[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":723},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,31,50,2250,[13,38,53,68,83,98,112,127,142,157,171,186,201,215,230,243,258,273,288,302,316,330,345,360,374,389,403,417,432,442,455,469,483,497,510,524,538,552,566,580,594,604,618,631,645,659,673,687,701,713],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1101810,2,"多选题","下列属于标准施工合同通用条款规定的变更范围，可以调整合同价格的是（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","取消合同中某一项工作转由其他人实施",false,{"key":24,"text":25,"correct":26},"B","改变合同中某一项工作的施工时间",true,{"key":28,"text":29,"correct":22},"C","改变合同中某一项工作的数量",{"key":31,"text":32,"correct":26},"D","改变已批准的施工工艺或顺序",{"key":34,"text":35,"correct":26},"E","改变合同工程的基线.标高.位置或尺寸","BDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1101811,"下列关于质量保证金的说法不正确的是（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"质量保证金用以约束承包人在缺陷责任期内履行合同义务",{"key":24,"text":45,"correct":26},"以承包人本期应获得的工程进度付款为基数，按约定的比例扣留本期质量保证金",{"key":28,"text":47,"correct":22},"质量保证金总预留比例不得高于工程价款结算总额的3%",{"key":31,"text":49,"correct":26},"质量保证金从第一次支付工程进度款时开始起扣，直至最后一次支付工程进度款为止",{"key":34,"text":51,"correct":26},"在缺陷责任期满颁发缺陷责任终止证书时一并向承包人返还质量保证金","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1101812,"在合同履行阶段确定暂估价内的工程材料、设备或专业工程施工的最终价格，方法正确的是（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"属于依法必须招标的项目，按招标的中标价确定",{"key":24,"text":60,"correct":22},"未达到必须招标的规模或标准时，承包人负责提供的材料和设备，由承包人确定价格",{"key":28,"text":62,"correct":22},"未达到必须招标的规模或标准时，承包人负责提供的材料和设备，由供应商确定价格",{"key":31,"text":64,"correct":26},"未达到必须招标的规模或标准时，承包人负责提供的材料和设备，由监理人确认价格",{"key":34,"text":66,"correct":26},"未达到必须招标的规模或标准时，专业工程施工的价格由监理人进行估价确定","ADE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1101813,"根据《标准施工招标文件》的施工合同文本通用合同条款，“暂估价”和“暂列金额”的主要区别有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"是否列入已标价的工程量清单",{"key":24,"text":75,"correct":26},"是否在招标阶段已经确定价格",{"key":28,"text":77,"correct":26},"是否在合同履行阶段必然发生",{"key":31,"text":79,"correct":26},"承包人是否必然获得支付",{"key":34,"text":81,"correct":22},"是否包括在签约合同价内","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1101814,"发包人提供的材料和工程设备验收后，下列（）由承包人承担。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"因提前交货增加的保管费用",{"key":24,"text":90,"correct":26},"施工现场内的二次搬运费用",{"key":28,"text":92,"correct":22},"质量不合格导致返工费用",{"key":31,"text":94,"correct":22},"质量不合格导致工期延误",{"key":34,"text":96,"correct":26},"材料设备的接收费用","BE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":52,"analysis":37},1101815,"发包人要求提前提交材料和工程设备，则下列说法不正确的是（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"承包人自行决定拒绝或接收",{"key":24,"text":105,"correct":26},"承包人应当拒绝",{"key":28,"text":107,"correct":22},"承包人不得拒绝",{"key":31,"text":109,"correct":26},"由发包人承担保管费用",{"key":34,"text":111,"correct":26},"由承包人承担增加的保管费用",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1101816,"承包人违约导致合同解除后，发包人的权限范围包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"派员进驻施工场地，另行组织人员或委托其他承包人施工",{"key":24,"text":119,"correct":22},"没收承包人在现场的材料.