[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,3,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,247,259,267,279,291,303,311,323,335,347,359,371,383,395,406,418,430,442,453,465,477,489,501,509,521,533,545,557,569,581,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1100142,1,"单选题","某钢筋分项工程的施工具备隐蔽条件，经工程师检查认可后承包人继续施工。后工程师又发出重新剥露检查的指示，承包人执行了该指示。重新检验表明该分项工程存在质量缺陷，承包人修复后再次隐蔽。下列关于承包人的经济损失和工期延误的责任承担的说法中，正确的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工期和经济损失均由承包人承担",true,{"key":24,"text":25,"correct":26},"B","给予经济损失补偿，不顺延合同工期",false,{"key":28,"text":29,"correct":26},"C","顺延合同工期，不补偿经济损失",{"key":31,"text":32,"correct":26},"D","补偿经济损失并顺延合同工期","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1100143,"某施工合同履行过程中，隐蔽的工程隐蔽前未通知监理工程师到场检查，后监理工程师要求剥露重新检验。重新检验的结果表明质量合格，则下列关于损失承担的表述中，正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":26},"发包人支付发生的全部费用，工期不予顺延",{"key":24,"text":41,"correct":26},"发包人支付发生的全部费用，工期给予顺延",{"key":28,"text":43,"correct":26},"承包人承担发生的全部费用，工期给予顺延",{"key":31,"text":45,"correct":22},"承包人承担发生的全部费用，工期不予顺延",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1100144,"某施工合同约定钢材由发包人供应，但钢材到货时发包人与监理工程师都没有通知承包人验收，供应商就将钢材卸货于施工现场。在使用前发现钢材数量出现较大短缺，这一钢材损失应由( )承担。",[50,52,54,56],{"key":20,"text":51,"correct":26},"承包人",{"key":24,"text":53,"correct":26},"钢材供应商",{"key":28,"text":55,"correct":26},"监理单位",{"key":31,"text":57,"correct":22},"发包人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1100145,"根据《施工合同标准文本》的规定，在工程量的计量中，总价子目结算通常( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"不进行现场计量，只进行图纸计量",{"key":24,"text":65,"correct":26},"进行现场计量，不进行图纸计量",{"key":28,"text":67,"correct":26},"现场计量和图纸计量必须均进行",{"key":31,"text":69,"correct":26},"无须进行现场计量和图纸计量",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1100146,"如发生了导致承包人增加开支的事件，但却是属于发包人也无法合理预见和克服的情况，则( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"同时补偿费用和利润",{"key":24,"text":77,"correct":26},"费用和利润均不补偿",{"key":28,"text":79,"correct":22},"可以补偿费用但不能补偿利润",{"key":31,"text":81,"correct":26},"可以补偿利润但不能补偿费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1100147,"根据《标准施工合同》，关于签约合同价总金额的说法，正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":26},"只包括暂列金额，不包括暂估价",{"key":24,"text":89,"correct":26},"既不包括暂列金额，也不包括暂估价",{"key":28,"text":91,"correct":26},"不包括暂列金额，只包括暂估价",{"key":31,"text":93,"correct":22},"既包括暂列金额，也包括暂估价",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1100148,"根据《标准施工合同》，关于暂估价的说法，错误的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":26},"暂估价是签约合同价的组成部分",{"key":24,"text":101,"correct":22},"暂估价内的专业工程不一定实施",{"key":28,"text":103,"correct":26},"暂估价的内容在投标时难以确定准确价格",{"key":31,"text":105,"correct":26},"暂估价的内容不包括计日工",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1100149,"根据《标准施工合同》，关于承包人施工安全责任的说法，正确的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"承包人应按合同约定的安全工作内容编制施工安全措施计划",{"key":24,"text":113,"correct":26},"合同约定的安全施