[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":730},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,30,50,2250,[13,38,53,67,82,96,111,126,141,155,170,184,199,214,229,241,255,269,282,297,311,326,340,354,368,383,396,406,420,434,448,462,476,490,504,518,532,544,558,572,587,601,616,630,645,659,673,688,702,716],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1101750,2,"多选题","下列承包人的管理中，属于质量检查内容的有( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","质量检查制度",false,{"key":24,"text":25,"correct":26},"B","材料和设备的检验",true,{"key":28,"text":29,"correct":26},"C","施工部位的检查",{"key":31,"text":32,"correct":26},"D","现场工艺试验",{"key":34,"text":35,"correct":22},"E","规范施工作业的操作程序","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1101751,"施工合同履行中，承包人采购的材料经检验合格后已在施工中使用，工程师后来再次检验发现材料不符合设计要求，则( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"承包人负责拆除",{"key":24,"text":45,"correct":26},"承包人承担拆除发生的费用",{"key":28,"text":47,"correct":22},"发包人承担拆除发生的费用",{"key":31,"text":49,"correct":26},"延误的工期不予顺延",{"key":34,"text":51,"correct":22},"已完成的工程应予计量支付","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1101752,"根据《标准施工合同》，关于暂估价的说法，正确的有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"暂估价中涉及的专业工程一定会实施",{"key":24,"text":60,"correct":26},"暂估价是签约合同价的组成部分",{"key":28,"text":62,"correct":22},"暂估价中涉及的专业工程不需要进行招标",{"key":31,"text":64,"correct":26},"暂估价需要在合同履行阶段最终确定",{"key":34,"text":66,"correct":22},"暂估价由监理人控制使用",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1101753,"根据《标准施工合同》，暂列金额的主要特点有( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"用于支付签订协议书时尚未确定的项目款项",{"key":24,"text":74,"correct":26},"用于支付签订协议书时不可预见的变更费用",{"key":28,"text":76,"correct":22},"不能用于计日工支付",{"key":31,"text":78,"correct":26},"属于签约合同价的一部分",{"key":34,"text":80,"correct":26},"承包人不一定能全部获得约定的暂列金额","ABDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":36,"analysis":37},1101754,"根据《标准施工合同》，承包人的施工安全责任有( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"赔偿工程对土地占用所造成的第三者财产损失",{"key":24,"text":89,"correct":26},"编制施工安全措施计划",{"key":28,"text":91,"correct":26},"制定施工安全操作规程",{"key":31,"text":93,"correct":26},"配备必要的安全生产和劳动保护措施",{"key":34,"text":95,"correct":22},"赔偿施工现场所有人员工伤事故损失",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1101755,"按照施工合同内不可抗力条款的规定，下列事件中属于不可抗力的有( )。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"龙卷风导致吊车倒塌",{"key":24,"text":103,"correct":26},"地震导致主体建筑物的开裂",{"key":28,"text":105,"correct":22},"承包人管理不善导致的仓库爆炸",{"key":31,"text":107,"correct":22},"承包人拖欠雇员工资导致的动乱",{"key":34,"text":109,"correct":22},"非发包人和承包人责任发生的火灾","AB",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1101756,"某项目施工过程中，由于空中飞行物坠落给施工造成了重大损害，( )应当由承包方承担。