设备和临时设施",{"key":28,"text":121,"correct":26},"要求承包人将其为实施合同而签订的订货合同在解除合同后14天内依法转让给发包人",{"key":31,"text":123,"correct":26},"暂停对承包人的一切付款",{"key":34,"text":125,"correct":26},"向承包人索赔由于解除合同给发包人造成的损失","ACDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1101817,"施工合同履行期间，一方当事人因不可抗力导致不可能继续履行合同义务时，下列说法不正确的是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"应当及时通知对方解除合同",{"key":24,"text":134,"correct":22},"合同解除后，承包人应撤离施工场地",{"key":28,"text":136,"correct":26},"合同解除后，已经订货的材料.设备由发包人负责退货或解除订货合同",{"key":31,"text":138,"correct":22},"合同解除后，不能退还的货款和因退货.解除订货合同发生的费用，由发包人承担",{"key":34,"text":140,"correct":26},"合同解除后，因未及时退货造成的损失由发包人承担","CE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1101818,"对于施工中发生的不可抗力，标准施工合同通用条款规定发包人应承担的损失包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"工程所需清理费",{"key":24,"text":149,"correct":26},"由承包人负责采购，运至施工场地用于施工材料的损失",{"key":28,"text":151,"correct":26},"工程本身的损害",{"key":31,"text":153,"correct":26},"工程损害导致第三方人员伤亡",{"key":34,"text":155,"correct":22},"承包人施工机械的停工损失","ABCD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":97,"analysis":37},1101819,"如果承包人认为发包人提供的图纸和文件存在属于变更范围的情形，则下列说法正确的是（）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"承包人可以直接实施变更",{"key":24,"text":164,"correct":26},"承包人应当向监理人提出书面变更建议",{"key":28,"text":166,"correct":22},"承包人应当向监理人提出书面变更建议后直接实施变更",{"key":31,"text":168,"correct":22},"监理人应当同意承包人提出的变更建议",{"key":34,"text":170,"correct":26},"监理人确认存在变更后，应在收到承包人书面变更建议后的14天内做出变更指示",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1101820,"下列事故和损失中应当由承包人承担责任的有（）。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"承包人雇佣的施工人员的工伤事故",{"key":24,"text":178,"correct":26},"分包人人员的工伤事故",{"key":28,"text":180,"correct":22},"发包人造成的分包人人员的工伤事故",{"key":31,"text":182,"correct":26},"由于承包人原因在施工场地毗邻地带造成的第三者人身伤亡和财产损失",{"key":34,"text":184,"correct":22},"工程对土地的占用所造成的第三者财产损失","ABD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},1101821,"下列关于监理人进行工程量复核的说法中，正确的是（）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"监理人应在收到承包人提交的工程量报表后的14天内进行工程量复核",{"key":24,"text":193,"correct":26},"监理人未在约定时间内复核，则按照承包人提交的工程量报表中的工程量计算工程价款",{"key":28,"text":195,"correct":26},"承包人未按监理人要求参加复核，则按照监理人单方复核或修正的工程量计算工程价款",{"key":31,"text":197,"correct":22},"总价子目已完成工程量通常不进行图纸计量，只进行现场计量",{"key":34,"text":199,"correct":22},"监理人应对现场实际已完工程量进行计量","BC",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":126,"analysis":37},1101822,"下列（）情形导致工期顺延，原定竣工日后的支付过程中，调价公式继续有效。",[205,207,209,211,213],{"key":20,"text":206,"correct":26},"不可抗力事件的影响",{"key":24,"text":208,"correct":22},"承包人采购的施工材料未按时交货",{"key":28,"text":210,"correct":26},"施工许可证没有及时颁发",{"key":31,"text":212,"correct":26},"发包人原因不具备合同约定的开工条件",{"key":34,"text":214,"correct":26},"发包人迟延提供材料",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1101823,"在某项目施工中，监理人对已覆盖的隐蔽工程部位质量有疑问并进行了重新检验，结果表明质量合格，但检验影响了正常施工，则（）。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"影响正常施工的费用由承包人承担",{"key":24,"text":222,"correct":26},"影响正常施工的费用由发包人承担",{"key":28,"text":224,"correct":22},"影响正常施工的费用由监理人承担",{"key":31,"text":226,"correct":26},"工期给予顺延",{"key":34,"text":228,"correct":22},"工期不予顺延","BD",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":242,"analysis":37},1101824,"承包人未通知监理人到场检查，私自将工程隐蔽部位进行了覆盖，监理人指示承包人揭开检查，检查影响了正常施工。