[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,33,50,2250,[13,38,53,68,83,98,112,127,141,156,171,186,201,216,230,245,259,268,282,297,312,325,340,355,369,383,397,411,425,440,455,469,483,498,512,524,539,553,567,580,594,608,617,631,645,660,672,686,698,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1101910,2,"多选题","（2020年真题）根据《标准施工招标文件》中的通用合同条款，承包人按合同约定应履行的职责有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","按工作内容和施工进度要求，编制施工组织设计和施工进度计划",true,{"key":24,"text":25,"correct":26},"B","负责办理施工场地临时道路占用的许可手续",false,{"key":28,"text":29,"correct":22},"C","测设施工控制网并报监理人审批",{"key":31,"text":32,"correct":22},"D","负责在施工现场建立完善的工程质量管理体系",{"key":34,"text":35,"correct":22},"E","对深基坑工程和地下暗挖工程编制专项施工方案","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1101911,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，施工中因（ ）引起的暂停施工，承包人有权要求延长工期、增加费用和支付合理利润。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"发包人负责提供的设备未按时到位",{"key":24,"text":45,"correct":22},"发包人委托的设计人提供的设计文件错误",{"key":28,"text":47,"correct":26},"发生不可抗力",{"key":31,"text":49,"correct":26},"承包人原因进行施工方案调整",{"key":34,"text":51,"correct":26},"承包人施工机械故障","AB",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1101912,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，发包人仅限于给予承包人费用补偿的情形有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"法规变化引起的价格调整",{"key":24,"text":60,"correct":26},"监理人的指示错误",{"key":28,"text":62,"correct":22},"因不可抗力停工期间的工程照管",{"key":31,"text":64,"correct":26},"发包人提供图纸延误",{"key":34,"text":66,"correct":26},"重新检验隐蔽工程质量","AC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1101913,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，承包人施工项目部人员管理的主要措施有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"在施工现场设立专门的质量检验机构",{"key":24,"text":75,"correct":22},"施工人员的质量教育和技术培训",{"key":28,"text":77,"correct":22},"严格执行规范和操作规程",{"key":31,"text":79,"correct":26},"现场施工人员的职称和职业资格审查",{"key":34,"text":81,"correct":22},"定期考核施工人员的劳动技能","ABCE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1101914,"（2020年真题）根据《标准设计施工总承包招标文件》中的通用合同条款，关于竣工验收的说法，正确的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"承包人应提前14天将申请竣工试验通知送达发包人",{"key":24,"text":90,"correct":22},"承包人应在申请竣工试验前提交运行操作和维修手册",{"key":28,"text":92,"correct":26},"承包人应在竣工试验通过时将工程移交给发包人组织试运行",{"key":31,"text":94,"correct":22},"工程经验收合格，监理人经发包人同意后签发工程接收证书;",{"key":34,"text":96,"correct":22},"工程接收证书上注明的实际竣工日期为提交竣工验收申请报告的日期","BDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":111,"analysis":37},1101915,"（2020年真题）根据《标准设计施工总承包招标文件》中的通用合同条款，承包人有权提出工期、费用和利润三项索赔的情形（ ）",[102,104,106,107,109],{"key":20,"text":103,"correct":26},"不可预见的物质条件",{"key":24,"text":105,"correct":22},"发包人原因导致工期延误",{"key":28,"text":60,"correct":22},{"key":31,"text":108,"correct":22},"发包人提供的材料延误",{"key":34,"text":110,"correct":26},"异常恶劣的气候条件","BCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1101917,"按照合同订立方式的不同，建设工程材料设备采购合同可以分为（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"材料采购合同",{"key":24,"text":119,"correct":26},"设备采购合同",{"key":28,"text":121,"correct":26},"即时买卖合同",{"key":31,"text":123,"correct":22},"竞争买卖合同",{"key":34,"text":125,"correct":22},"自由买卖合同","DE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":97,"analysis":37},1101924,"下列关于建设工程材料设备采购合同的特点，说法正确的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"建设工程材料设备采购合同的买受人只能是承包人",{"key":24,"text":134,"correct":22},"采购合同的出卖人可以是生产厂家",{"key":28,"text":136,"correct":26},"建设工程材料设备采购合同的供货条件差异不大",{"key":31,"text":138,"correct":22},"建设工程材料设备采购合同的履行与施工进度密切相关",{"key":34,"text":140,"correct":22},"建筑材料采购合同的条款一般限于物资交货阶段",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1101930,"大型设备的采购，除了交货阶段的工作外，往往还需包括（）和保修等方面的条款约定。