[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":715},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,29,50,2250,[13,38,52,67,82,96,108,122,135,148,163,178,193,208,223,238,253,268,282,297,312,326,341,355,369,383,394,409,422,436,449,463,478,492,507,521,536,547,559,573,588,600,609,623,632,646,660,673,687,701],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1101685,2,"多选题","建设工程勘察合同中，发包人义务包括（）",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","发出开始勘察通知",true,{"key":24,"text":25,"correct":22},"B","向勘察人提供勘察资料",{"key":27,"text":28,"correct":22},"C","办理证件和批件",{"key":30,"text":31,"correct":32},"D","保证勘察作业规范、安全和环保",false,{"key":34,"text":35,"correct":32},"E","避免勘探对公众与他人的利益造成损害","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1101686,"建设工程勘察合同履行管理中，关于合同价格与支付说法正确的有（）",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"勘察费用实行发包人签证制度",{"key":24,"text":45,"correct":22},"勘察合同的价款确定方式、调整方式和风险范围划分，在专用合同条款中约定",{"key":27,"text":47,"correct":22},"定金或预付款的额度、支付方式及抵扣方式在专用合同条款中约定",{"key":30,"text":49,"correct":32},"发包人应在收到定金或预付款支付申请后14天内，将定金或预付款支付给勘察人",{"key":34,"text":51,"correct":32},"发包人要求勘察人进行外出考察、试验检测、专项咨询或专家评审时，相应费用包含在合同价格之中",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1101687,"勘察人应当根据（），选用合适的原位测试方法和勘察设备进行原位测试。",[56,58,60,62,64],{"key":20,"text":57,"correct":32},"架空线",{"key":24,"text":59,"correct":22},"岩土条件",{"key":27,"text":61,"correct":22},"设计要求",{"key":30,"text":63,"correct":22},"勘察经验",{"key":34,"text":65,"correct":22},"测试方法特点","BCDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1101688,"下列关于建设工程勘察合同内容的说法，错误的有（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"发包人应对提供文件资料的准确性负责",{"key":24,"text":74,"correct":22},"对工程的勘察许可应由勘察人提供",{"key":27,"text":76,"correct":32},"勘察工作范围地下已有埋藏物的资料应由发包人提供",{"key":30,"text":78,"correct":32},"发包人应修好通行道路方便勘察人工作",{"key":34,"text":80,"correct":22},"拆除地下障碍物应由承包人完成","BE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":95,"analysis":37},1101689,"根据建设工程设计合同示范文本的规定，发包人的义务包括（）。",[86,88,90,91,93],{"key":20,"text":87,"correct":22},"遵守法律",{"key":24,"text":89,"correct":22},"发出开始设计通知",{"key":27,"text":28,"correct":22},{"key":30,"text":92,"correct":32},"对外商的设计资料的审查",{"key":34,"text":94,"correct":22},"支付合同价款","ABCE",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":107,"analysis":37},1101690,"关于建设工程勘察合同内容的说法，正确的有（）。",[100,102,103,104,106],{"key":20,"text":101,"correct":32},"勘察人需对发包人提供的文件资料进行核查，并对其准确性负责",{"key":24,"text":74,"correct":32},{"key":27,"text":76,"correct":22},{"key":30,"text":105,"correct":22},"建筑总平面布置图由发包人提供",{"key":34,"text":80,"correct":32},"CD",{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":66,"analysis":37},1101692,"(2010年真题)根据建设工程勘察合同示范文本的规定，发包人配合勘察人开展勘察工作的义务包括（ ）。",[112,114,116,118,120],{"key":20,"text":113,"correct":32},"办理施工许可证",{"key":24,"text":115,"correct":22},"拆除地下障碍物",{"key":27,"text":117,"correct":22},"平整施工现场",{"key":30,"text":119,"correct":22},"挖好排水沟渠",{"key":34,"text":121,"correct":22},"接通水源电源",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":134,"analysis":37},1101693,"(2014年真题)关于建设工程勘察合同内容的说法，正确的有（ ）。",[126,128,129,130,132],{"key":20,"text":127,"correct":22},"发包人应在开始勘察前7日内，向勘察人提供测量基准点、水准点和书面资料",{"key":24,"text":74,"correct":32},{"key":27,"text":76,"correct":22},{"key":30,"text":131,"correct":22},"拆除地上障碍物应由发包人完成",{"key":34,"text":133,"correct":32},"勘察服务完成之前，由于不可抗力原因解除合同时，定金应当退还","ACD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":36,"analysis":37},1101694,"(2017年真题)根据项目的具体情况，建设工程勘察合同双方可以在合同内约定由发包人负责保证勘察工作顺利开展应提供的条件，可能包括（ ）。",[139,141,143,144,146],{"key":20,"text":140,"correct":22},"落实土地征用、青苗树木赔偿",{"key":24,"text":142,"correct":22},"拆除地上地下障碍物",{"key":27,"text":117,"correct":22},{"key":30,"text":145,"correct":32},"处理有关设计问题",{"key":34,"text":147,"correct":32},"向施工承包人进行设计交底",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":162,"analysis":37},1101695,"（2020年真题）根据《标准勘察招标文件》中的通用合同条款，勘察人应履行的安全职责有（ ）。",[152,154,156,158,160],{"key":20,"text":153,"correct":32},"发生事故的，勘察人应立即通知发包人",{"key":24,"text":155,"correct":32},"按合同要求制定勘查工作临时占地方案",{"key":27,"text":157,"correct":22},"按合同约定编制安全措施计划和灾害应急预案",{"key":30,"text":159,"correct":22},"严格按国家安全标准制定施工安全操作规程",{"key":34,"text":161,"correct":22},"配置必要的救助物资和器材","CDE",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":177,"analysis":37},1101696,"（2020年真题）根据《标准勘察招标文件》和《标准设计招标文件》中的通用合同条款，勘察和设计合同价格应包括的内容有（ ）",[167,169,171,173,175],{"key":20,"text":168,"correct":22},"收集资料、踏勘现场并进行勘察设计工作的费用",{"key":24,"text":170,"correct":32},"工程施工期间配合及现场服务的费用",{"key":27,"text":172,"correct":22},"工程勘察和设计服务应繳纳的增值税税金",{"key":30,"text":174,"correct":32},"发包人要求勘察人和设计人进行专项试验检测的费用",{"key":34,"text":176,"correct":32},"发包人未按期支付费用导致的逾期付款违约金","AC",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":192,"analysis":37},1101697,"（2020年真题）根据《标准设计招标文件》中的通用合同条款，属于发包人违约的情形有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":32},"因发生不可抗力事件导致设计工作严重受阻",{"key":24,"text":185,"correct":22},"设计人在合同约定的时间内未能获得发包人按合同约定应支付的设计费用",{"key":27,"text":187,"correct":22},"发包人未按合同约定对设计人提出的确认事项进行答复导致设计滞后",{"key":30,"text":189,"correct":32},"设计文件标注的质量标准不符合工程建设强制性标准规定",{"key":34,"text":191,"correct":32},"设计人所提供设计文件的设计深度不符合设计合同约定","BC",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":207,"analysis":37},1101698,"根据《标准施工招标文件》，标准施工合同附件的格式文件包括( )。",[197,199,201,203,205],{"key":20,"text":198,"correct":22},"合同协议书",{"key":24,"text":200,"correct":32},"通用条款",{"key":27,"text":202,"correct":32},"专用条款",{"key":30,"text":204,"correct":22},"履约保函",{"key":34,"text":206,"correct":22},"预付款保函","ADE",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":222,"analysis":37},1101699,"下列关于合同附件格式，说法正确的有( )。