,179],{"key":20,"text":172,"correct":22},"风险由承包人承担",{"key":24,"text":174,"correct":32},"风险由工程师承担",{"key":27,"text":176,"correct":22},"风险由发包人承担",{"key":30,"text":178,"correct":32},"风险由监理人承担",{"key":34,"text":180,"correct":32},"风险由分包人承担","AC",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":80,"analysis":37},1102332,"对于发包人负责提供主材料和工程设备的包工部分包料承包方式，应在专用条款内写明材料和工程设备的（ ）等。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"名称",{"key":24,"text":189,"correct":22},"规格",{"key":27,"text":191,"correct":22},"数量",{"key":30,"text":193,"correct":22},"价格",{"key":34,"text":195,"correct":32},"时间",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1102333,"根据《标准设计施工总承包合同》，无论承包人复核是否发现问题，导致承包人费用增加时，均由发包人承担责任的有()。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"引用的原始数据和资料错误",{"key":24,"text":203,"correct":22},"对工程的功能要求错误",{"key":27,"text":205,"correct":32},"对工程进度的要求不合理",{"key":30,"text":207,"correct":22},"试验和检验标准不准确",{"key":34,"text":209,"correct":22},"对项目生产工艺的要求错误","ABDE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":65,"analysis":37},1102334,"设计施工总承包合同，暂列金额在通用条款内列出的可选用的条款有（）。",[215,217,219,221,223],{"key":20,"text":216,"correct":32},"区段工程应达到的要求",{"key":24,"text":218,"correct":32},"约定分部移交区段的名称",{"key":27,"text":220,"correct":22},"计日工费和暂估价均已包括在合同价格内，实施过程中不再另行考虑",{"key":30,"text":222,"correct":32},"发包人不提供施工设备或临时设施",{"key":34,"text":224,"correct":22},"实际发生的费用另行补偿的方式",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},1102335,"我国的标准设计施工总承包合同，分别给出（ ）可供发包人选择的合同模式。",[229,231,233,235,237],{"key":20,"text":230,"correct":32},"固定工期",{"key":24,"text":232,"correct":32},"固定费用",{"key":27,"text":234,"correct":22},"可以补偿",{"key":30,"text":236,"correct":22},"不补偿",{"key":34,"text":238,"correct":32},"固定地点","CD",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":252,"analysis":37},1102336,"下列关于设计施工总承包合同的特点，正确的有()。",[244,246,247,249,251],{"key":20,"text":245,"correct":32},"增加设计变更",{"key":24,"text":49,"correct":22},{"key":27,"text":248,"correct":22},"单一的合同责任",{"key":30,"text":250,"correct":32},"一般采用较高的质量标准",{"key":34,"text":44,"correct":32},"BC",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":80,"analysis":37},1102337,"下列属于工程项目总承包合同优点的是( )。",[257,258,259,260,261],{"key":20,"text":248,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":49,"correct":22},{"key":30,"text":28,"correct":22},{"key":34,"text":262,"correct":32},"设计方案能够达到最优",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":252,"analysis":37},1102338,"在设计施工总承包合同中，关于发包人要求中的错误，以下说法不正确的有()。",[267,269,271,273,275],{"key":20,"text":268,"correct":32},"发包人对错误的修改，按变更对待",{"key":24,"text":270,"correct":22},"承包人复核时未发现发包人要求的错误，发包人必须承担实施过程中的损失",{"key":27,"text":272,"correct":22},"对工程的工艺安排或要求的错误，发包人不需承担责任",{"key":30,"text":274,"correct":32},"承包人复核发包人要求，发现错误的，及时书面通知发包人",{"key":34,"text":276,"correct":32},"对工程或其任何部分的功能要求的错误，发包人要承担责任",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":291,"analysis":37},1102339,"在设计施工总承包合同中，应该由承包人办理保险有( )。",[281,283,285,287,289],{"key":20,"text":282,"correct":22},"建筑工程一切险或安装工程一切险",{"key":24,"text":284,"correct":22},"建设工程设计责任险",{"key":27,"text":286,"correct":22},"进场的材料和工程设备的保险",{"key":30,"text":288,"correct":32},"发包人工伤保险和人身意外伤害保险",{"key":34,"text":290,"correct":22},"承包人工伤保险和人身意外伤害保险","ABCE",