[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":703},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,34,50,2250,[13,38,53,68,83,98,113,128,142,157,167,182,196,211,225,238,253,268,279,290,300,314,328,339,353,365,380,395,409,423,437,452,467,482,496,510,524,538,552,563,577,590,601,615,629,643,654,668,679,688],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1101995,2,"多选题","按照《中华人民共和国招标投标法》的规定，不允许招标人在定标过程中（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","与投标人就投标价格进行谈判",true,{"key":24,"text":25,"correct":26},"B","将中标结果通知未中标的投标人",false,{"key":28,"text":29,"correct":22},"C","强制中标人接受新的承包条件",{"key":31,"text":32,"correct":22},"D","在评标委员会推荐候选中标人名单外确定中标人",{"key":34,"text":35,"correct":26},"E","授权评标委员会直接确定中标人","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1101996,"根据《招标投标法》，下列工作应当在招标开始前完成的是（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"编制资格预审申请文件",{"key":24,"text":45,"correct":26},"组建评标委员会",{"key":28,"text":47,"correct":26},"完成资格预审评审",{"key":31,"text":49,"correct":22},"选择招标代理机构",{"key":34,"text":51,"correct":22},"招标备案","ADE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1102002,"根据《标准资格预审文件》的规定，以下（ ）通过资格预审。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"投标人为本项目的代建人",{"key":24,"text":60,"correct":22},"投标人为招标人的某地子公司",{"key":28,"text":62,"correct":26},"投标人为本项目的招标代理",{"key":31,"text":64,"correct":26},"本项目招标当年有骗取中标的行为",{"key":34,"text":66,"correct":22},"设计施工总承包项目中，投标人为项目的设计单位","BE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1102003,"以下有关资格审查方法的说法，正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"资格审查办法分为综合评估法和最低投标价法两种",{"key":24,"text":75,"correct":22},"资格审查办法分为合格制和有限数量制两种",{"key":28,"text":77,"correct":22},"如无特殊规定，鼓励招标人采用合格制",{"key":31,"text":79,"correct":22},"合格制比较公平公正，有利于招标人获得最优方案",{"key":34,"text":81,"correct":26},"资格预审文件的获取时间应当不少于3个工作日","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1102004,"在资格审查中，（ ）属于详细审查的因素。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"申请文件的格式",{"key":24,"text":90,"correct":26},"联合体是否具有共同投标协议",{"key":28,"text":92,"correct":26},"申请函的签字盖章",{"key":31,"text":94,"correct":22},"投标人的安全生产许可证是否有效",{"key":34,"text":96,"correct":22},"投标人的资质等级是否满足资格审查公告的要求","DE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1102005,"资格预审阶段，资格审查委员会对施工项目投标人的资格审查分初步审查和详细审查两个阶段，属于详细审查的内容有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"企业资质条件",{"key":24,"text":105,"correct":22},"项目经理资格",{"key":28,"text":107,"correct":22},"企业信誉",{"key":31,"text":109,"correct":26},"施工组织方案",{"key":34,"text":111,"correct":26},"质量管理体系","ABC",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1102010,"关于招投标过程中的投标人资格审查，下列说法正确的是（）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"公开招标对投标人的资格审查通常采用资格预审的方式",{"key":24,"text":120,"correct":26},"资格后审工作应当由资格审查委员于开标后完成",{"key":28,"text":122,"correct":26},"资格预审工作应当由评标委员会于发售招标文件前完成",{"key":31,"text":124,"correct":22},"资格预审和资格后审对投标人资格审查的时间不同",{"key":34,"text":126,"correct":26},"资格预审和资格后审对投标人资格审查的内容和方法也不相同","AD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":36,"analysis":37},1102011,"根据《标准施工招标文件》，关于招标程序的说法正确的有（）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"招标人应向建设行政主管部门办理招标备案",{"key":24,"text":135,"correct":26},"招标公告经向建设行政主管部门备案后公布",{"key":28,"text":137,"correct":22},"在招标公告中公布招标方式",{"key":31,"text":139,"correct":22},"在招标信息发布后进行资格预审",{"key":34,"text":141,"correct":26},"资格预审应当组建资格审查委员会",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1102012,"根据9 