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"设备生产制造阶段",{"key":24,"text":148,"correct":22},"设备安装调试阶段",{"key":28,"text":150,"correct":22},"设备试运行阶段",{"key":31,"text":152,"correct":22},"设备性能达标检验",{"key":34,"text":154,"correct":26},"设备组装检验阶段","ABCD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1101931,"建设工程材料设备采购合同中，属于材料采购范围的有()。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"发电机",{"key":24,"text":163,"correct":26},"发动机",{"key":28,"text":165,"correct":22},"水管",{"key":31,"text":167,"correct":22},"电线",{"key":34,"text":169,"correct":26},"塔吊","CD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1101932,"关于建设工程材料设备采购合同特点的说法，正确的有( )。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"采购人可以是发包人，也可以是承包人",{"key":24,"text":178,"correct":26},"可以不转移材料设备的所有权",{"key":28,"text":180,"correct":26},"供货人只能是生产厂家",{"key":31,"text":182,"correct":22},"不同合同内容繁简程度差异较大",{"key":34,"text":184,"correct":22},"合同履行与施工进度密切相关","ADE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},1101933,"建筑材料采购合同的条款一般限于物资交货阶段，主要涉及（）。",[190,192,194,196,198],{"key":20,"text":191,"correct":26},"设备安装调试",{"key":24,"text":193,"correct":22},"交接程序",{"key":28,"text":195,"correct":22},"检验方式",{"key":31,"text":197,"correct":22},"质量要求",{"key":34,"text":199,"correct":22},"合同价款的支付","BCDE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},1101935,"关于建设工程材料设备采购合同当事人的表述中，正确的有（ ）。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"永久工程的大型设备一般情况下由发包人采购",{"key":24,"text":208,"correct":22},"施工中使用的建筑材料采购责任，按照施工合同专用条款的约定执行",{"key":28,"text":210,"correct":26},"采购合同的出卖人即供货人，只能是生产厂家",{"key":31,"text":212,"correct":26},"采购合同的出卖人即供货人，只能是从事物资流转业务的供应商",{"key":34,"text":214,"correct":22},"建设工程材料设备采购合同的买受人即采购人，可以是发包人，也可能是承包人","ABE",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":200,"analysis":37},1101936,"建设工程材料设备采购合同属于买卖合同，具有买卖合同的一般特点，该特点体现在（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":26},"买卖合同是实践合同",{"key":24,"text":223,"correct":22},"买卖合同是双务、有偿合同",{"key":28,"text":225,"correct":22},"买卖合同的买受人取得财产所有权，必须支付相应的价款",{"key":31,"text":227,"correct":22},"出卖人转移财产所有权。必须以买受人支付价款为对价",{"key":34,"text":229,"correct":22},"出卖人与买受人订立买卖合同，是以转移财产所有权为目的",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1101937,"材料采购合同，合同材料交付后，买方应在专用合同条款约定的期限内安排对合同材料的规格、质量等进行检验，检验按照专用合同条款约定的可选择的方式包括（）",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"由买方对合同材料进行检验",{"key":24,"text":237,"correct":22},"由专用合同条款约定的拥有资质的第三方检验机构对合同材料进行检验",{"key":28,"text":239,"correct":22},"专用合同条款约定的其他方式",{"key":31,"text":241,"correct":26},"由卖方对合同材料进行检验",{"key":34,"text":243,"correct":26},"卖方资质齐全可不进行检验","ABC",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":82,"analysis":37},1101938,"(2015年真题)建设工程材料设备采用非即时买卖合同的种类有（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"货样买卖",{"key":24,"text":252,"correct":22},"分期交付买卖",{"key":28,"text":254,"correct":22},"试用买卖",{"key":31,"text":256,"correct":26},"异地交付买卖",{"key":34,"text":258,"correct":22},"分期付款买卖",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":185,"analysis":37},1101939,"（2014年真题）关于建设工程材料设备采购合同特点的说法，正确的有（ ）。",[263,264,265,266,267],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":26},{"key":28,"text":180,"correct":26},{"key":31,"text":182,"correct":22},{"key":34,"text":184,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":215,"analysis":37},1101940,"（2014年真题）某单位采用试用买卖方式签订了设备采购合同，关于采购方式及合同说法正确的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"属于非即时买卖合同",{"key":24,"text":275,"correct":22},"试用期内可以拒绝购买",{"key":28,"text":277,"correct":26},"试用的前提是支付价款或提供担保",{"key":31,"text":279,"correct":26},"试用期只能由法律规定，当事人不能约定",{"key":34,"text":281,"correct":22},"试用期届满，采购人对是否购买未做表示的视为购买",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":296,"analysis":37},1101941,"（2020年真题）根据《标准材料采购招标文件》中的通用合同条款，材料采购支付的合同价款有（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"预付款",{"key":24,"text":289,"correct":26},"交货款",{"key":28,"text":291,"correct":22},"进度款",{"key":31,"text":293,"correct":26},"验收款",{"key":34,"text":295,"correct":22},"结清款","ACE",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},1101942,"（2020年真题）材料采购合同履行过程中，卖方按照合同约定的进度交付合同约定的材料并提供相关服务后，买方在支付进度款前需收到卖方提交的单据有（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"卖方出具的交货清单正本一份",{"key":24,"text":304,"correct":26},"买方出具的收货清单正本一份",{"key":28,"text":306,"correct":22},"制造商出具的出厂质量合格证正本一份",{"key":31,"text":308,"correct":22},"合格价格100%金额的增值税发票正本一份",{"key":34,"text":310,"correct":26},"保险公司出具的履约保函正本一份","ACD",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":155,"analysis":37},1101943,"（2020年真题）根据《标准设备采购招标文件》中的通用合同条款，卖方交付合同约定的全部设备后， 买方在支付合同价款前需收到卖方提交的单据有（ ）。",[316,317,319,321,323],{"key":20,"text":302,"correct":22},{"key":24,"text":318,"correct":22},"买方签署的收货清单正本一份",{"key":28,"text":320,"correct":22},"制造商出具的设备出厂质量合格证正本一份",{"key":31,"text":322,"correct":22},"合同价格?100%金额的增值税发票正本一份",{"key":34,"text":324,"correct":26},"监造人员出具的合同设备监造确认书一份",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},1101947,"关于《简明标准施工招标文件》的适用范围包括（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":26},"必须是非政府投资项目",{"key":24,"text":332,"correct":26},"必须是依法必须进行招标的工程建设项目",{"key":28,"text":334,"correct":22},"工期不超过12个月，技术相对简单",{"key":31,"text":336,"correct":26},"设计和施工是由同一承包人承担的小型项目",{"key":34,"text":338,"correct":22},"设计和施工不是由同一承包人承担的小型项目","CE",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":354,"analysis":37},1101948,"根据《标准施工招标文件》，应当进行重新招标的情形有（ ）",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"投标截止时间后招标人不同意开标的",{"key":24,"text":347,"correct":22},"投标截止时间止，投标人少于3家的",{"key":28,"text":349,"correct":26},"投标人投诉中标人的",{"key":31,"text":351,"correct":22},"经评标委员会评审后否决所有投标的",{"key":34,"text":353,"correct":26},"招标人不接受评标评审结果的","BD",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":311,"analysis":37},1101949,"采用两阶段招标的项目，关于第二阶段的说法，正确的有（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"第二阶段开标会上只宣读修改后的技术标",{"key":24,"text":362,"correct":26},"第二阶段评标不再召开投标书问题澄清会",{"key":28,"text":364,"correct":22},"未按第一阶段提出的要求进行修改的标书将被淘汰",{"key":31,"text":366,"correct":22},"第二阶段评标的重点是各投标人的投标报价",{"key":34,"text":368,"correct":26},"第二阶段要对各投标人的投标报价进行评审",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":111,"analysis":37},1101950,"关于招标投标过程中标底的说法，正确的有（ ）",[373,375,377,379,381],{"key":20,"text":374,"correct":26},"招标项目均应编制标底",{"key":24,"text":376,"correct":22},"一个招标项目只能有一个标底",{"key":28,"text":378,"correct":22},"招标项目设有标底的，应当在开标时公布",{"key":31,"text":380,"correct":22},"标底只能作为评标的参考",{"key":34,"text":382,"correct":26},"可以根据标底确定最低投标限价",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":97,"analysis":37},1101951,"根据《招标投标法实施条例》，投标保证金不予退还的情形有（ ）",[387,389,391,393,395],{"key":20,"text":388,"correct":26},"投标人撤回已提交的投标文件",{"key":24,"text":390,"correct":22},"投标人撤销已提交的投标文件",{"key":28,"text":392,"correct":26},"投标人拒绝延长投标有效期",{"key":31,"text":394,"correct":22},"中标人拒绝订立合同",{"key":34,"text":396,"correct":22},"中标人拒绝提交履约保证金",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":244,"analysis":37},1101952,"建设工程施工招标投标过程中，招标人有权没收投标人投标保证金的情形包括（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"投标人在投标有效期内撤销其投标文件的",{"key":24,"text":404,"correct":22},"投标人在投标有效期内修改其投标文件的",{"key":28,"text":406,"correct":22},"中标人在收到中标通知书后，无正当理由拒签合同协议书的",{"key":31,"text":408,"correct":26},"部分投标人对评标结果有异议的",{"key":34,"text":410,"correct":26},"投标人在投标有效期内，未按招标文件规定提交履约担保的",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":215,"analysis":37},1101959,"关于确定中标人的说法中，正确的有（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"如果招标人授权评标委员会确定中标人，评标委员会可将排序第一的投标人定为中标人，提交发包人请其与中标人签订施工合同",{"key":24,"text":418,"correct":22},"招标人依据评标报告的推荐投标人名单排序第一的候选中标人进行签约前的谈判，主要针对评标报告中提出的签订合同前要处理的事宜进行协商",{"key":28,"text":420,"correct":26},"评标委员会是招标人聘请的咨询专家团，仅是按照预定的评审要素和方法对各投标书进行比较，因此大多情况下由评标委员会专家确定中标人",{"key":31,"text":422,"correct":26},"排名第一的中标候选人放弃中标的，招标人只能重新招标",{"key":34,"text":424,"correct":22},"排名第一的中标候选人不按照招标文件要求提交履约保证金，或者被查实存在影响中标结果的违法行为等情形，不符合中标条件的，招标人可以按照评标委员会提出的中标候选人名单排序依次确定其他中标候选人为中标人",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":439,"analysis":37},1101960,"关于两阶段招标的表述中，符合《招标投标法实施条例》规定的有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":22},"对技术复杂或者无法精确拟定技术规格的项目，招标人可以分两阶段进行招标",{"key":24,"text":432,"correct":26},"两阶段招标只能采用公开招标，不得采用邀请招标",{"key":28,"text":434,"correct":26},"第一阶段的技术标内应当附带报价，否则视为废标",{"key":31,"text":436,"correct":22},"第一阶段招标，招标人在投标须知规定的时间和地点进行公开开标，会上可以由招标人宣读各投标书的内容，也可以请投标人自己讲解各自递交的投标方案",{"key":34,"text":438,"correct":26},"第一阶段便涉及报价问题，是进行价格竞争的预备阶段","AD",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":454,"analysis":37},1101961,"下列文件中，属于招标文件组成内容的有（ ）。",[444,446,448,450,452],{"key":20,"text":445,"correct":26},"投标人针对招标文件提出的质疑",{"key":24,"text":447,"correct":22},"投标预备会的会议纪要",{"key":28,"text":449,"correct":22},"对投标人质疑的书面解答",{"key":31,"text":451,"correct":26},"招标人发布的资格预审公告",{"key":34,"text":453,"correct":22},"招标人对招标文件的修改","BCE",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":111,"analysis":37},1101962,"建设工程施工招标投标过程中，可以没收投标保证金的情形有（ ）。",[459,461,463,465,467],{"key":20,"text":460,"correct":26},"投标截止日期前，投标人撤回投标文件的",{"key":24,"text":462,"correct":22},"投标人在投标有效期内撤销投标文件的",{"key":28,"text":464,"correct":22},"收到中标通知书后，中标人无正当理由拒绝签订合同的",{"key":31,"text":466,"correct":22},"收到中标通知书后，未按招标文件规定提交履约担保的",{"key":34,"text":468,"correct":26},"未中标投标人在中标公示期满对评标结果有异议的",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":439,"analysis":37},1101963,"下列建设工程进度影响因素中，属于业主因素的有（ ）。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"提供的场地不能满足工程正常需要",{"key":24,"text":476,"correct":26},"施工计划安排不周密导致相关作业脱节",{"key":28,"text":478,"correct":26},"临时停水、停电、断路",{"key":31,"text":480,"correct":22},"不能及时向施工承包单位付款",{"key":34,"text":482,"correct":26},"外单位临近工程施工干扰",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":497,"analysis":37},1101964,"下列建设工程进度影响因素中，属于组织管理因素的有（ ）",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"业主使用要求改变而变更设计",{"key":24,"text":490,"correct":22},"向有关部门提出各种审批手续的延误",{"key":28,"text":492,"correct":22},"计划安排不周密导致停工待料",{"key":31,"text":494,"correct":26},"施工图纸供应不及时和不配套",{"key":34,"text":496,"correct":26},"有关方拖欠资金","BC",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":311,"analysis":37},1101965,"下列建设工程进度控制任务中，属于设计准备阶段进度控制任务的有（ ）。