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":80,"analysis":37},1102341,"工程总承包合同中对联合体承包人的规定说法正确的是（）",[296,298,300,302,304],{"key":20,"text":297,"correct":22},"总承包合同的承包人可以是独立承包人，也可以是联合体",{"key":24,"text":299,"correct":22},"对于联合体的承包人，由连合同牵头人负责组织和协调联合体各成员全面履行合",{"key":27,"text":301,"correct":22},"未经发包人同意，承包人不得擅自改变联合体的组成和修改联合体协议",{"key":30,"text":303,"correct":22},"合同履行过程中发包人和监理人仅与联合体牵头人或联合体授权的代表联系",{"key":34,"text":305,"correct":32},"联合体的组成和内部分工不是评标中很重要的评审内容",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":80,"analysis":37},1102342,"在设计施工总承包模式下，承包人建议书的内容包括（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"承包人的工程设计方案说明",{"key":24,"text":313,"correct":22},"承包人设备方案的说明",{"key":27,"text":315,"correct":22},"分包方案",{"key":30,"text":317,"correct":22},"对发包人要求中的错误说明",{"key":34,"text":319,"correct":32},"工作界区说明",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":334,"analysis":37},1102343,"根据《标准设计施工总承包合同》，可给予承包人费用和工期补偿的有（ ）。",[324,326,328,330,332],{"key":20,"text":325,"correct":32},"缺陷责任期内非承包人原因缺陷的修复",{"key":24,"text":327,"correct":32},"发包人违约解除合同",{"key":27,"text":329,"correct":22},"隐蔽工程的重新检查证明质量合格",{"key":30,"text":331,"correct":22},"发包人原因的工期延误",{"key":34,"text":333,"correct":22},"基准资料错误","CDE",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":349,"analysis":37},1102344,"某采用标准设计施工总承包合同的工程项目，合同履行出现合同进度计划工作的延误，应由发包人承担延长工期和增加费用并支付合理利润的是（ ）。",[339,341,343,345,347],{"key":20,"text":340,"correct":22},"发包人要求的设计变更",{"key":24,"text":342,"correct":22},"发包人未按期审查承包人文件",{"key":27,"text":344,"correct":32},"承包人未按已确认修改的设计文件实施",{"key":30,"text":346,"correct":22},"发包人提供的材料延误",{"key":34,"text":348,"correct":32},"异常不利的气候条件","ABD",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":252,"analysis":37},1102345,"关于工程款支付管理说法错误的有( )。",[354,356,358,360,362],{"key":20,"text":355,"correct":32},"合同价格包括签约合同价以及按照合同约定进行的调整",{"key":24,"text":357,"correct":22},"设计施工总承包合同对预付款的规定与标准施工合同不同",{"key":27,"text":359,"correct":22},"除专用条款另有约定外，工程进度付款按季支付",{"key":30,"text":361,"correct":32},"合同价格包括承包人依据法律规定或合同约定应支付的规费和税金",{"key":34,"text":363,"correct":32},"价格清单列出的任何数量仅为估算的工程量",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":50,"analysis":37},1102346,"工程总承包合同，为了保证工程项目完满实现发包人预期的建设目标，通用条款中对工程分包做的规定有（ ）。",[368,369,371,372,374],{"key":20,"text":94,"correct":22},{"key":24,"text":370,"correct":32},"分包工作需要征得监理人同意",{"key":27,"text":90,"correct":22},{"key":30,"text":373,"correct":22},"承包人不得将其承包的全部工程转包给第三人，也不得将其承包的全部工程肢解后以分包的名义分别转包给第三人",{"key":34,"text":375,"correct":22},"分包人的资格能力应与其分包工作的标准和规模相适应。其资质能力的材料应经监理人审查",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":291,"analysis":37},1102347,"设计施工总承包合同通用条款规定，承包人进度付款申请单的内容应包括（ ）。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"当期索赔应增加和扣减的金额，以及截至当期期末累计索赔金额",{"key":24,"text":383,"correct":22},"当期根据支付分解表应支付金额，以及截至当期期末累计应支付金额",{"key":27,"text":385,"correct":22},"当期应支付的预付款和扣减的返还预付款金额，以及截至当期期末累计返还预付款金额",{"key":30,"text":387,"correct":32},"当期应增加的质量保证金金额总额，以及截至当期期末累计扣减的质量保证金金额",{"key":34,"text":389,"correct":22},"当期应支付进度款的金额总额，以及截至当期期末累计应支付金额总额和已支付的进度付款金额总额",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":404,"analysis":37},1102348,"（2020年真题）投保建筑工程一切险， 需要在专用合同条款中约定的内容有（ ）",[394,396,398,400,402],{"key":20,"text":395,"correct":32},"投保人",{"key":24,"text":397,"correct":22},"投保内容",{"key":27,"text":399,"correct":22},"保险金额",{"key":30,"text":401,"correct":22},"保险费率",{"key":34,"text":403,"correct":22},"保险期限","BCDE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":80,"analysis":37},1102349,"《客户\u002F咨询工程师(单位)服务协议书》(1998 年第3 版、2006 年第4 版、2017 年第5 版) ，又称\"白皮书\"适用于业主委托工程咨询单位进行项目的（）等咨询服务合同。