部委于2007 年颁发的《标准施工招标资格预审文件》，标准资格预审文件的组成包括（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"资格预审公告",{"key":24,"text":149,"correct":22},"申请人须知",{"key":28,"text":151,"correct":26},"评标办法",{"key":31,"text":153,"correct":22},"资格审查办法",{"key":34,"text":155,"correct":26},"工程量清单","ABD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":67,"analysis":37},1102013,"9 部委联合签发的第56 号令要求，招标人编制的施工招标资格预审文件应不加修改地引用《标准施工招标资格预审文件》中的（）。",[161,162,163,165,166],{"key":20,"text":147,"correct":26},{"key":24,"text":153,"correct":22},{"key":28,"text":164,"correct":26},"投标人须知",{"key":31,"text":151,"correct":26},{"key":34,"text":149,"correct":22},{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},1102014,"关于施工招标资格预审文件中的申请人须知的说法正确的是（）。",[171,173,175,177,179],{"key":20,"text":172,"correct":26},"应不加修改地引用《标准施工招标资格预审文件》中的“申请人须知前附表”",{"key":24,"text":174,"correct":26},"应根据项目的具体特点和实际需要引用《标准施工招标资格预审文件》中的“申请人须知”",{"key":28,"text":176,"correct":22},"申请人须知前附表针对招标工程用于进一步明确正文中的未尽事宜",{"key":31,"text":178,"correct":26},"申请人须知前附表无需考虑招标项目的具体特点和实际需要",{"key":34,"text":180,"correct":22},"申请人须知包括前附表和正文","CE",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":127,"analysis":37},1102018,"关于资格预审申请文件的澄清，下列说法正确的是（）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"资格审查委员会可以要求申请人进行必要的澄清",{"key":24,"text":189,"correct":26},"申请人也可以主动提出澄清，资格审查委员会应当接受",{"key":28,"text":191,"correct":26},"经资格审查委员会同意，申请人的澄清可以改变资格预审申请文件的实质性内容",{"key":31,"text":193,"correct":22},"申请人的澄清内容属于资格预审申请文件的组成部分",{"key":34,"text":195,"correct":26},"申请人的澄清可以采用口头形式",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1102019,"根据《标准施工招标资格预审文件》，不能通过设计施工总承包招标资格预审的单位有（）。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"本项目的代建人",{"key":24,"text":203,"correct":26},"为本项目前期提供设计服务的单位",{"key":28,"text":205,"correct":22},"为本项目提供招标代理服务的单位",{"key":31,"text":207,"correct":26},"法定代表人与建设单位职工存在亲戚关系的单位",{"key":34,"text":209,"correct":22},"在资格预审过程中行贿的单位","ACE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":156,"analysis":37},1102020,"某项目招标的资格预审文件中规定，采用限制合格者数量为六家的方式。关于该招标 项目资格预审合格者的确定，说法正确的是（）。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"如果通过详细评审申请人的数量为五家，则均通过资格预审",{"key":24,"text":218,"correct":22},"如果通过详细评审申请人的数量为六家，则均通过资格预审",{"key":28,"text":220,"correct":26},"如果通过详细评审申请人的数量为七家，则改变预审合格标准，不限制合格者数量",{"key":31,"text":222,"correct":22},"如果通过详细评审申请人的数量为八家，则对各申请人的详细评审各项要素予以评分，选取排名前六的申请人通过资格预审",{"key":34,"text":224,"correct":26},"如果通过详细评审申请人的数量为两家，则只能重新组织资格预审",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":237,"analysis":37},1102024,"根据《标准施工招标文件》，评标委员会发现投标文件中的大写金额与小写金额不一致的，正确的处理方式是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"以大写金额为准",{"key":24,"text":232,"correct":22},"对投标报价进行修正，修正价格须经投标人书面确认",{"key":28,"text":234,"correct":26},"直接按投标人的总报价评审，后果由投标人承担",{"key":31,"text":236,"correct":26},"要求投标人当场重新报价，按新报价评审","AB",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":252,"analysis":37},1102026,"施工招标中，投标文件（）的投标人应确定为中标人。",[242,244,246,248,250],{"key":20,"text":243,"correct":26},"满足招标文件中规定的各项综合评价标准的最低要求",{"key":24,"text":245,"correct":22},"最大限度地满足招标文件中规定的各项综合评价标准",{"key":28,"text":247,"correct":26},"满足招标文件各项要求，并且报价最低",{"key":31,"text":249,"correct":22},"满足招标文件各项要求，并且经评审的价格最低",{"key":34,"text":251,"correct":26},"满足招标文件各项要求，并且经评审的价格最高","BD",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":267,"analysis":37},1102027,"