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"编制工程项目总进度计划",{"key":24,"text":505,"correct":26},"编制详细的出图计划",{"key":28,"text":507,"correct":22},"进行工期目标和进度控制决策",{"key":31,"text":509,"correct":22},"进行环境及施工现场条件的调查和分析",{"key":34,"text":511,"correct":26},"编制工程年、季、月实施计划",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":82,"analysis":37},1101966,"《简明标准施工招标文件》的适用条件须同时满足（ ）。",[516,518,520,522,523],{"key":20,"text":517,"correct":22},"技术相对简单",{"key":24,"text":519,"correct":22},"工期不超过12个月",{"key":28,"text":521,"correct":22},"依法必须招标的项目",{"key":31,"text":336,"correct":26},{"key":34,"text":338,"correct":22},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":538,"analysis":37},1101967,"发售招标文件收取的费用应当限于补偿（ ）的成本支出。",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"编制招标文件",{"key":24,"text":531,"correct":22},"印刷招标文件",{"key":28,"text":533,"correct":26},"招标人办公",{"key":31,"text":535,"correct":26},"招标活动",{"key":34,"text":537,"correct":22},"邮寄招标文件","BE",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":111,"analysis":37},1101968,"建设工程施工招标公告的内容包（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":26},"建设资金来源",{"key":24,"text":546,"correct":22},"招标人的名称",{"key":28,"text":548,"correct":22},"项目概况",{"key":31,"text":550,"correct":22},"投标人的资格要求",{"key":34,"text":552,"correct":26},"评标办法",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":566,"analysis":37},1101970,"投标人须知中的前附表的内容包括（ ）。",[557,559,561,562,564],{"key":20,"text":558,"correct":22},"明确新项目的要求",{"key":24,"text":560,"correct":22},"招标程序中主要工作步骤的时间安排",{"key":28,"text":552,"correct":26},{"key":31,"text":563,"correct":22},"对投标书的编制要求",{"key":34,"text":565,"correct":26},"纪律的监督","ABD",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":244,"analysis":37},1101971,"以下（ ）属于招标文件的内容。",[571,573,574,576,578],{"key":20,"text":572,"correct":22},"投标人须知",{"key":24,"text":552,"correct":22},{"key":28,"text":575,"correct":22},"投标文件格式",{"key":31,"text":577,"correct":26},"已标价工程量清单",{"key":34,"text":579,"correct":26},"对投标文件的澄清",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":244,"analysis":37},1101972,"以下（ ）属于资格预审报告的内容。",[584,586,588,590,592],{"key":20,"text":585,"correct":22},"资格审查委员会名单",{"key":24,"text":587,"correct":22},"资格审查过程中澄清、说明、补正事项纪要",{"key":28,"text":589,"correct":22},"资格评分比较一览表的排序",{"key":31,"text":591,"correct":26},"推荐的中标侯选人名单",{"key":34,"text":593,"correct":26},"评标各因素分值与评分标准",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":339,"analysis":37},1101984,"下列关于建设工程项目招标的说法正确的是（）。",[598,600,602,604,606],{"key":20,"text":599,"correct":26},"招标人既可以自行招标，也可以委托招标",{"key":24,"text":601,"correct":26},"招标人有编制招标文件的能力时可以自行招标",{"key":28,"text":603,"correct":22},"招标人如不具备自行组织招标的能力条件，应当委托招标",{"key":31,"text":605,"correct":26},"招标代理机构应当有符合规定条件的专家库",{"key":34,"text":607,"correct":22},"招标代理机构应当有从事招标代理业务的营业场所和相应资金",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":111,"analysis":37},1101985,"建设工程施工招标公告的内容包含（）。",[612,613,614,615,616],{"key":20,"text":544,"correct":26},{"key":24,"text":546,"correct":22},{"key":28,"text":548,"correct":22},{"key":31,"text":550,"correct":22},{"key":34,"text":