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"承包方人员伤亡损失",{"key":24,"text":118,"correct":22},"发包方人员伤亡损失",{"key":28,"text":120,"correct":26},"承包方施工设备损坏的损失",{"key":31,"text":122,"correct":22},"运至施工场地待安装工程设备的损害",{"key":34,"text":124,"correct":22},"工程修复费用","AC",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1101757,"按照《建设工程施工合同》通用条款的规定，因不可抗力事件导致的损失应由发包人承担的包括( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"工程本身的损害",{"key":24,"text":133,"correct":26},"由发包人采购，已运至施工现场待安装设备的损害",{"key":28,"text":135,"correct":26},"由承包人采购，已运至施工现场待安装设备的损害",{"key":31,"text":137,"correct":22},"承包方人员伤亡",{"key":34,"text":139,"correct":22},"承包人停工损失","ABC",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},1101758,"根据标准施工合同的规定，下列可以事件中，承包人可以索赔工期、费用和利润的有( )。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"施工中遇到地下文物、化石",{"key":24,"text":148,"correct":26},"监理人的指示延误",{"key":28,"text":150,"correct":26},"基准资料错误",{"key":31,"text":152,"correct":26},"隐蔽工程重新检验质量合格",{"key":34,"text":154,"correct":22},"不可抗力不能按期竣工",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1101759,"下列事件发生后既可以索赔费用又可以索赔利润的有( )。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"异常恶劣的气候条件",{"key":24,"text":162,"correct":22},"法规变化引起的价格调整",{"key":28,"text":164,"correct":26},"发包人原因试运行失败，承包人修复",{"key":31,"text":166,"correct":26},"发包人提前占用工程导致承包人费用增加",{"key":34,"text":168,"correct":26},"提供图纸延误","CDE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":110,"analysis":37},1101760,"竣工阶段发包人接受了承包人提交并经监理人签认的竣工付款证书后，承包人不能再对（ ）的事项提出索赔要求。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"施工阶段",{"key":24,"text":177,"correct":26},"竣工阶段",{"key":28,"text":179,"correct":22},"设计阶段",{"key":31,"text":181,"correct":22},"缺陷责任期",{"key":34,"text":183,"correct":22},"保修期",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1101761,"以下对索赔的表述中，正确的有( )。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"索赔的要求不需经对方同意",{"key":24,"text":191,"correct":26},"承包人应在发出索赔意向通知书后28天内，向监理人递交正式的索赔通知书",{"key":28,"text":193,"correct":26},"承包人应在索赔影响结束后的28天内递交最终索赔通知书",{"key":31,"text":195,"correct":26},"承包人接受索赔处理结果，发包人应在做出索赔处理结果答复后28天内完成赔付",{"key":34,"text":197,"correct":22},"承包人必须执行监理人的索赔处理决定","ABCD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1101763,"关于缺陷责任期的说法，正确的有( )。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"缺陷责任期自申请竣工之日起计算",{"key":24,"text":206,"correct":26},"缺陷责任期满，包括延长的期限终止后14天内，监理人出具经发包人签认的缺陷责任期终止证书",{"key":28,"text":208,"correct":26},"结清单生效即表明合同终止",{"key":31,"text":210,"correct":22},"发包人应在最终结清证书后28天内，将应支付款支付给承包人",{"key":34,"text":212,"correct":26},"对于工程主要部位承包人责任的缺陷工程修复后，缺陷责任期相应延长","BCE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1101764,"下列关于缺陷责任期的说法，正确的有( )。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"缺陷责任期从工程接收证书写明的竣工日开始计算",{"key":24,"text":221,"correct":26},"缺陷责任期内出现的问题，承包人负责修复",{"key":28,"text":223,"correct":26},"经查验属于发包人的责任，承包人修复后可以获取修复的费用和利润",{"key":31,"text":225,"correct":22},"如果承包人不能在合理期限内进行修复，发包人可以自行委托他人修复，费用由发包人承担",{"key":34,"text":227,"correct":26},"重新计算的缺陷责任期，包括延长时间在内的缺陷责任期最长时间不得超过2年","ABCE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":198,"analysis":37},1101765,"合同履行中涉及的几个期限为（）。",[233,235,237,238,239],{"key":20,"text":234,"correct":26},"合同工期",{"key":24,"text":236,"correct":26},"施工期",{"key":28,"text":181,"correct":26},{"key":31,"text":183,"correct":26},{"key":34,"text":240,"correct":22},"合同制定期",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":36,"analysis":37},1101766,"下列关于暂停施工程序说法正确的有( )。