如结果表明质量合格，则（）。",[234,236,238,240,241],{"key":20,"text":235,"correct":26},"增加的费用由承包人承担",{"key":24,"text":237,"correct":22},"增加的费用由发包人承担",{"key":28,"text":239,"correct":22},"增加的费用由监理人承担",{"key":31,"text":226,"correct":22},{"key":34,"text":228,"correct":26},"AE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},1101825,"某施工合同履行中，监理人与承包人按合同约定共同进行工程的检验，如监理人收到承包人共同检验的通知后，既未发出变更检验时间的通知，又未按时参加，则下列说法正确的是（）。",[247,249,251,253,255],{"key":20,"text":248,"correct":26},"承包人可以单独进行检验，视为监理人在场情况下进行",{"key":24,"text":250,"correct":22},"监理人对承包人单独进行的检验结果可以拒绝确认",{"key":28,"text":252,"correct":26},"监理人对承包人单独进行的检验结果有疑问可以要求重新检验",{"key":31,"text":254,"correct":22},"重新检验由监理人单独进行",{"key":34,"text":256,"correct":22},"重新试验结果证明质量符合合同要求，由此增加的费用和（或）工期延误由监理人承担","AC",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},1101826,"施工合同履行中，对承包人施工设备的控制，说法正确的是（）。",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"增加或更换施工设备导致增加的费用和工期延误由承包人承担",{"key":24,"text":265,"correct":22},"如不影响合同进度计划，施工设备和临时设施中的任何部分可运出施工场地或挪作他用",{"key":28,"text":267,"correct":26},"未经监理人同意，施工设备和临时设施中的任何部分均不得运出施工场地或挪作他用",{"key":31,"text":269,"correct":22},"闲置的或后期不再使用的施工设备不会影响合同进度计划，承包人可将其撤离施工现场",{"key":34,"text":271,"correct":26},"闲置的或后期不再使用的施工设备，经监理人审核同意后方可将其撤离施工现场","ACE",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},1101827,"施工合同履行中，如果发包人出于某种考虑要求提前竣工，则发包人应（）。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"负责修改施工进度计划",{"key":24,"text":280,"correct":22},"通过监理人向承包人发出提前竣工的指令",{"key":28,"text":282,"correct":26},"与承包人协商并签订提前竣工协议",{"key":31,"text":284,"correct":26},"为承包人提供赶工的便利条件",{"key":34,"text":286,"correct":22},"减少对工程质量的检测试验","CD",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":156,"analysis":37},1101828,"发生暂停施工的紧急情况时，承包人、监理人的行为不正确的是（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"承包人不得先行暂停施工",{"key":24,"text":295,"correct":26},"承包人应及时提出暂停施工的书面请求，等待监理人指示",{"key":28,"text":297,"correct":26},"监理人应在接到书面请求后12小时内予以答复",{"key":31,"text":299,"correct":26},"监理人逾期未答复视为拒绝",{"key":34,"text":301,"correct":22},"暂停施工期间由承包人负责妥善保护工程并提供安全保障",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":272,"analysis":37},1101829,"根据标准施工合同的通用条款规定，下列关于合同进度计划的管理，说法正确的是（）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"如果工程实际进度滞后于计划进度，应修订合同进度计划",{"key":24,"text":309,"correct":22},"如果工程实际进度超前于计划进度，不用修订合同进度计划",{"key":28,"text":311,"correct":26},"承包人可以主动修订合同进度计划，报监理人审批",{"key":31,"text":313,"correct":22},"监理人也可以修订合同进度计划，指示承包人遵照执行",{"key":34,"text":315,"correct":26},"监理人应在约定期限内对修订合同进度计划的申请报告予以批复",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":329,"analysis":37},1101830,"按照《建设工程施工合同》通用条款的规定，因不可抗力事件导致的损失应由发包人承担的包括（）。",[320,321,323,325,327],{"key":20,"text":151,"correct":26},{"key":24,"text":322,"correct":26},"由发包人采购，已运至施工现场待安装设备的损害",{"key":28,"text":324,"correct":26},"由承包人采购，已运至施工现场待安装设备的损害",{"key":31,"text":326,"correct":22},"承包方人员伤亡",{"key":34,"text":328,"correct":22},"承包人停工损失","ABC",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},1101831,"按照施工合同内不可抗力条款的规定，下列事件中属于不可抗力的有（）。",[334,336,338,340,342],{"key":20,"text":335,"correct":26},"龙卷风导致吊车倒塌",{"key":24,"text":337,"correct":26},"地震导致主体建筑物的开裂",{"key":28,"text":339,"correct":22},"承包人管理不善导致的仓库爆炸",{"key":31,"text":341,"correct":22},"承包人拖欠雇员工资导致的动乱",{"key":34,"text":343,"correct":26},"非发包人和承包人责任发生的火灾","ABE",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":359,"analysis":37},1101832,"下列有关隐蔽工程与重新检验提法中正确的有（）。",[349,351,353,355,357],{"key":20,"text":350,"correct":26},"承包人自检后书面通知工程师验收",{"key":24,"text":352,"correct":26},"工程师接到承包人的通知后，应在约定的时间与承包人共同检验",{"key":28,"text":354,"correct":26},"若工程师未能按时提出延期检验要求，又未能按时参加验收，承包人可自行检验",{"key":31,"text":356,"correct":22},"若工程师已经在验收合格记录上签字，只有当有确切证据证明工程有问题的情况下才能要求承包人对已隐蔽的工程进行重新检验",{"key":34,"text":358,"correct":26},"重新检验如果不合格，应由承包人承担全部费用，工期不予顺延","ABCE",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":257,"analysis":37},1101833,"某项目施工过程中，由于空中飞行物坠落给施工造成了重大损害，（）应当由承包方承担。",[364,366,368,370,372],{"key":20,"text":365,"correct":26},"承包方人员伤亡损失",{"key":24,"text":367,"correct":22},"发包方人员伤亡损失",{"key":28,"text":369,"correct":26},"承包方施工设备损坏的损失",{"key":31,"text":371,"correct":22},"运至施工场地待安装工程设备的损害",{"key":34,"text":373,"correct":22},"工程修复费用",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":388,"analysis":37},1101834,"以下对索赔的表述中，正确的是（）。",[378,380,382,384,386],{"key":20,"text":379,"correct":26},"索赔要求的提出不需经对方同意",{"key":24,"text":381,"correct":22},"索赔依据应在合同中有明确根据",{"key":28,"text":383,"correct":26},"应在索赔事件发生后的28天内递交索赔意向通知书",{"key":31,"text":385,"correct":26},"监理人的索赔处理决定超过权限时应报发包人批准",{"key":34,"text":387,"correct":22},"承包人必须执行监理人的索赔处理决定","ACD",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":82,"analysis":37},1101835,"施工合同示范文本通用条款中明确规定，工程师依据工程项目的需要和施工现场的实际情况，可以向承包人发出变更通知的情况有（）。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"删减部分合同规定工作内容交给其他承包人完成",{"key":24,"text":396,"correct":26},"更改部分工程的位置和尺寸",{"key":28,"text":398,"correct":26},"增加部分合同中约定的工程量",{"key":31,"text":400,"correct":26},"为了协调施工干扰而改变有关工程的施工时间和顺序",{"key":34,"text":402,"correct":22},"要求承包人使用其投标书内没有承诺必须到场的大型施工机械，完成新增加的工程",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":185,"analysis":37},1101836,"确定变更价款的原则：确定变更价款时，应维持承包人投标报价单内的竞争性水平，具体原则包括（）。",[407,409,411,413,415],{"key":20,"text":408,"correct":26},"已标价工程量清单中有适用于变更工作的子目，采用该子目的单价计算变更费用",{"key":24,"text":410,"correct":26},"已标价工程量清单中无适用或类似子目的单价，可按照成本加利润的原则，由监理人商定或确定变更工作的单价",{"key":28,"text":412,"correct":22},"合同中没有适用或类似于变更工程的价格，由发包方提出适当的变更价格，经工程师确认后执行",{"key":31,"text":414,"correct":26},"已标价工程量清单中无适用于变更工作的子目，但有类似子目，可在合理范围内参照类似子目的单价，由监理人商定或确定变更工作的单价",{"key":34,"text":416,"correct":22},"合同中没有适用或类似于变更工程的价格，由工程师自己确定变更价格并执行",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":431,"analysis":37},1101837,"根据建设工程施工合同示范文本的规定，导致现场发生暂停施工的下列情形中，承包商在执行工程师暂停施工的指示后，可以要求发包人追加合同价款并顺延工期的包括（）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"施工作业方法可能危及邻近建筑物的安全",{"key":24,"text":424,"correct":26},"施工中遇到了与地质报告不一致的软弱层",{"