采用最低评标价法对施工项目投标文件进行初步评审时的内容包括()。",[257,259,261,263,265],{"key":20,"text":258,"correct":22},"形式评审",{"key":24,"text":260,"correct":22},"资格评审",{"key":28,"text":262,"correct":22},"响应性评审",{"key":31,"text":264,"correct":22},"施工组织设计",{"key":34,"text":266,"correct":26},"付款条件","ABCD",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":181,"analysis":37},1102028,"采用最低评标价法对施工项目投标文件进行详细评审时的内容包括()。",[272,273,274,275,277],{"key":20,"text":258,"correct":26},{"key":24,"text":264,"correct":26},{"key":28,"text":266,"correct":22},{"key":31,"text":276,"correct":26},"项目管理机构",{"key":34,"text":278,"correct":22},"单价遗漏",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":112,"analysis":37},1102029,"采用综合评估法对施工项目投标文件进行初步评审时的内容包括()。",[283,284,285,286,288],{"key":20,"text":258,"correct":22},{"key":24,"text":260,"correct":22},{"key":28,"text":262,"correct":22},{"key":31,"text":287,"correct":26},"施工组织设计评审",{"key":34,"text":289,"correct":26},"项目管理机构评审",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":52,"analysis":37},1102030,"采用综合评估法对施工项目投标文件进行详细评审时的内容包括()。",[294,296,297,298,299],{"key":20,"text":295,"correct":22},"投标报价",{"key":24,"text":260,"correct":26},{"key":28,"text":262,"correct":26},{"key":31,"text":287,"correct":22},{"key":34,"text":289,"correct":22},{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":52,"analysis":37},1102031,"关于投标文件的澄清或说明，下列说法正确的是（）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"评标委员会可以书面形式要求投标人进行书面澄清或说明",{"key":24,"text":307,"correct":26},"投标人也可以主动提出澄清或说明，评标委员会应予接受",{"key":28,"text":309,"correct":26},"评标委员会对投标人提交的澄清或说明仍有疑问的，按该项不符合标准对待，予以淘汰",{"key":31,"text":311,"correct":22},"投标人不按评标委员会要求澄清或说明的，其投标被否决",{"key":34,"text":313,"correct":22},"投标人提交的澄清或说明属于投标文件的组成部分",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":267,"analysis":37},1102032,"某项目设计施工总承包招标，评标委员会在评审中发现以下情况：投标人甲为联合体，但没有提交联合体协议；投标人乙的投标报价有算术错误，评标委员会进行了修正，但乙不接受修正价格；投标人丙的报价明显低于其他投标报价，但投标人丙不能合理说明；评标委员会对投标人丁提供的资料有疑问要求澄清，而其未予书面说明；投标人戊为本标段前期准备曾提供设计服务。则（）的投标应被否决。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"甲",{"key":24,"text":321,"correct":22},"乙",{"key":28,"text":323,"correct":22},"丙",{"key":31,"text":325,"correct":22},"丁",{"key":34,"text":327,"correct":26},"戊",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":82,"analysis":37},1102036,"下列施工招标中投标人资格预审的内容，属于详细审查内容的是（）。",[332,333,335,337,338],{"key":20,"text":92,"correct":26},{"key":24,"text":334,"correct":22},"资质条件",{"key":28,"text":336,"correct":22},"财务状况",{"key":31,"text":105,"correct":22},{"key":34,"text":276,"correct":26},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":156,"analysis":37},1102037,"施工招标采用最低评标价法，评标委员会推荐中标候选人的做法正确的是（）。",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"推荐满足招标文件各项要求，并且经评审的价格最低的投标人为中标候选人",{"key":24,"text":346,"correct":22},"中标候选人最多不超过3人",{"key":28,"text":348,"correct":26},"按评标价由高到低的顺序推荐中标候选人",{"key":31,"text":350,"correct":22},"评标价相等时，以投标报价低的优先推荐中标候选人",{"key":34,"text":352,"correct":26},"当评标价和投标报价相等时，以施工方案得分高的优先推荐中标候选人",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":210,"analysis":37},1102038,"《标准设计施工总承包招标文件》的组成包括（）。",[357,359,360,361,363],{"key":20,"text":358,"correct":22},"招标公告",{"key":24,"text":149,"correct":26},{"key":28,"text":151,"correct":22},{"key":31,"text":362,"correct":26},"技术标准及要求",{"key":34,"text":364,"correct":22},"发包人要求",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":379,"analysis":37},1102039,"关于《标准设计施工总承包招标文件》适用范围的说法，正确的有（）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"适用于设计施工一体化的总承包项目",{"key":24,"text":372,"correct":26},"适用于依法强制监理的项目",{"key":28,"text":374,"correct":26},"适用于所有招标项目",{"key":31,"text":376,"correct":26},"只适用于公开招标的设计施工总承包项目",{"key":34,"text":378,"correct":22},"适用于依法必须进行招标的设计施工总承包项目","AE",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":394,"analysis":37},1102040,"设计施工总承包招标与施工招标的不同之处在于（）。