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"无论何种情况的停工，监理人应与发包人和承包人协商",{"key":24,"text":248,"correct":26},"当工程具备复工条件时，监理人应立即向承包人发出复工通知",{"key":28,"text":250,"correct":26},"承包人无故拖延和拒绝复工，由此增加的费用和工期延误由承包人承担",{"key":31,"text":252,"correct":26},"承包人收到复工通知后，应在指示的期限内复工",{"key":34,"text":254,"correct":22},"因发包人原因无法按时复工时，承包人只可索赔费用",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":268,"analysis":37},1101767,"施工合同示范文本规定可以顺延工期的条件有( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":26},"不可抗力",{"key":24,"text":262,"correct":22},"承包人的违约",{"key":28,"text":264,"correct":22},"施工机械发生故障",{"key":31,"text":266,"correct":26},"发包人延迟提供材料",{"key":34,"text":168,"correct":26},"ADE",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":81,"analysis":37},1101768,"施工合同示范文本规定，因( )等原因导致竣工时间延长．经监理人确认后可以顺延工期。",[273,274,276,278,280],{"key":20,"text":260,"correct":26},{"key":24,"text":275,"correct":26},"工程量增加",{"key":28,"text":277,"correct":22},"承包商基础施工超挖",{"key":31,"text":279,"correct":26},"设计变更",{"key":34,"text":281,"correct":26},"监理人延误提供所需指令",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":296,"analysis":37},1101769,"施工中若发包人出于某种考虑要求提前竣工，发包人要( )。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"负责修改施工进度计划",{"key":24,"text":289,"correct":22},"向承包人直接发出提前竣工的指令",{"key":28,"text":291,"correct":26},"与承包人协商并签订提前竣工协议",{"key":31,"text":293,"correct":26},"为承包人提供赶工的便利条件",{"key":34,"text":295,"correct":22},"减少对工程质量的检测试验","CD",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":198,"analysis":37},1101770,"施工过程中如果发包人要求提前竣工，应与承包商协商并签订提前竣工协议。根据《建设工程施工合同(示范文本)》，提前竣工协议书中应包括的内容有( )。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"承包人修订进度计划",{"key":24,"text":304,"correct":26},"发包人应提供的条件",{"key":28,"text":306,"correct":26},"承包人采取的赶工措施",{"key":31,"text":308,"correct":26},"提前竣工需追加的合同价款",{"key":34,"text":310,"correct":22},"承包人未能提前竣工的延误赔偿计算方法",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":325,"analysis":37},1101771,"下列在施工阶段发生的事件中，可以顺延工期的情况包括( )。",[315,317,319,321,323],{"key":20,"text":316,"correct":26},"不可抗力事件的影响",{"key":24,"text":318,"correct":22},"承包人采购的施工材料未按时交货",{"key":28,"text":320,"correct":26},"施工许可证没有及时颁发",{"key":31,"text":322,"correct":22},"不具备合同约定的开工条件",{"key":34,"text":324,"correct":26},"监理人未按合同约定提供所需指令","ACE",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":198,"analysis":37},1101772,"按照施工合同范本通用条件的规定，经工程师确认后工期相应顺延的情形包括( )。",[330,332,334,336,338],{"key":20,"text":331,"correct":26},"奥运会期间按政府要求承包人暂停施工",{"key":24,"text":333,"correct":26},"发包人不能按约定日期支付工程预付款、进度款，致使工程不能正常进行",{"key":28,"text":335,"correct":26},"工程师未按合同约定提供所需指令、批准等，致使施工不能正常进行",{"key":31,"text":337,"correct":26},"同时在现场的两个承包人发生施工干扰，监理人从整体协调考虑，指示某一承包人暂停施工",{"key":34,"text":339,"correct":22},"承包人的施工机械故障使得工期延误",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":81,"analysis":37},1101773,"根据建设工程施工合同示范文本的规定，合同履行发生的下列费用中，可纳入承包人提交的工程进度款支付申请书中的款项包括（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"本期完成的工程量对应报价单的相应价格计算的工程款",{"key":24,"text":347,"correct":26},"设计变更调整的合同价款",{"key":28,"text":349,"correct":22},"因不可抗力导致人员伤亡的损害赔偿款",{"key":31,"text":351,"correct":26},"本期应扣回的工程预付款",{"key":34,"text":353,"correct":26},"承包人的索赔款",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":213,"analysis":37},1101777,"工程移交发包人运行后，缺陷责任期内出现的工程质量缺陷可能是承包人的施工质量原因，也可能属于非承包人应负责的原因导致。