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"合同附件格式包括合同协议书、履约保函和预付款保函",{"key":24,"text":215,"correct":22},"合同协议书中包括了签约合同价",{"key":27,"text":217,"correct":22},"预付款担保期限自预付款支付给承包人起生效",{"key":30,"text":219,"correct":22},"履约保函担保方式采用无条件担保",{"key":34,"text":221,"correct":32},"预付款担保采用有条件担保","ABCD",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":37},1101700,"根据《标准施工合同》，合同协议书中需要明确填写的内容有( )。",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"签约合同价",{"key":24,"text":230,"correct":22},"合同工期",{"key":27,"text":232,"correct":32},"争议的解决",{"key":30,"text":234,"correct":22},"质量标准",{"key":34,"text":236,"correct":22},"项目经理人选","ABDE",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":252,"analysis":37},1101701,"根据《标准施工合同》，履约担保的特点有( )。",[242,244,246,248,250],{"key":20,"text":243,"correct":22},"担保期限自合同签订日起到签发工程移交证书日止",{"key":24,"text":245,"correct":22},"采用无条件担保方式",{"key":27,"text":247,"correct":32},"能快速解决承包方严重违约对施工的影响",{"key":30,"text":249,"correct":22},"能降低发包人合同风险",{"key":34,"text":251,"correct":32},"有助于加强发包人的履约责任心","ABD",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":267,"analysis":37},1101702,"根据《标准施工合同》，履约担保和预付款担保的主要区别有( )。",[257,259,261,263,265],{"key":20,"text":258,"correct":32},"担保的方式不同",{"key":24,"text":260,"correct":22},"担保的金额不同",{"key":27,"text":262,"correct":22},"担保的期限不同",{"key":30,"text":264,"correct":22},"担保的作用不同",{"key":34,"text":266,"correct":32},"被担保的主体不同","BCD",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":81,"analysis":37},1101703,"由于通用条款的内容涵盖各类工程项目施工共性的（ ），各行业可以结合工程项目施工的行业特点编制标准施工合同文本在专用条款内体现，具体招标工程在编制合同时，应针对项目的特点、招标人的要求，在专用条款内针对通用条款涉及的内容进行补充、细化。",[272,274,276,278,280],{"key":20,"text":273,"correct":32},"一般约定",{"key":24,"text":275,"correct":22},"合同责任",{"key":27,"text":277,"correct":32},"缺陷责任与保修责任",{"key":30,"text":279,"correct":32},"变更",{"key":34,"text":281,"correct":22},"履行管理程序",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":296,"analysis":37},1101709,"9部委于2007年联合颁发了《标准施工招标文件》，其中包括施工合同标准文本，关于该标准文本的说法正确的是（）。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"标准施工合同提供了通用条款.专用条款和签订合同时采用的合同附件格式",{"key":24,"text":289,"correct":32},"标准施工合同提供的合同附件格式包括合同协议书.履约保函.预付款保函.技术文件等四个文件",{"key":27,"text":291,"correct":32},"履约保函的担保期限自发包人和承包人签订合同之日起，至缺陷责任期满止",{"key":30,"text":293,"correct":22},"预付款保函的担保期限自预付款支付给承包人起，至发包人签发的进度付款证书说明已完全扣清预付款止",{"key":34,"text":295,"correct":32},"履约保函采用无条件担保方式，预付款保函采用附条件担保方式","AD",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},1101710,"根据建设工程施工合同的有关规定，施工合同的当事人包括( )。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"发包人",{"key":24,"text":304,"correct":22},"承包人",{"key":27,"text":306,"correct":32},"监理人",{"key":30,"text":308,"correct":32},"建设主管部门",{"key":34,"text":310,"correct":32},"设计人","AB",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":222,"analysis":37},1101711,"下列关于监理人的说法正确的有( )。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"受发包人委托对施工合同的履行进行管理",{"key":24,"text":319,"correct":22},"居于施工合同履行管理的核心地位",{"key":27,"text":321,"correct":22},"监理人对承包人的指示，承包人应遵照执行",{"key":30,"text":323,"correct":22},"在发包人授权的范围内，负责施工质量和进度监督的工作",{"key":34,"text":325,"correct":32},"如果监理人的指示错误给承包人带来损失的，由监理人负责赔偿",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":340,"analysis":37},1101712,"根据《标准施工合同》，关于监理人的地位和职责的说法，正确的有( )。