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"前期投资研究",{"key":24,"text":412,"correct":22},"可行性研究",{"key":27,"text":414,"correct":22},"工程设计",{"key":30,"text":416,"correct":22},"招标评标",{"key":34,"text":418,"correct":32},"运营服务",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":36,"analysis":37},1102350,"FIDIC系列合同，《施工合同条件》中属于业主主要责任和义务的是（）",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"委托任命工程师代表业主进行合同管理",{"key":24,"text":426,"correct":22},"承担大部分或全部设计工作并及时向承包商提供设计图纸",{"key":27,"text":428,"correct":22},"给予承包商现场占有权",{"key":30,"text":430,"correct":32},"按照合同规定及工程师的指示对工程进行设计、施工和竣工井修补缺陷",{"key":34,"text":432,"correct":32},"提交竣工文件二以及操作和维修手册",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":404,"analysis":37},1102351,"关于DAAB的说法正确的是（） A.由业主支付酬金 B.DAAB成员与业主、承包商及工程师没有利害关系",[437,439,441,443,445],{"key":20,"text":438,"correct":32},"如果双方发生争端，任一方可将争端事项提交给DAA",{"key":24,"text":440,"correct":22},"委托其做出决定",{"key":27,"text":442,"correct":22},"DAAB应在收到委托事项后84天内或在双方认可的其他期限内，提出其有理由的决定",{"key":30,"text":444,"correct":22},"业主和承包商双方应在规定的日期前联合任命DAA",{"key":34,"text":446,"correct":22},"DAAB由具有适当资格的一人或三人组成",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":80,"analysis":37},1102356,"根据合同，业主应任命一名\"业主代表\"代表业主进行日常管理工作，业主方应将业主代表的（）通知给承包商。",[451,453,455,457,459],{"key":20,"text":452,"correct":22},"姓名",{"key":24,"text":454,"correct":22},"地址",{"key":27,"text":456,"correct":22},"职责",{"key":30,"text":458,"correct":22},"权力",{"key":34,"text":460,"correct":32},"社保证明",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":404,"analysis":37},1102359,"业主选择EPC 合同多有考虑的内容包括（）",[465,467,469,471,473],{"key":20,"text":466,"correct":32},"业主经验丰富，可以掌控承包商的整个项目质量",{"key":24,"text":468,"correct":22},"期望工程总造价固定、不超过投资限额",{"key":27,"text":470,"correct":22},"项目风险大部分由承包商承担",{"key":30,"text":472,"correct":22},"期望工期确定，使项目能在预定的时间投产运行",{"key":34,"text":474,"correct":22},"严格竣工检验以保证工程完工的质量，使项目发挥预期效益",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":65,"analysis":37},1102361,"在FIDIC设计采购施工EPC合同条件中，业主应对 资料中（ ）的正确性负责。",[479,481,483,485,487],{"key":20,"text":480,"correct":32},"不可预见的困难情况",{"key":24,"text":482,"correct":32},"施工进度计划",{"key":27,"text":484,"correct":22},"对工程的预期目标的说明",{"key":30,"text":486,"correct":32},"放线数据",{"key":34,"text":488,"correct":22},"工程竣工的试验和性能的标准",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":503,"analysis":37},1102362,"工程施工合同(EC C) 的组成内容主要包括（）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"核心条款",{"key":24,"text":496,"correct":32},"成本补偿合同",{"key":27,"text":498,"correct":32},"管理合同",{"key":30,"text":500,"correct":22},"主要选项条款",{"key":34,"text":502,"correct":22},"次要选项条款","ADE",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":80,"analysis":37},1102364,"NEC系列合同条件主要包括（）",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"工程施工合同，用于业主和总承包商之间的主合同，也被用于总包管理的一揽子合同",{"key":24,"text":511,"correct":22},"工程施工分包合同，用于总承包商与分包商之间的合同",{"key":27,"text":513,"correct":22},"专业服务合同，用于业主与项目管理人、监理人、设计人、测量师、律师、社区关系咨询师等之间的合同",{"key":30,"text":515,"correct":22},"裁决人合同，用于业主和承包商共同与裁决人订立的合同，也可用于分包和专业服务合同",{"key":34,"text":517,"correct":32},"争端避免\u002F裁决委员会的任命DAAB",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":36,"analysis":37},1102373,"关于风险CM模式的说法，正确的有（ ）。",[522,524,526,528,530],{"key":20,"text":523,"correct":22},"CM合同属于管理承包合同",{"key":24,"text":525,"correct":22},"CM合同采用成本加酬金的计价方式",{"key":27,"text":527,"correct":22},"CM承包商不赚取总包、分包合同的差价",{"key":30,"text":529,"correct":32},"CM承包商属于专业咨询机构",{"key":34,"text":531,"correct":32},"CM承包商在工程设计阶段参与合同管理",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":80,"analysis":37},1102374,"工程施工合同文本的主要选项条款包括（）。",[536,538,540,542,544],{"key":20,"text":537,"correct":22},"选项A：带有分项工程表的标价合同",{"key":24,"text":539,"correct":22},"选项C：带有分项工程表的目标合同",{"key":27,"text":541,"correct":22},"选项D：带有工程量清单的目标合同",{"key":30,"text":543,"correct":22},"选项E：成本补偿合同",{"key":34,"text":545,"correct":32},"选项G：管理合同",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":404,"analysis":37},1102375,"《设计采购施工（EP C）\u002F交钥匙合同条件》中，承包商的主要责任和义务包括（）",[550,552,554,556,558],{"key":20,"text":551,"correct":32},"发出变更通知",{"key":24,"text":553,"correct":22},"办理工程保险",{"key":27,"text":555,"correct":22},"负责承包商设备",{"key":30,"text":557,"correct":22},"负责现场保安",{"key":34,"text":559,"correct":22},"对业主人员进行工程操作和维修培训",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":137,"analysis":37},1102376,"CM承包商的酬金约定通常可采用的方式有（ ）。",[564,566,568,570,572],{"key":20,"text":565,"correct":32},"按承包合同价的百分比取费",{"key":24,"text":567,"correct":22},"按分包合同价的百分比取费",{"key":27,"text":569,"correct":32},"按承包合同实际发生工程费用的百分比取费",{"key":30,"text":571,"correct":22},"按分包合同实际发生工程费用的百分比取费",{"key":34,"text":573,"correct":22},"固定酬金",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":166,"analysis":37},1102377,"CM承包商的酬金约定通常可采用（ ）的方式。",[578,579,581,582,584],{"key":20,"text":573,"correct":22},{"key":24,"text":580,"correct":32},"按总包合同价的百分比取费",{"key":27,"text":567,"correct":22},{"key":30,"text":583,"correct":32},"按总包合同实际发生工程费用的百分比取费",{"key":34,"text":571,"correct":22},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":598,"analysis":37},1102378,"根据银皮书，承包商有权提出要求延长竣工时间的索赔的情形有（）",[589,590,592,594,596],{"key":20,"text":348,"correct":32},{"key":24,"text":591,"correct":22},"根据合同变更的规定调整竣工时间",{"key":27,"text":593,"correct":22},"根据合同条件承包商有权获得工期顺延",{"key":30,"text":595,"correct":22},"由业主或在现场的业主的其他承包商造成的延误或阻碍",{"key":34,"text":597,"correct":32},"由于流行病或政府行为导致的不可预见的人员或货物的短缺","BCD",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":50,"analysis":37},1102379,"FIDIC系列合同，《施工合同条件》中属于承包商的主要责任和义务的有（）",[603,604,605,606,608],{"key":20,"text":553,"correct":22},{"key":24,"text":424,"correct":32},{"key":27,"text":432,"correct":22},{"key":30,"text":607,"correct":22},"为工程的设计、施工、竣工及修补缺陷提供所需的设备、文件、人员、物资和服务",{"key":34,"text":609,"correct":22},"按照合同规定及工程师的指示对工程进行设计、施工和竣工并修补缺陷",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":80,"analysis":37},1102380,"FIDIC系列合同，《施工合同条件》中关于修补工作说法正确的是（）",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"将不符合合同规定的永久设备或材料从现场移走并进行更换",{"key":24,"text":617,"correct":22},"对不符合合同规定的任何工作进行返工",{"key":27,"text":619,"correct":22},"实施任何因事故导致的为保护工程安全而急需的工作",{"key":30,"text":621,"correct":22},"实施任何因不可预见事件等导致的为保护工程安全而急需的工作",{"key":34,"text":623,"correct":32},"如果是业主方原因等导致的，承包商无权提出索赔。",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":638,"analysis":37},1102381,"风险型CM 