应由（ ）共同查明原因，分清责任。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"设计人",{"key":24,"text":361,"correct":26},"监理人",{"key":28,"text":363,"correct":26},"发包人",{"key":31,"text":365,"correct":22},"勘察人",{"key":34,"text":367,"correct":26},"承包人",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":382,"analysis":37},1101778,"施工阶段发包人违约的情况包括（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"发包人原因造成停工的持续时间超过28d",{"key":24,"text":375,"correct":26},"发包人拖延、拒绝批准付款申请和支付凭证，导致付款延误",{"key":28,"text":377,"correct":26},"发包人无法继续履行或明确表示不履行或实质上已停止履行合同",{"key":31,"text":379,"correct":26},"监理人无正当理由没有在约定期限内发出复工指示，导致承包人无法复工",{"key":34,"text":381,"correct":26},"发包人未能按合同约定支付预付款或合同价款","BCDE",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":395,"analysis":37},1101779,"根据《标准施工招标文件》的通用合同条款，可以同时给承包人工期和费用补偿的情形有（ ）。",[387,388,390,391,393],{"key":20,"text":148,"correct":22},{"key":24,"text":389,"correct":26},"施工场地发现文物、化石",{"key":28,"text":154,"correct":22},{"key":31,"text":392,"correct":26},"不利的物质条件",{"key":34,"text":394,"correct":22},"附加浮动引起的价格调整","BD",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":325,"analysis":37},1101781,"下列在施工过程发生的事件中，可以顺延工期的情况包括（ ）。",[400,401,402,403,404],{"key":20,"text":316,"correct":26},{"key":24,"text":318,"correct":22},{"key":28,"text":320,"correct":26},{"key":31,"text":322,"correct":22},{"key":34,"text":405,"correct":26},"工程师未按合同约定提供所需指令",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":213,"analysis":37},1101782,"导致现场发生暂停施工的下列情形中，承包商在执行工程师暂停施工的指示后，可以要求发包人追加合同价款并顺延工期的包括（ ）。",[410,412,414,416,418],{"key":20,"text":411,"correct":22},"施工作业方法可能危及邻近建筑物的安全",{"key":24,"text":413,"correct":26},"施工中遇到了有考古价值的文物",{"key":28,"text":415,"correct":26},"发包人订购的设备不能按时到货",{"key":31,"text":417,"correct":22},"施工作业危及人身安全",{"key":34,"text":419,"correct":26},"发包人未能按时移交后续施工的现场",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":296,"analysis":37},1101783,"关于暂估价和暂列金额的说法，错误的有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":22},"暂估价用于支付必然发生但暂时不能确定的金额",{"key":24,"text":427,"correct":22},"暂列金额用于在签订协议书时不可预见变更的金额",{"key":28,"text":429,"correct":26},"暂估价包括以计日工方式支付的款项",{"key":31,"text":431,"correct":26},"暂估价属于签约合同价，而暂列金额不属于",{"key":34,"text":433,"correct":22},"承包人不一定能够全部获得暂列金额的支付",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":198,"analysis":37},1101784,"下列因不可抗力造成损失的分担原则符合通用条款规定的有（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":26},"永久工程包括已运至施工场地的材料和工程设备的损害。