工措施所需费用由承包人承担，安全作业环境所需费用由发包人承担",{"key":28,"text":115,"correct":26},"承包人对施工现场所有人员的工伤事故承担责任",{"key":31,"text":117,"correct":26},"因采取合同未约定的安全施工措施增加的费用由承包人自行承担",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1100150,"根据《标准施工合同》，不属于施工合同履行中“不利物质条件”的是( )。",[122,124,126,128],{"key":20,"text":123,"correct":26},"不利地质条件",{"key":24,"text":125,"correct":26},"不利水文条件",{"key":28,"text":127,"correct":26},"有毒作业环境",{"key":31,"text":129,"correct":22},"不利气候条件",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1100151,"下列情形中，不属于施工中不利物质条件的是( )。",[134,136,138,140],{"key":20,"text":135,"correct":26},"污染物",{"key":24,"text":137,"correct":22},"不利于施工的气候条件",{"key":28,"text":139,"correct":26},"非自然的物质障碍",{"key":31,"text":141,"correct":26},"不可预见的自然物质条件",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1100152,"施工过程中发生变更，而合同中没有适用或类似工程的单价，应( )。",[146,148,150,152],{"key":20,"text":147,"correct":26},"由发包人提出适当的变更工作单价并执行",{"key":24,"text":149,"correct":26},"由承包人提出适当的变更工作单价，经监理人确认后执行",{"key":28,"text":151,"correct":22},"由监理人商定或确定变更工作单价并执行",{"key":31,"text":153,"correct":26},"由工程造价管理机构提出变更工作单价并执行",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1100153,"根据标准施工合同通用条款的规定，下列不属于变更范围的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":26},"取消合同中的任何一项工作，但被取消的工作不能由发包人或其他人实施",{"key":24,"text":161,"correct":26},"改变合同中任何一项工作的质量或其他特性",{"key":28,"text":163,"correct":26},"改变合同中的基线、标高、位置或尺寸",{"key":31,"text":165,"correct":22},"承包人擅自完成施工图之外的工作",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1100154,"标准施工合同通用条款规定的变更范围不包括( )。",[170,172,173,175],{"key":20,"text":171,"correct":22},"取消合同中任何一项工作",{"key":24,"text":161,"correct":26},{"key":28,"text":174,"correct":26},"改变合同工程的基线、标高、位置或尺寸",{"key":31,"text":176,"correct":26},"改变合同中任何一项工作的施工时间或改变已批准的施工工艺或顺序",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":28,"analysis":33},1100155,"施工合同履行过程中，因工程所在地发生洪灾所造成的损失中，应由承包人承担的是（）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"工程本身的损害",{"key":24,"text":184,"correct":26},"工程所需清理费用",{"key":28,"text":186,"correct":22},"承包人的施工机械损坏",{"key":31,"text":188,"correct":26},"因工程损害导致的第三方财产损失",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1100156,"根据《标准设计施工总承包合同》，工程实施中应给予承包人延长工期、增加费用并支付合理利润的情形是( )。",[193,195,197,199],{"key":20,"text":194,"correct":26},"不可抗力不能按期竣工",{"key":24,"text":196,"correct":22},"监理人的指示错误",{"key":28,"text":198,"correct":26},"不可预见的物质条件",{"key":31,"text":200,"correct":26},"异常恶劣的气候条件",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},1100157,"根据《标准施工合同》，承包人向监理人递交索赔意向书的时效是( )天。",[205,207,209,211],{"key":20,"text":206,"correct":26},"7",{"key":24,"text":208,"correct":26},"14",{"key":28,"text":210,"correct":22},"28",{"key":31,"text":212,"correct":26},"30",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1100158,"如果索赔事件的影响持续存在，承包商应在该项索赔事件( )，提出最终索赔通知书，说明最终要求索赔的追加付款金额和延长的工期，并附必要的记录和证明材料。",[217,219,221,223],{"key":20,"text":218,"correct":26},