key":28,"text":426,"correct":26},"发包人订购的设备不能按时到货",{"key":31,"text":428,"correct":22},"施工机械设备进行维修",{"key":34,"text":430,"correct":26},"发包人未能按时移交后续施工的现场","BCE",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":329,"analysis":37},1101838,"对于施工中发生的不可抗力，施工合同示范文本规定发包人应承担的损失包括（）。",[436,437,438,439,441],{"key":20,"text":147,"correct":26},{"key":24,"text":149,"correct":26},{"key":28,"text":151,"correct":26},{"key":31,"text":440,"correct":22},"承包方造成的人员伤亡损失",{"key":34,"text":155,"correct":22},{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":454,"analysis":37},1101839,"依照施工合同示范文本通用条款规定，施工合同履行中，如果发包人出于某种考虑要求提前竣工，则发包人应（）。",[446,447,449,450,452],{"key":20,"text":278,"correct":22},{"key":24,"text":448,"correct":22},"向承包人直接发出提前竣工的指令",{"key":28,"text":282,"correct":26},{"key":31,"text":451,"correct":26},"发包人应提供的条件",{"key":34,"text":453,"correct":26},"提前竣工给发包人带来效益应给承包人的奖励","CDE",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":36,"analysis":37},1101840,"施工合同履行中，需要进行爆破作业时，承包人应完成的义务包括（）。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"取得相关行政管理部门的爆破作业许可",{"key":24,"text":462,"correct":26},"取得爆破作业资质证件",{"key":28,"text":464,"correct":22},"与相邻建筑物所有人进行协调",{"key":31,"text":466,"correct":26},"作好施工现场的安全防护工作",{"key":34,"text":468,"correct":26},"保护相邻建筑物",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":67,"analysis":37},1101841,"施工合同示范文本规定可以顺延工期的条件有（）。",[473,475,477,479,481],{"key":20,"text":474,"correct":26},"不可抗力",{"key":24,"text":476,"correct":22},"承包人的违约",{"key":28,"text":478,"correct":22},"施工机械发生故障",{"key":31,"text":480,"correct":26},"发包人延迟提供材料",{"key":34,"text":482,"correct":26},"提供图纸延误",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":67,"analysis":37},1101842,"某施工合同履行过程中，承包人在施工中提出的合理化建议被发包人采纳。建议涉及对设备的换用，并征得工程师同意。承包人的权利和义务包括（）。",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"修改施工组织设计",{"key":24,"text":490,"correct":22},"承担更换设备发生的费用",{"key":28,"text":492,"correct":22},"自行享有获得的工程收益",{"key":31,"text":494,"correct":26},"与发包人协议工程收益的分享",{"key":34,"text":496,"correct":26},"要求顺延此项变更导致延误的工期",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":156,"analysis":37},1101843,"施工过程中如果发包人要求提前竣工，应与承包商协商并签订提前竣工协议。根据《建设工程施工合同（示范文本）》，提前竣工协议书中应包括的内容有（）。",[501,503,504,506,508],{"key":20,"text":502,"correct":26},"承包人修订进度计划",{"key":24,"text":451,"correct":26},{"key":28,"text":505,"correct":26},"承包人采取的赶工措施",{"key":31,"text":507,"correct":26},"提前竣工需追加的合同价款",{"key":34,"text":509,"correct":22},"承包人未能提前竣工的延误赔偿计算方法",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":229,"analysis":37},1101844,"下列在施工过程中因不可抗力事件导致的损失，应由承包人承担的有（）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"施工现场待安装的设备损坏",{"key":24,"text":517,"correct":26},"承包人的人员伤亡",{"key":28,"text":519,"correct":22},"在现场的第三方人员伤亡",{"key":31,"text":521,"correct":26},"承包人设备的停工损失",{"key":34,"text":523,"correct":22},"停工期间，承包人留在现场保卫人员的费用",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":359,"analysis":37},1101845,"在下列（）情况下，工程师可以暂停施工。",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"地方法规要求在某一时间段内