以及因工程损害造成的第三者人员伤亡和财产损失由发包人承担",{"key":24,"text":441,"correct":26},"承包人设备的损坏由承包人承担",{"key":28,"text":443,"correct":26},"发包人和承包人各自承担其人员伤亡和其他财产损失及其相关费用",{"key":31,"text":445,"correct":26},"停工损失由承包人承担，但停工期间应监理人要求照管工程和清理、修复工程的金额由发包人承担",{"key":34,"text":447,"correct":22},"不能按期竣工的，应合理延长工期，承包人需支付逾期竣工违约金",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":382,"analysis":37},1101788,"《标准施工合同》中，承包人可以获得工期补偿的情形包括（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"不可抗力停工期间的照管和后续清理",{"key":24,"text":455,"correct":26},"因发包人违约承包人暂停施工",{"key":28,"text":457,"correct":26},"增加合同工作内容",{"key":31,"text":459,"correct":26},"发包人原因导致工程质量缺陷",{"key":34,"text":461,"correct":26},"未按合同约定及时支付预付款、进度款",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":81,"analysis":37},1101789,"缺陷责任期内最终结清的程序包括（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":26},"承包人提交最终结清申请单",{"key":24,"text":469,"correct":26},"签发最终结清证书",{"key":28,"text":471,"correct":22},"竣工验收",{"key":31,"text":473,"correct":26},"结清单生效",{"key":34,"text":475,"correct":26},"最终支付",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":36,"analysis":37},1101790,"关于建设工程施工合同竣工验收的表述中，正确的有（ ）。",[480,482,484,486,488],{"key":20,"text":481,"correct":22},"竣工验收基本合格但提出了需要整修和完善要求时，监理人应指示承包人限期修好，并立即发放工程接收证书",{"key":24,"text":483,"correct":26},"经监理人复查整修和完善工作达到了要求，再签发工程接收证书，竣工日仍为承包人提交竣工验收申请报告的日期",{"key":28,"text":485,"correct":26},"竣工验收不合格，监理人应按照验收意见发出指示。要求承包人对不合格工程认真返工重作或进行补救处理，并承担由此产生的费用",{"key":31,"text":487,"correct":26},"承包人在完成不合格工程的返工重作或补救工作后，应重新提交竣工验收申请报告",{"key":34,"text":489,"correct":22},"重新验收如果合格，则工程接收证书中注明的实际竣工日，应为承包人第一次提交竣工验收报告的日期",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":81,"analysis":37},1101792,"施工阶段发包人应在解除合同后28d内向承包人支付的金额有（ ）。",[494,496,498,500,502],{"key":20,"text":495,"correct":26},"合同解除日以前所完成工作的价款",{"key":24,"text":497,"correct":26},"由于解除合同应赔偿的承包人损失",{"key":28,"text":499,"correct":22},"承包人为该工程施工订购并已付款的材料、工程设备和其他物品的金额，发包人付款后，该材料、工程设备和其他物品仍归承包人所有",{"key":31,"text":501,"correct":26},"承包人为完成工程所发生的，而发包人未支付的金额",{"key":34,"text":503,"correct":26},"承包人撤离施工场地以及遣散承包人人员的赔偿金额",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":110,"analysis":37},1101793,"根据建设工程施工合同示范文本的规定，因不可抗力事件导致的下列损失中，应由发包人承担的包括（ ）。",[508,510,512,514,516],{"key":20,"text":509,"correct":26},"工程本身的损失",{"key":24,"text":511,"correct":26},"承包人采购的运至施工现场待安装工程设备的损失",{"key":28,"text":513,"correct":22},"工程的人员伤亡损失",{"key":31,"text":515,"correct":22},"工程停工损失",{"key":34,"text":517,"correct":22},"承包人的施工机械损失",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":36,"analysis":37},1101794,"根据标准施工合同通用条款的规定，下列情形中，可以给予承包商延长合同工期的有（ ）。",[522,524,526,528,530],{"key":20,"text":523,"correct":22},"物价浮动引起的价格调整",{"key":24,"text":525,"correct":26},"施工遇到不可预见的不利于施工的外界条件",{"key":28,"text":527,"correct":26},"业主提前占用部分工程导致后续施工的延误",{"key":31,"text":529,"correct":26},"后续法规调整引起的延误",{"key":34,"text":531,"correct":22},"总包施工中受到分包商的干扰",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":543,"analysis":37},1101795,"根据标准施工合同通用条款的规定，承包人可以提出费用补偿的有（ ）。",[536,538,539,541,542],{"key":20,"text":537,"correct":26},"延误发放图纸",{"key":24,"text":154,"correct":22},{"key":28,"text":540,"correct":26},"其他承包商的干扰",{"key":31,"text":459,"correct":26},{"key":34,"text":160,"correct":22},"ACD",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":213,"analysis":37},1101797,"根据《标准施工合同》，关于工程竣工和缺陷责任期的说法，正确的有（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":22},"监理人应负责照管竣工验收合格后承包人移交的单位工程",{"key":24,"text":551,"correct":26},"单位工程验收成果应作为全部竣工验收申请报告附件",{"key":28,"text":553,"correct":26},"施工合同付款的最终结清应在缺陷责任期终止证书签发后进行",{"key":31,"text":555,"correct":22},"发包人应在工程竣工验收合格后向承包人返还剩余的质量保证金",{"key":34,"text":557,"correct":26},"实际竣工日以承包人提交竣工验收申请报告的日期为准",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":125,"analysis":37},1101798,"下列关于工程竣工结算价款的支付，说法正确的是（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":26},"监理人应在收到承包人提交的竣工付款申请单后的14天内完成核查",{"key":24,"text":565,"correct":22},"发包人在收到监理人提出的核查结果后28天内未完成审核，视为同意",{"key":28,"text":567,"correct":26},"经发包人审核同意后，由监理人向承包人出具经发包人签认的竣工付款证书",{"key":31,"text":569,"correct":22},"承包人对发包人签认的竣工付款证书不得有异议",{"key":34,"text":571,"correct":22},"发包人应在监理人收到竣工付款申请单后56天内将应支付款支付给承包人",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":586,"analysis":37},1101799,"施工工程竣工验收合格后，承包人的竣工日为（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":26},"提交竣工验收申请报告日",{"key":24,"text":579,"correct":22},"有争议时，为提交竣工验收申请报告日",{"key":28,"text":581,"correct":22},"竣工验收合格日",{"key":31,"text":583,"correct":26},"有争议时，为竣工验收合格日",{"key":34,"text":585,"correct":22},"签发工程接收证书日","AD",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":543,"analysis":37},1101800,"下列关于工程竣工日期的说法中，正确的是（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":26},"竣工验收合格，但当事人对实际竣工日期有争议，以竣工验收合格日为竣工日期",{"key":24,"text":594,"correct":22},"竣工验收基本合格，以监理人复查承包人整修和完善工作达到了要求时为竣工日期",{"key":28,"text":596,"correct":26},"竣工验收不合格，重新验收合格后，以重新提交竣工验收申请报告日为竣工日期",{"key":31,"text":598,"correct":26},"发包人延误竣工验收的，以提交竣工验收申请报告日为竣工日期",{"key":34,"text":600,"correct":22},"承包人提交竣工验收报告前，发包人擅自使用，施工合同对此未作约定时，以提交竣工验收申请报告日为竣工日期",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":615,"analysis":37},1101801,"下列关于工程设备试运行组织责任的说法中，正确是（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":26},"由承包人负责组织",{"key":24,"text":608,"correct":22},"由发包人负责组织",{"key":28,"text":610,"correct":22},"由监理人负责组织",{"key":31,"text":612,"correct":22},"发包人采购的设备试运行费用由发包人承担",{"key":34,"text":614,"correct":26},"承包人担全部试运行费用","AE",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":228,"analysis":37},1101802,"发生发包人违反合同规定的情况时，下列处理方法不正确的是（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":26},"承包人立即解除合同",{"key":24,"text":623,"correct":26},"监理人发出通知要求纠正",{"key":28,"text":625,"correct":26},"承包人立即暂停施工",{"key":31,"text":627,"correct":22},"承包人发出通知要求纠正未果后暂停施工",{"key":34,"text":629,"correct":26},"暂停施工14天后发包人仍不纠正违约行为时解除合同",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":644,"analysis":37},1101803,"根据《标准施工招标文件》的施工合同文本通用合同条款，承包人竣工清场的主要义务有（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"就交付工程的使用功能向发包人交接",{"key":24,"text":637,"correct":26},"拆除临时工程，清理，平整或复原场地",{"key":28,"text":639,"correct":22},"保证工程建筑物周边及其附近道路交通通畅",{"key":31,"text":641,"correct":26},"施工场地内承包人设备和剩余材料已按计划撤离现场",{"key":34,"text":643,"correct":26},"施工场地内残留垃圾已全部清除出场","BDE",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":543,"analysis":37},1101804,"下列关于合同工程竣工验收的说法中，正确的是（ ）。",[649,651,653,655,657],{"key":20,"text":650,"correct":26},"监理人认为已具备竣工验收条件，应在收到竣工验收申请报告后的28天内提请发包人进行工程验收",{"key":24,"text":652,"correct":22},"竣工验收合格，应在监理人收到竣工验收申请报告后的56天内，由发包人向承包人出具工程接收证书",{"key":28,"text":654,"correct":26},"竣工验收基本合格但提出了需要整修和完善要求时，监理人应指示承包人限期修好，并缓发工程接收证书",{"key":31,"text":656,"correct":26},"竣工验收不合格，承包人在完成不合格工程的返工重作或补救工作后，应重新提交竣工验收申请报告",{"key":34,"text":658,"correct":22},"发包人在收到承包人竣工验收申请报告56天后未进行验收，视为验收不合格",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":395,"analysis":37},1101805,"发包人逾期不支付工程价款时，关于建设工程价款优先受偿权的说法正确的是（ ）。",[663,665,667,669,671],{"key":20,"text":664,"correct":22},"工程质量合格但尚未竣工，不得主张该权利",{"key":24,"text":666,"correct":26},"实际施工人.分包人不得主张该权利",{"key":28,"text":668,"correct":22},"就逾期支付建设工程价款的利息.违约金.损害赔偿金等主张优先受偿的，人民法院应予支持",{"key":31,"text":670,"correct":26},"该权利行使期限为6个月",{"key":34,"text":672,"correct":22},"行使期限自工程竣工之日起算",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":687,"analysis":37},1101806,"仅给予承包人工期和费用补偿而不补偿利润的事件有（ ）。",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"延误移交施工现场",{"key":24,"text":680,"correct":26},"不可预见的外界条件",{"key":28,"text":682,"correct":26},"施工遇到文物和古迹",{"key":31,"text":684,"correct":22},"后续法规的调整",{"key":34,"text":686,"correct":22},"不可抗力事件造成的损害","BC",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":701,"analysis":37},1101807,"对于承包商提出的索赔，可能同时给予补偿工期、费用和利润的情况有（ ）。",[692,694,696,697,699],{"key":20,"text":693,"correct":26},"对竣工检验的干扰",{"key":24,"text":695,"correct":22},"不可抗力造成的损失",{"key":28,"text":678,"correct":26},{"key":31,"text":698,"correct":26},"非承包商原因检验导致施工延误",{"key":34,"text":700,"correct":26},"业主提前占用工程","ACDE",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":325,"analysis":37},1101808,"施工合同履行中，关于承包人的索赔管理，说法正确的是（ ）。",[706,708,710,712,714],{"key":20,"text":707,"correct":26},"承包人应在引起索赔事件发生后28天内，向监理人递交索赔意向通知书",{"key":24,"text":709,"correct":22},"监理人应在收到索赔意向通知书后的42天内，将索赔处理结果答复承包人",{"key":28,"text":711,"correct":26},"监理人应争取通过与发包人和承包人协商达成索赔处理的一致意见",{"key":31,"text":713,"correct":22},"承包人应接受索赔处理结果，因为监理人处理索赔的决定具有强制约束力",{"key":34,"text":715,"correct":26},"发包人应在做出索赔处理结果答复后28天内完成赔付",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":395,"analysis":37},1101809,"下列在施工过程中因不可抗力事件导致的损失，应由承包人承担的有（ ）。",[720,722,724,726,728],{"key":20,"text":721,"correct":22},"施工现场待安装的设备损坏",{"key":24,"text":723,"correct":26},"承包人的人员伤亡",{"key":28,"text":725,"correct":22},"工程损害造成的第三方人员伤亡",{"key":31,"text":727,"correct":26},"承包人设备的停工损失",{"key":34,"text":729,"correct":22},"停工期间，承包人留在现场保卫人员的费用",[731,735,738,741,744,747],{"id":732,"name":733,"category":7,"favorite":734},1,"领导干部任职前廉政法规知识测试题",92,{"id":736,"name":737,"category":7,"favorite":732},595,"建筑结构与设备",{"id":739,"name":740,"category":7,"favorite":732},715,"招标采购专业知识与法律法规",{"id":742,"name":743,"category":7,"favorite":732},848,"市政方向-通用基础",{"id":745,"name":746,"category":7,"favorite":8},534,"BIM工程师",{"id":748,"name":746,"category":7,"favorite":8},535]