"发生后的28天内",{"key":24,"text":220,"correct":26},"全部消除后",{"key":28,"text":222,"correct":26},"影响结束后的14天内",{"key":31,"text":224,"correct":22},"影响结束后的28天内",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1100160,"根据《标准施工合同》，不可抗力停工期间的照管和后续清理，承包商可索赔( )。",[229,231,233,235],{"key":20,"text":230,"correct":26},"工期和费用",{"key":24,"text":232,"correct":26},"费用和利润",{"key":28,"text":234,"correct":22},"费用",{"key":31,"text":236,"correct":26},"工期",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1100161,"在合同履行过程中，承包人违反合同规定，监理人发出整改通知( )天后，承包人仍不纠正违约行为，发包人可以向承包人发出解除合同通知。",[241,243,244,245],{"key":20,"text":242,"correct":26},"1",{"key":24,"text":208,"correct":26},{"key":28,"text":210,"correct":22},{"key":31,"text":246,"correct":26},"56",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1100162,"工程竣工验收未能通过，经过承包人修正缺陷再次验收检验合格。这种情况下，计算承包人的实际竣工日期应为( )。",[251,253,255,257],{"key":20,"text":252,"correct":26},"承包人第一次提交竣工验收报告之日",{"key":24,"text":254,"correct":22},"承包人修改后再次提交竣工验收报告之日",{"key":28,"text":256,"correct":26},"再次验收检验合格之日",{"key":31,"text":258,"correct":26},"办理竣工验收手续之日",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1100163,"竣工验收合格，监理人应在收到竣工验收申请报告后的( )天内，向承包人出具经发包人签认的工程接收证书。",[263,264,265,266],{"key":20,"text":206,"correct":26},{"key":24,"text":208,"correct":26},{"key":28,"text":210,"correct":26},{"key":31,"text":246,"correct":22},{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},1100164,"根据《施工合同标准文本》的规定，单位工程经验收合格后，由()向承包人出具经( )签认的单位工程验收证书。",[271,273,275,277],{"key":20,"text":272,"correct":22},"监理人、发包人",{"key":24,"text":274,"correct":26},"发包人、监理人",{"key":28,"text":276,"correct":26},"监理人、工程质量监督机构",{"key":31,"text":278,"correct":26},"发包人、工程质量监督机构",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1100165,"下列关于单位工程竣工验收的说法，不正确的是( )。",[283,285,287,289],{"key":20,"text":284,"correct":26},"单位工程验收合格后，由监理人向承包人出具经发包人签认的单位工程验收证书",{"key":24,"text":286,"correct":26},"单位工程的验收成果和结论作为全部工程竣工验收申请报告的附件",{"key":28,"text":288,"correct":26},"移交后的单位工程由发包人负责照管",{"key":31,"text":290,"correct":22},"合同约定了单位工程分部移交，如果发包人在全部工程竣工前，使用已接收的单位工程运行影响了承包人的后续施工，发包人应承担由此增加的费用和(或)工期延误，并支付承包人合理利润",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1100166,"承包人向监理人报送竣工验收申请报告，不需要具备的条件是( )。",[295,297,299,301],{"key":20,"text":296,"correct":26},"已按合同约定的内容和份数备齐了符合要求的竣工资料",{"key":24,"text":298,"correct":26},"已按监理人的要求编制了在缺陷责任期内完成的尾工(甩项)工程和缺陷修补工作清单以及相应施工计划",{"key":28,"text":300,"correct":26},"合同要求的试验、试运行以及检验和验收均已完成，并符合合同要求",{"key":31,"text":302,"correct":22},"完成了缺陷责任期内的尾工(甩项)工程和缺陷修补工作",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1100167,"发包人在收到承包人竣工验收申请报告( )天后未进行验收，视为验收合格。实际竣工日期以提交竣工验收申请报告的日期为准。",[307,308,309,310],{"key":20,"text":206,"correct":26},{"key":24,"text":208,"correct":26},{"key":28,"text":210,"correct":26},{"key":31,"text":246,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":28,"analysis":33},1100168,"某建设工程项目，承包人于5月1日向监理人提请竣工验收申请报告，监理人认为工程尚不具备竣工验收条件，与5月14日通知承包人整改。承包人完成监理人通知的全部工作内容后，与6月1日再次提交竣工验收申请报告，监理人审查后认为已具备竣工验收条件，6月10日提请发包人进行工程验收，6月20日验收合格。则实际竣工日期是( )。",[315,317,319,321],{"key":20,"text":316,"correct":26},"5月1日",{"key":24,"text":318,"correct":26},"5月14日",{"key":28,"text":320,"correct":22},"6月1日",{"key":31,"text":322,"correct":26},"6月10日",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":31,"analysis":33},1100169,"根据《建设工程施工合同(示范文本)》，( )表明合同终止。",[327,329,331,333],{"key":20,"text":328,"correct":26},"竣工验收合格",{"key":24,"text":330,"correct":26},"工程移交",{"key":28,"text":332,"correct":26},"竣工结算",{"key":31,"text":334,"correct":22},"结清单生效",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},1100170,"根据《施工合同标准文本》的规定，合同工期为( )。",[339,341,343,345],{"key":20,"text":340,"correct":26},"合同内约定的工期",{"key":24,"text":342,"correct":26},"发出开工通知的日期至竣工验收的工期",{"key":28,"text":344,"correct":26},"合同基准日至竣工验收的工期",{"key":31,"text":346,"correct":22},"合同内约定的工期与变更索赔顺延的工期之和",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},1100171,"某施工合同约定承包工程应于10月20日竣工。9月中旬发现，因承包人的施工管理不严格，导致实际进度滞后于计划进度。承包人按工程师要求修改了进度计划，竣工日期推迟到10月30日。该进度计划得到工程师的确认，则( )。",[351,353,355,357],{"key":20,"text":352,"correct":26},"如果通过赶工在10月20日竣工，可获提前竣工奖励",{"key":24,"text":354,"correct":22},"如果通过赶工在10月20日竣工，不能获提前竣工奖励",{"key":28,"text":356,"correct":26},"如果在10月25日竣工，既不获得奖励，也不承担拖期赔偿责任",{"key":31,"text":358,"correct":26},"如果在10月30日竣工，不需承担拖期赔偿责任",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1100172,"某施工合同协议书内注明的开工日期为2013年2月1日。承包人因主要施工机械未到场向工程师递交了延期开工1周的申请，但未获得工程师批准。工程实际在2013年2月5日开始动工。2013年12月5日，承包人在自检合格后提交了竣工验收报告，工程于2013年12月20日通过了竣工验收。按照《建设工程施工合同(示范文本)》的规定，承包人的施工期应为( )。",[363,365,367,369],{"key":20,"text":364,"correct":22},"自2月1日始，至12月5日止",{"key":24,"text":366,"correct":26},"自2月1日始，至12月20日止",{"key":28,"text":368,"correct":26},"自2月5日始，至12月5日止",{"key":31,"text":370,"correct":26},"自2月5日始，至12月20日止",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},1100174,"承包人的施工期从( )起算。",[375,377,379,381],{"key":20,"text":376,"correct":22},"监理人发出的开工通知中写明的开工日",{"key":24,"text":378,"correct":26},"办理征地拆迁",{"key":28,"text":380,"correct":26},"施工合同签订之日",{"key":31,"text":382,"correct":26},"工程接收证书中写明的竣工日开始",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":20,"analysis":33},1100175,"按照建设工程施工合同示范文本的规定，承包人的施工期应为( )。",[387,389,391,393],{"key":20,"text":388,"correct":22},"监理人开工通知写明的开工日至实际竣工日",{"key":24,"text":390,"correct":26},"承包人实际开工日至实际竣工日",{"key":28,"text":392,"correct":26},"监理人开工通知写明的开工日至验收合格日",{"key":31,"text":394,"correct":26},"承包人实际开工日至验收合格日",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1100176,"缺陷责任期从( )起算。",[399,401,403,405],{"key":20,"text":400,"correct":26},"投标函中写明的竣工日开始",{"key":24,"text":402,"correct":26},"开工通知中写明的开工日开始",{"key":28,"text":404,"correct":26},"投标函中写明的开工日开始",{"key":31,"text":382,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1100177,"某建设工程项目，约定缺陷责任期为1年，建设工程中竣工验收前2013年5月1日进行了土建单位工程验收，2013年8月1日进行了竣工验收，则关于缺陷责任期说法正确的是( )。",[410,412,414,416],{"key":20,"text":411,"correct":22},"2014年4月30日结束?