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"招标文件内容不包括工程量清单.图纸.技术标准及要求等内容",{"key":24,"text":387,"correct":22},"编制的价格清单包含的内容与施工合同的投标报价的内容有所不同",{"key":28,"text":389,"correct":22},"资格审查的审查资料增加了“近年完成的类似设计施工总承包项目情况表”等内容",{"key":31,"text":391,"correct":26},"评标办法只包括综合评估法",{"key":34,"text":393,"correct":22},"投标人须知.评标办法前附表均增加了与设计有关的内容","ABCE",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":210,"analysis":37},1102043,"根据《标准设计施工总承包招标文件》的规定，下列关于工程总承包招标的说法，正确的是（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"工程总承包招标程序与施工招标程序基本相同",{"key":24,"text":402,"correct":26},"工程总承包招标文件包括图纸和工程量清单",{"key":28,"text":404,"correct":22},"工程总承包招标编制的价格清单包括有关勘察设计费等内容",{"key":31,"text":406,"correct":26},"工程总承包招标的评标办法仅包括综合评价法",{"key":34,"text":408,"correct":22},"施工招标的评标办法包括综合评价法和经评审的最低投标价法",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":267,"analysis":37},1102044,"根据《标准设计施工总承包招标文件》规定，与施工招标文件相比较，设计施工总承包招标文件的投标人须知中增加了（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"质量标准",{"key":24,"text":416,"correct":22},"项目经理应当具备工程设计类或者工程施工类注册执业资格",{"key":28,"text":418,"correct":22},"设计负责人应当具备工程设计类注册执业资格的要求",{"key":31,"text":420,"correct":22},"设计成果补偿",{"key":34,"text":422,"correct":26},"竣工后试验规定",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":52,"analysis":37},1102045,"下列关于对中标通知书的说法，正确的是（）。",[427,429,431,433,435],{"key":20,"text":428,"correct":22},"中标通知书由招标人发出",{"key":24,"text":430,"correct":26},"中标通知书只对中标人具有法律效力",{"key":28,"text":432,"correct":26},"只有招标人才能确定中标人",{"key":31,"text":434,"correct":22},"中标通知书对招标人具有法律效力",{"key":34,"text":436,"correct":22},"中标通知书发出之日起30日内签订合同",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},1102046,"招标项目开标后发现投标文件存在下列问题，可以继续评标的情况包括（）。",[441,443,445,447,449],{"key":20,"text":442,"correct":26},"没有按照招标文件要求提供投标担保",{"key":24,"text":444,"correct":22},"报价金额的大小写不一致",{"key":28,"text":446,"correct":26},"货物检验标准低于招标文件要求",{"key":31,"text":448,"correct":22},"货物包装方式高于招标文件要求",{"key":34,"text":450,"correct":22},"总价金额和单价与工程量乘积之和的金额不一致","BDE",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":466,"analysis":37},1102048,"下列关于招标流程的相关说法正确的是（）。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"现场踏勘是由招标人组织的",{"key":24,"text":459,"correct":22},"招标人具备自行招标能力可以自行进行招标事宜",{"key":28,"text":461,"correct":26},"评标委员会成员人数必须为7人以上单数",{"key":31,"text":463,"correct":26},"投标预备会是招标的必经程序",{"key":34,"text":465,"correct":22},"对于投标人提问的问题，招标人应以书面形式通知所有购买招标文件的投标人","ABE",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":481,"analysis":37},1102049,"按照《招标投标法》的要求，招标人自行办理招标或委托招标代理机构招标的事宜，说法正确的包括（）。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"发包人拥有与招标项目规模和复杂程度相适应的技术、经济等方面的专业人员，具有编制招标文件和组织评标能力时，可以自行组织招标",{"key":24,"text":474,"correct":26},"招标代理机构由建设行政主管部门指定",{"key":28,"text":476,"correct":22},"选择招标代理机构时，既要审查是否具有相应资质，还应考察其是否主持过与本次招标工程规模和复杂程度相应的经历，以便判断代理招标的能力",{"key":31,"text":478,"correct":26},"招标代理机构如果时间紧急，可不需要考察其是否主持过与本次招标工程规模和复杂程度相应的经历",{"key":34,"text":480,"correct":26},"发包人必须独立完成组织招标工作","AC",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":237,"analysis":37},1102050,"关于评标委员会组成的说法，正确的是（）。