552,"correct":26},{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":200,"analysis":37},1101986,"公开招标过程中，发出招标公告后至开标前的主要工作内容包括（）。",[621,623,625,627,629],{"key":20,"text":622,"correct":26},"办理招标备案",{"key":24,"text":624,"correct":22},"资格预审",{"key":28,"text":626,"correct":22},"发售招标文件",{"key":31,"text":628,"correct":22},"解答投标人的质疑",{"key":34,"text":630,"correct":22},"组织现场考察",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":111,"analysis":37},1101987,"已履行项目审批手续的招标项目，开始招标前还需向建设行政主管部门进行备案的事项有（）。",[635,637,639,641,643],{"key":20,"text":636,"correct":26},"招标文件",{"key":24,"text":638,"correct":22},"招标范围",{"key":28,"text":640,"correct":22},"招标方式",{"key":31,"text":642,"correct":22},"招标组织形式",{"key":34,"text":644,"correct":26},"中标人",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":659,"analysis":37},1101988,"下列项目中可以适用《简明标准施工招标文件》的是（）。",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"工期6个月.技术相对简单且设计和施工不是由同一承包人承担的小型项目",{"key":24,"text":652,"correct":26},"技术相对简单且设计和施工不是由同一承包人承担的小型项目",{"key":28,"text":654,"correct":26},"工期12个月且设计和施工不是由同一承包人承担的小型项目",{"key":31,"text":656,"correct":26},"工期6个月.技术相对简单的小型项目",{"key":34,"text":658,"correct":22},"工期12个月.技术相对简单且设计和施工不是由同一承包人承担的小型项目","AE",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":244,"analysis":37},1101989,"9 部委联合签发的第56 号令要求，招标人编制的施工招标文件应不加修改地引用《标准施工招标文件》中的（）。",[664,666,667,668,670],{"key":20,"text":665,"correct":22},"通用合同条款",{"key":24,"text":572,"correct":22},{"key":28,"text":552,"correct":22},{"key":31,"text":669,"correct":26},"专用合同条款",{"key":34,"text":671,"correct":26},"申请人须知",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":126,"analysis":37},1101990,"招标人根据标准施工招标文件编制招标文件的做法正确的是（）。",[676,678,680,682,684],{"key":20,"text":677,"correct":26},"应不加修改地引用《标准施工招标文件》中的“评标办法前附表”",{"key":24,"text":679,"correct":26},"应根据项目的具体特点和实际需要引用《标准施工招标文件》中的“投标人须知”",{"key":28,"text":681,"correct":26},"“评标办法前附表”无需考虑招标项目的具体特点和实际需要",{"key":31,"text":683,"correct":22},"“投标人须知前附表”需要考虑招标项目的具体特点和实际需要",{"key":34,"text":685,"correct":22},"应不加修改地引用《标准施工招标文件》中的“通用合同条款”",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":566,"analysis":37},1101991,"根据《标准施工招标文件》，标准施工招标文件的组成包括（）。",[690,691,692,694,696],{"key":20,"text":552,"correct":22},{"key":24,"text":572,"correct":22},{"key":28,"text":693,"correct":26},"发包人要求",{"key":31,"text":695,"correct":22},"图纸",{"key":34,"text":697,"correct":26},"已标价的工程量清单",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":296,"analysis":37},1101992,"关于组织资格预审，下列说法正确的是（）。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"资格预审文件的发售时间应不少于5日",{"key":24,"text":705,"correct":26},"给潜在投标人准备资格预审申请文件的时间应不少于10日",{"key":28,"text":707,"correct":22},"可能影响资格预审申请文件编制的澄清或者修改应至少在提交资格预审申请文件截止时间3日前通知，否则顺延提交资格预审申请文件的截止时间",{"key":31,"text":709,"correct":26},"申请人对资格预审文件的异议应当在递交资格预审申请文件截止时间5日前提出",{"key":34,"text":711,"correct":22},"招标人应当自收到异议之日起3日内做出答复",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":659,"analysis":37},1101994,"某依法必须招标项目的评标委员会组成：招标人代表2 人，建设行政监督部门代表2人，技术、经济方面专家4 人，招标人直接指定的技术专家1 人。下列关于此评标委员会组成的说法正确的有（）。",[716,718,720,722,724],{"key":20,"text":717,"correct":22},"不应该包括建设行政监督部门代表",{"key":24,"text":719,"correct":26},"不应该包括招标人代表",{"key":28,"text":721,"correct":26},"招标人代表所占比例偏低",{"key":31,"text":723,"correct":26},"人数未达到法定要求",{"key":34,"text":725,"correct":22},"如该项目为特殊项目，可由招标人直接指定评标专家",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]