土建单位工程缺陷责任期从2013年5月1日开始，",{"key":24,"text":413,"correct":26},"2014年7月30日结束?土建单位工程缺陷责任期从2013年8月1日开始，",{"key":28,"text":415,"correct":26},"2014年7月30日结束?土建单位工程缺陷责任期从2013年5月1日开始，",{"key":31,"text":417,"correct":26},"2014年4月30日结束?土建单位工程缺陷责任期从2013年8月1日开始，",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},1100178,"承包人未能按照合同计划完成工作时，监理人要求采取措施加快进度，此时承包人( )。",[422,424,426,428],{"key":20,"text":423,"correct":26},"可以拒绝执行",{"key":24,"text":425,"correct":26},"应当执行，但可获得费用补偿",{"key":28,"text":427,"correct":26},"应当执行，但可获得费用和利润的补偿",{"key":31,"text":429,"correct":22},"应当执行，不能获得补偿",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1100179,"监理人要求的暂停施工的赔偿与责任的说法错误的是( )。",[434,436,438,440],{"key":20,"text":435,"correct":26},"停工责任在发包人，由发包人承担所发生的追加合同价款，赔偿承包商由此造成的损失，相应顺延工期",{"key":24,"text":437,"correct":26},"停工责任在承包人，由承包人承担发生的费用，工期不予顺延",{"key":28,"text":439,"correct":26},"暂停施工期间，承包人负责妥善保护工程并提供安全保障",{"key":31,"text":441,"correct":22},"停工责任在承包人，由承包人承担发生的费用，相应顺延工期",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1100180,"为了保证实际施工过程中承包人能够按计划施工，( )通过协调保障承包人的施工不受到外部或其他承包人的干扰，对已确定的施工计划要进行动态管理。",[446,448,449,451],{"key":20,"text":447,"correct":22},"监理人",{"key":24,"text":57,"correct":26},{"key":28,"text":450,"correct":26},"总包单位",{"key":31,"text":452,"correct":26},"设计单位",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1100181,"由于发包人的原因发生暂停施工的紧急情况，且监理人未及时下达暂停施工指示，承包人可先暂停施工并及时向监理人提出暂停施工的书面请求。监理人应在接到书面请求后的( )h内予以答复，逾期未答复视为同意承包人的暂停施工请求。",[457,459,461,463],{"key":20,"text":458,"correct":26},"12",{"key":24,"text":460,"correct":22},"24",{"key":28,"text":462,"correct":26},"36",{"key":31,"text":464,"correct":26},"48",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},1100183,"下列不属于发包人的责任引起暂停施工情况的是( )。",[469,471,473,475],{"key":20,"text":470,"correct":26},"发包人未履行合同规定的义务",{"key":24,"text":472,"correct":26},"不可抗力",{"key":28,"text":474,"correct":26},"协调管理原因",{"key":31,"text":476,"correct":22},"季节性大雨引起的停工",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1100184,"在合同履行过程中，由于发包人提供的图纸设计错误，导致承包人施工放线返工，则应（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":26},"仅补偿承包人费用，不补偿利润",{"key":24,"text":484,"correct":26},"既不补偿承包人费用，也不补偿利润",{"key":28,"text":486,"correct":22},"既补偿承包人费用，又补偿利润",{"key":31,"text":488,"correct":26},"仅补偿利润部分，不补偿承包人费用",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1100189,"某工程施工合同约定的工期为20个月，专用条款规定承包人提前竣工或延误竣工均按月计算奖金或延误损害赔偿金。施工至第16个月，因承包人原因导致实际进度滞后于计划进度。承包人修改后的进度计划的竣工时间为第22个月，监理人认可了该进度计划的修改。承包人的实际施工期为21个月。下列关于承包人的工期责任的说法中，正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":26},"提前工期1个月给予承包人奖励",{"key":24,"text":496,"correct":22},"延误工期1个月追究承包人拖期违约责任",{"key":28,"text":498,"correct":26},"对承包人既不追究拖期违约责任，也不给予奖励",{"key":31,"text":500,"correct":26},"因监理人对修改进度计划的认可，按延误工期0．