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"招标人代表3人，经济、技术等方面专家6人",{"key":24,"text":489,"correct":22},"招标人代表2人，经济、技术等方面专家5人",{"key":28,"text":491,"correct":26},"招标人代表2人，经济、技术等方面专家4人",{"key":31,"text":493,"correct":26},"招标人代表1人，经济、技术等方面专家3人",{"key":34,"text":495,"correct":26},"招标人代表1人，经济、技术等方面专家5人",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":237,"analysis":37},1102051,"招标方式中，邀请招标与公开招标比较，其缺点主要有（）等。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"选择面窄，排斥了某些有竞争实力的潜在投标人",{"key":24,"text":503,"correct":22},"竞争的激烈程度相对较差",{"key":28,"text":505,"correct":26},"招标时间长",{"key":31,"text":507,"correct":26},"招标费用高",{"key":34,"text":509,"correct":26},"评标工作量较大",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":394,"analysis":37},1102052,"招标人向建设行政主管部门申请办理招标手续时，所提供的招标备案文件应说明的情况有（）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"计划工期",{"key":24,"text":517,"correct":22},"对投标人的资质要求",{"key":28,"text":519,"correct":22},"招标工作范围",{"key":31,"text":521,"correct":26},"资格预审条件",{"key":34,"text":523,"correct":22},"招标方式",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":379,"analysis":37},1102054,"对招标项目的投标人在研究招标文件和现场考察后提出的质疑，招标人的正确处理方式有（）。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"以书面形式将质疑的解答通知所有投标人",{"key":24,"text":531,"correct":26},"以口头形式将质疑的解答通知所有投标人",{"key":28,"text":533,"correct":26},"仅对提出质疑人给予书面形式的解答",{"key":31,"text":535,"correct":26},"解答应说明问题的来源",{"key":34,"text":537,"correct":22},"在标前会上给予解答并记入会议纪要",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":379,"analysis":37},1102055,"按照《招标投标法》，关于招标方式的说法，正确的有（）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"公开招标的投标人不受地域和行业限制",{"key":24,"text":545,"correct":26},"议标是招标方式的一种",{"key":28,"text":547,"correct":26},"竞争性谈判是招标方式的一种",{"key":31,"text":549,"correct":26},"邀请招标不能限制投标人的数量",{"key":34,"text":551,"correct":22},"公开招标意味着招标时间长、费用高",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":267,"analysis":37},1102056,"下列选项中，属于标准资格预审文件的有()。",[556,557,558,560,561],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":28,"text":559,"correct":22},"资格审查方法",{"key":31,"text":153,"correct":22},{"key":34,"text":562,"correct":26},"联合体协议书",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":112,"analysis":37},1102057,"下列关于各评标办法的适用范围描述，正确的有( )。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"最低评标价法适用于没有特殊专业施工技术要求的工程",{"key":24,"text":570,"correct":22},"最低评标价法适用于采用通用技术即可保证质量完成的招标工程项目",{"key":28,"text":572,"correct":22},"综合评估法适用于大型复杂工程，有特殊专业施工技术和经验要求的评标",{"key":31,"text":574,"correct":26},"最低评标价法适用于大型复杂工程，有特殊专业施工技术和经验要求的评标",{"key":34,"text":576,"correct":26},"综合评估法适用于采用通用技术即可保证质量完成的招标工程项目",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":466,"analysis":37},1102058,"下列选项中，属于详细审查主要内容的有( )。",[581,583,584,586,588],{"key":20,"text":582,"correct":22},"资质等级",{"key":24,"text":336,"correct":22},{"key":28,"text":585,"correct":26},"提供资料的有效性",{"key":31,"text":587,"correct":26},"提供资料的完整性",{"key":34,"text":589,"correct":22},"类似项目的业绩",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":267,"analysis":37},1102059,"下列内容中，属于经评审的最低投标价法的初步评审的有( )。",[594,595,596,597,599],{"key":20,"text":258,"correct":22},{"key":24,"text":260,"correct":22},{"key":28,"text":262,"correct":22},{"key":31,"text":598,"correct":22},"施工组织设计和项目管理机构评审",{"key":34,"text":600,"correct":26},"量化比较",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":237,"analysis":37},1102060,"下列方法中，可用来确定资格预审合格者数量的有( )。",[605,607,609,611,613],{"key":20,"text":606,"correct":22},"合格制",{"key":24,"text":608,"correct":22},"有限数量制",{"key":28,"text":610,"correct":26},"数量制",{"key":31,"text":612,"correct":26},"符合制",{"key":34,"text":614,"correct":26},"评审制",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":210,"analysis":37},1102061,"下列属于标准施工招标文件中应不加修改引用的是()。