不允许施工",{"key":24,"text":531,"correct":26},"同时在现场的几个独立承包人之间出现施工交叉干扰",{"key":28,"text":533,"correct":26},"施工作业方法可能危及现场或毗邻地区建筑物或人身安全",{"key":31,"text":535,"correct":22},"发包人订购的设备已运抵施工现场",{"key":34,"text":537,"correct":26},"施工遇到了有考古价值的文物或古迹需要进行现场保护",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":185,"analysis":37},1101846,"根据《标准施工招标文件》，下列关于合同附件格式说法正确的有（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":26},"合同附件格式包括合同协议书、履约保函和预付款保函",{"key":24,"text":545,"correct":26},"合同协议书中包括了签约合同价",{"key":28,"text":547,"correct":22},"履约保函和预付款保函的担保方式 不同",{"key":31,"text":549,"correct":26},"担保方式采用无条件担保",{"key":34,"text":551,"correct":22},"预付款担保采用有条件担保",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":185,"analysis":37},1101847,"下列有关确定变更价款的做法，正确的有（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":26},"变更确定后承包人及时提出追加价款要求的报告",{"key":24,"text":559,"correct":26},"工程师在规定时间内对承包人的要求作出答复",{"key":28,"text":561,"correct":22},"确定的价款报送造价管理部门备案",{"key":31,"text":563,"correct":26},"监理人收到承包人的变更报价书后的14天内，商定或确定变更价格",{"key":34,"text":565,"correct":22},"承包人未提出追加价款报告，工程师可单独决定补偿额",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":359,"analysis":37},1101848,"根据《标准施工合同》，除了明确规定对当事人双方有约束力的合同组成文件外，具体招标工程项目订立合同时需要明确填写的内容仅包括（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":26},"发包人和承包人的名称",{"key":24,"text":573,"correct":26},"施工的工程或标段",{"key":28,"text":575,"correct":26},"签约合同价",{"key":31,"text":577,"correct":22},"双方义务",{"key":34,"text":579,"correct":26},"质量标准",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":329,"analysis":37},1101849,"标准施工合同规定的预付款担保采用银行保函形式，主要特点有（ ）。",[584,586,588,590,592],{"key":20,"text":585,"correct":26},"担保期限",{"key":24,"text":587,"correct":26},"担保方式",{"key":28,"text":589,"correct":26},"担保金额",{"key":31,"text":591,"correct":22},"担保当事人",{"key":34,"text":593,"correct":22},"担保事项",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":603,"analysis":37},1101850,"标准施工合同要求履约担保采用保函的形式，给出的履约保函准格式主要表现的特点有（ ）。",[598,599,600,601,602],{"key":20,"text":585,"correct":26},{"key":24,"text":587,"correct":26},{"key":28,"text":589,"correct":22},{"key":31,"text":591,"correct":22},{"key":34,"text":593,"correct":22},"AB",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":388,"analysis":37},1101851,"施工合同的中标通知书是招标人接受中标人的书面承诺文件，具体写明的内容有（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":26},"承包的施工标段",{"key":24,"text":611,"correct":22},"投标价",{"key":28,"text":613,"correct":26},"工期",{"key":31,"text":615,"correct":26},"工程质量标准",{"key":34,"text":617,"correct":22},"投标人的项目经理名称",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":359,"analysis":37},1101852,"标准施工合同文件中的投标函附录是投标函内承诺部分主要内容的细化，包括（）",[622,624,625,627,629],{"key":20,"text":623,"correct":26},"项目经理的人选",{"key":24,"text":613,"correct":26},{"key":28,"text":626,"correct":26},"缺陷责任期",{"key":31,"text":628,"correct":22},"承包的工程部位",{"key":34,"text":630,"correct":26},"公式法调价的基数和系数",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":272,"analysis":37},1101853,"按照《建设工程施工合同》的规定，下列选项中属于发包人义务的有（ ）。",[635,637,639,641,643],{"key":20,"text":636,"correct":26},"提供施工场地",{"key":24,"text":638,"correct":22},"现场勘查",{"key":28,"text":640,"correct":26},"组织设计交底",{"key":31,"text":642,"correct":22},"编制施工实施计划",{"key":34,"text":644,"correct":26},"约定开工时间",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":141,"analysis":37},1101854,"根据《施工合同》，合同进度计划的主要作用有（ ）。",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"监理人确认承包人逾期违约的依据",{"key":24,"text":652,"correct":22},"监理人签认索赔付款证书的依据",{"key":28,"text":654,"correct":26},"施工进度受到干扰后，监理人判定是否应顺延合同工期的依据",{"key":31,"text":656,"correct":22},"承包人编制资金计划的基础",{"key":34,"text":658,"correct":26},"监理人控制合同工程进度的依据",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":388,"analysis":37},1101855,"根据《标准施工合同》的要求，关于履约保函的表述中，正确的有（ ）。",[663,665,667,669,671],{"key":20,"text":664,"correct":26},"担保期限自发包人和承包人签订合同之日起，至签发工程移交证书日止",{"key":24,"text":666,"correct":22},"没有采用国际招标工程或使用世界银行贷款建设工程的担保期限至缺陷责任期满止的规定，即担保人对承包人保修期内履行合同义务的行为承担担保责任",{"key":28,"text":668,"correct":26},"采用无条件担保方式，即持有履约保函的发包人认为承包人有严重违约情况时，即可凭保函向担保人要求予以赔偿",{"key":31,"text":670,"correct":26},"当出现承包人严重违约情况时，采用无条件担保方式，不会因为解决合同争议而影响后续程的施工",{"key":34,"text":672,"correct":22},"采用无条件担保方式的唯一要求是需承包人确认",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":156,"analysis":37},1101856,"标准施工合同的通用条款包括24 条，标题包括（ ）",[677,679,681,683,685],{"key":20,"text":678,"correct":26},"交通运输",{"key":24,"text":680,"correct":26},"测量放线",{"key":28,"text":682,"correct":26},"施工安全",{"key":31,"text":684,"correct":26},"治安保卫",{"key":34,"text":686,"correct":22},"消防安全",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":156,"analysis":37},1101857,"标准施工合同规定的预付款担保采用银行保函形式，主要特点为（）",[691,693,695,697,699],{"key":20,"text":692,"correct":26},"担保方式也是采用无条件担保形式",{"key":24,"text":694,"correct":26},"担保期限自预付款支付给承包人起生效",{"key":28,"text":696,"correct":26},"担保期限至发包人签发的进度付款支付证书说明已完全扣清预付款止",{"key":31,"text":698,"correct":26},"担保金额尽管在预付款担保书内填写的数额与合同约定的预付款数额一致",{"key":34,"text":700,"correct":22},"保持担保金额与剩余预付款的金额不相等",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":329,"analysis":37},1101858,"根据《标准施工招标文件》，施工准备阶段承包人的义务包括（ ）。",[705,706,708,710,712],{"key":20,"text":642,"correct":26},{"key":24,"text":707,"correct":26},"现场查勘",{"key":28,"text":709,"correct":26},"提出开工申请",{"key":31,"text":711,"correct":22},"开工通知",{"key":34,"text":640,"correct":22},{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":185,"analysis":37},1101859,"施工准备阶段发包人的义务包括（ ）。",[717,718,719,720,721],{"key":20,"text":636,"correct":26},{"key":24,"text":640,"correct":26},{"key":28,"text":642,"correct":22},{"key":31,"text":644,"correct":26},{"key":34,"text":722,"correct":22},"现场勘察",[724,728,731,734,737,740],{"id":725,"name":726,"category":7,"favorite":727},1,"领导干部任职前廉政法规知识测试题",92,{"id":729,"name":730,"category":7,"favorite":725},595,"建筑结构与设备",{"id":732,"name":733,"category":7,"favorite":725},715,"招标采购专业知识与法律法规",{"id":735,"name":736,"category":7,"favorite":725},848,"市政方向-通用基础",{"id":738,"name":739,"category":7,"favorite":8},534,"BIM工程师",{"id":741,"name":739,"category":7,"favorite":8},535]