5个月追究承包人违约责任",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1100193,"根据《标准施工合同》，不属于施工合同履行中“不利物质条件”的是（ ）。",[505,506,507,508],{"key":20,"text":123,"correct":26},{"key":24,"text":129,"correct":22},{"key":28,"text":139,"correct":26},{"key":31,"text":125,"correct":26},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},1100194,"关于结清单生效的表述中，不正确的是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":26},"承包人收到发包人最终支付款后结清单生效",{"key":24,"text":516,"correct":26},"结清单生效即表明合同终止",{"key":28,"text":518,"correct":22},"结清单生效后承包人仍拥有索赔的权利",{"key":31,"text":520,"correct":26},"如果发包人未按时支付结清款，承包人仍可就此事项进行索赔",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1100195,"施工阶段承包人按合同约定完成了包括缺陷责任期内的全部承包工作后，发包人应付给承包人的金额称为（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":26},"暂列金额",{"key":24,"text":528,"correct":22},"合同价格",{"key":28,"text":530,"correct":26},"估算价",{"key":31,"text":532,"correct":26},"质量保证金",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1100197,"在施工索赔中，监理人作出的处理索赔的决定（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"承包人必须接受",{"key":24,"text":540,"correct":22},"承包人可以不接受",{"key":28,"text":542,"correct":26},"仲裁机构应予以认可",{"key":31,"text":544,"correct":26},"排除了法院的诉讼管辖",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1100198,"根据《标准施工合同》，工程实际竣工日，为（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"承包人提交竣工验收申请报告之日",{"key":24,"text":552,"correct":26},"监理人审查合格竣工验收申报报告之日",{"key":28,"text":554,"correct":26},"发包人组织进行验收之日",{"key":31,"text":556,"correct":26},"工程接收证书颁发日",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1100201,"施工中遇到异常恶劣的气候条件造成的停工属于（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"可给予工期补偿",{"key":24,"text":564,"correct":26},"可给予费用补偿",{"key":28,"text":566,"correct":26},"承包人应承担的风险责任",{"key":31,"text":568,"correct":26},"可以补偿工期、费用补偿",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},1100206,"根据《施工合同标准文本》的规定，因承包人违约而解除合同，发包人的行为错误的是()。",[573,575,577,579],{"key":20,"text":574,"correct":26},"发包人可派人员进驻施工场地，另行组织人员或委托其他承包人施工",{"key":24,"text":576,"correct":26},"发包人有权扣留使用承包人在现场的材料、设备和临时设施",{"key":28,"text":578,"correct":22},"发包人扣留使用承包人在现场的材料设备，则发包人不能再享有索赔的权利",{"key":31,"text":580,"correct":26},"发包人有权要求承包人将其为实施合同而签订的材料和设备的订货合同或任何服务协议转让给发包人",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},1100208,"施工合同中，不可预见物质条件的风险由发包人承担，承包人遇到不可预见物质条件时，及时通知了监理人，监理人没有发出指示，承包人因采取合理措施而增加的费用和工期延误，由( )承担。",[585,586,587,588],{"key":20,"text":57,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":447,"correct":26},{"key":31,"text":589,"correct":26},"发包人和承包人",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1100209,"施工阶段承包人收到监理人按合同约定发出的图纸和文件，经检查认为其中存在属于变更范围的情形，如提高了工程质量标准、增加工作内容、工程的位置或尺寸发生变化等，可向（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":26},"设计人提出书面变更建议",{"key":24,"text":597,"correct":22},"监理人提出书面变更建议",{"key":28,"text":599,"correct":26},"监理人提出口头变更建议",{"key":31,"text":601,"correct":26},"设计人提出口头变更建议",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]