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"《标准施工招标文件》投标人须知",{"key":24,"text":622,"correct":26},"《标准施工招标文件》投标人须知前附表",{"key":28,"text":624,"correct":22},"《标准施工招标文件》评标办法",{"key":31,"text":626,"correct":26},"《标准施工招标文件》评标办法前附表",{"key":34,"text":628,"correct":22},"《标准施工招标文件》通用合同条款",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":451,"analysis":37},1102062,"招标人自行组织招标应具备的条件和能力有( )。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"有与招标工程规模和复杂程度相应的经历",{"key":24,"text":636,"correct":22},"有与招标工程规模和复杂程度相适应的专业人员",{"key":28,"text":638,"correct":26},"有办理招标手续的人员及能力",{"key":31,"text":640,"correct":22},"有编制招标文件的能力",{"key":34,"text":642,"correct":22},"有组织评标的能力",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":481,"analysis":37},1102063,"在9部委联合颁发的56号令中明确要求，行业标准的施工招标资格预审文件应不加修改地引用《标准施工招标资格预审文件》中的()。",[647,648,650,651,653],{"key":20,"text":149,"correct":22},{"key":24,"text":649,"correct":26},"申请人须知前附表",{"key":28,"text":153,"correct":22},{"key":31,"text":652,"correct":26},"资格审查办法前附表",{"key":34,"text":147,"correct":26},{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":466,"analysis":37},1102065,"根据《标准施工招标文件》，关于建设工程施工评标的说法，正确的有( )。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"评标过程可分为初步评审和详细评审两个阶段",{"key":24,"text":661,"correct":22},"初步评审检查投标书是否对招标文件做出实质性响应",{"key":28,"text":663,"correct":26},"评标委员会不得主动提出对投标文件澄清或补正要求",{"key":31,"text":665,"correct":26},"初步评审有不符合评审标准的，在进行详细评审后再处理",{"key":34,"text":667,"correct":22},"招标文件没有说明的评标标准和方法不得作为评标依据",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":210,"analysis":37},1102066,"下列选项中，属于资格预审申请文件的有()。",[672,673,674,676,677],{"key":20,"text":562,"correct":22},{"key":24,"text":149,"correct":26},{"key":28,"text":675,"correct":22},"近年财务状况",{"key":31,"text":559,"correct":26},{"key":34,"text":678,"correct":22},"正在施工的和新承接的项目情况表",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":156,"analysis":37},1102067,"下列选项属于标准资格预审文件主要内容的有()。",[683,684,685,686,687],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":28,"text":649,"correct":26},{"key":31,"text":153,"correct":22},{"key":34,"text":358,"correct":26},{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":702,"analysis":37},1102068,"下列关于标准施工招标文件分卷组成的说法，错误的有( )。",[692,694,696,698,700],{"key":20,"text":693,"correct":26},"招标公告属于第一卷的标准文件",{"key":24,"text":695,"correct":22},"第二卷为工程量清单",{"key":28,"text":697,"correct":22},"第三卷为图纸",{"key":31,"text":699,"correct":26},"第四卷为投标文件格式",{"key":34,"text":701,"correct":26},"技术标准和要求属于第三卷","BC",[704,708,711,714,717,720],{"id":705,"name":706,"category":7,"favorite":707},1,"领导干部任职前廉政法规知识测试题",92,{"id":709,"name":710,"category":7,"favorite":705},595,"建筑结构与设备",{"id":712,"name":713,"category":7,"favorite":705},715,"招标采购专业知识与法律法规",{"id":715,"name":716,"category":7,"favorite":705},848,"市政方向-通用基础",{"id":718,"name":719,"category":7,"favorite":8},534,"BIM工程师",{"id":721,"name":719,"category":7,"favorite":8},535]