承包商的工作内容包括（）",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"施工前阶段的咨询服务",{"key":24,"text":631,"correct":22},"施工阶段的组织管理工作",{"key":27,"text":633,"correct":32},"竣工后运营保修服务",{"key":30,"text":635,"correct":32},"决策阶段投资服务",{"key":34,"text":637,"correct":32},"运营阶段的盈利服务","AB",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":349,"analysis":37},1102382,"在美国AIA合同文本中，关于风险型CM承包商的说法，正确的有()。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"了解施工成本的组成",{"key":24,"text":646,"correct":22},"要有很高的施工管理",{"key":27,"text":648,"correct":32},"工作内容一般只包括施工前阶段的咨询服务",{"key":30,"text":650,"correct":22},"应非常熟悉施工工艺和方法",{"key":34,"text":652,"correct":32},"要有基本的组织协调能力",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":210,"analysis":37},1102383,"《设计采购施工（EP C）\u002F交钥匙合同条件》中，属于业主的主要责任和义务的有（）",[657,658,660,662,664],{"key":20,"text":551,"correct":22},{"key":24,"text":659,"correct":22},"审核承包商文件",{"key":27,"text":661,"correct":32},"建立质量保证体系",{"key":30,"text":663,"correct":22},"为承包商提供协助和配合",{"key":34,"text":665,"correct":22},"准备并负责业主设备",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":680,"analysis":37},1102384,"（2020年真题）FIIDIC《设计采购施工（EP C）\u002F交钥匙工程合同条件》的特征有（ ）。",[670,672,674,676,678],{"key":20,"text":671,"correct":32},"招标文件应提供详细的施工图纸",{"key":24,"text":673,"correct":32},"承包商应负责建成设施的长期商业运营",{"key":27,"text":675,"correct":32},"业主承担全部“不可预见的困难”风险",{"key":30,"text":677,"correct":22},"采用总价合同计价模式",{"key":34,"text":679,"correct":22},"业主委派“业主代表”负责管理合同","DE",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":692,"analysis":37},1102385,"（2020年真题）英国土木工程师学会发布的工程施工合同（EC C）的基本组成内容有（ ）。",[685,686,688,689,690],{"key":20,"text":494,"correct":22},{"key":24,"text":687,"correct":32},"索赔条款",{"key":27,"text":500,"correct":22},{"key":30,"text":502,"correct":22},{"key":34,"text":691,"correct":32},"裁决协议条款","ACD",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":210,"analysis":37},1102387,"关于总价合同的说法，正确的有（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"当施工内容及有关条件未发生变化时，业主付给承包商的价款总额不变",{"key":24,"text":700,"correct":22},"采用总价合同的前提是施工图设计完成，施工任务和范围比较明确",{"key":27,"text":702,"correct":32},"总价合同中业主风险较大、承包人风险较小",{"key":30,"text":704,"correct":22},"总价合同中可约定在发生设计变更时对合同价格进行调整",{"key":34,"text":706,"correct":22},"总价合同在施工进度上能够调动承包人的积极性",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":80,"analysis":37},1102388,"关于单价合同的说法，正确的有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"投标报价单中总价和单价计算结果不一致时，以单价为准调整总价",{"key":24,"text":714,"correct":22},"对于投标书中出现明显的数字计算错误，业主有权利先作修改再评",{"key":27,"text":716,"correct":22},"采用单价合同时，业主和承包人都不担心存在工程量方面的风险",{"key":30,"text":718,"correct":22},"采用变动单价合同时，承包人的风险相对较小",{"key":34,"text":720,"correct":32},"采用固定单价合同时，业主招标准备时间较长",[722,726,729,732,735,738],{"id":723,"name":724,"category":7,"favorite":725},1,"领导干部任职前廉政法规知识测试题",92,{"id":727,"name":728,"category":7,"favorite":723},595,"建筑结构与设备",{"id":730,"name":731,"category":7,"favorite":723},715,"招标采购专业知识与法律法规",{"id":733,"name":734,"category":7,"favorite":723},848,"市政方向-通用基础",{"id":736,"name":737,"category":7,"favorite":8},534,"BIM工程师",{"id":739,"name":737,"category":7,"favorite":8},535]