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"监理人是受发包人聘请的合同履行管理人",{"key":24,"text":333,"correct":32},"监理人是施工合同履行中独立的第三方",{"key":27,"text":335,"correct":22},"监理人在授权范围内独立开展工作",{"key":30,"text":337,"correct":32},"监理人具有施工合同管理所有事项的决定权",{"key":34,"text":339,"correct":22},"监理人有对承包人进行施工管理的指示权","ACE",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":81,"analysis":37},1101713,"根据《标准施工招标文件》的施工合同文本通用合同条款，监理人的主要职责有（）。",[345,347,349,351,353],{"key":20,"text":346,"correct":32},"独立处理单价的合理调整、索赔批准",{"key":24,"text":348,"correct":22},"在发包人授权范围内，负责发出指示、检查施工质量、控制进度等现场管理工作",{"key":27,"text":350,"correct":32},"依据工程实际情况作出指示，免除或变更承包人的部分义务",{"key":30,"text":352,"correct":32},"决定发包人与承包人有关合同争议的处理",{"key":34,"text":354,"correct":22},"按照合同约定，公平合理地处理合同履行过程中涉及的有关事项",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":222,"analysis":37},1101714,"按照标准施工合同通用条款对监理人的相关规定，总监理工程师在协调处理合同履行过程中的有关事项时做法不正确的是（）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"应酌情与合同当事人协商，尽量达成一致",{"key":24,"text":362,"correct":22},"不能达成一致时，应认真研究审慎决定后通知当事人双方并附详细依据",{"key":27,"text":364,"correct":22},"总监理工程师提出的方案或发出的指示具有最终效力，不可改变",{"key":30,"text":366,"correct":22},"总监理工程师基于协调处理合同履行需要，可以变更合同约定的承包人义务",{"key":34,"text":368,"correct":32},"合同当事人任何一方有不同意见均可按照争议的条款解决",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":107,"analysis":37},1101715,"根据《标准施工合同》，关于监理人地位的说法，正确的有（）。",[373,375,377,379,381],{"key":20,"text":374,"correct":32},"监理人是施工合同的当事人",{"key":24,"text":376,"correct":32},"监理人是受发包人委托的发包人代表",{"key":27,"text":378,"correct":22},"监理人是发包人聘请的管理人",{"key":30,"text":380,"correct":22},"监理人属于发包人一方人员",{"key":34,"text":382,"correct":32},"监理人一切行为均遵照发包人的指示",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":177,"analysis":37},1101716,"施工合同的当事人包括（）。",[387,388,390,391,393],{"key":20,"text":302,"correct":22},{"key":24,"text":389,"correct":32},"发包人法定代表人",{"key":27,"text":304,"correct":22},{"key":30,"text":392,"correct":32},"承包人法定代表人",{"key":34,"text":306,"correct":32},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":408,"analysis":37},1101717,"标准施工合同文件组成中的投标函，不同于《建设工程施工合同(示范文本)》规定的投标书及其附件，仅是（）。",[398,400,402,404,406],{"key":20,"text":399,"correct":32},"承包的施工标段",{"key":24,"text":401,"correct":22},"投标人置于投标文件首页的保证中标后与发包人签订合同",{"key":27,"text":403,"correct":32},"工程质量标准",{"key":30,"text":405,"correct":22},"按照要求提供履约担保",{"key":34,"text":407,"correct":22},"按期完成施工任务的承诺文件","BDE",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":222,"analysis":37},1101718,"施工合同的 中标通知书是招标人接受中标人的书面承诺文件，具体写明( )。",[413,414,416,418,420],{"key":20,"text":399,"correct":22},{"key":24,"text":415,"correct":22},"中标价",{"key":27,"text":417,"correct":22},"工期",{"key":30,"text":419,"correct":22},"中标人的项目经理名称",{"key":34,"text":421,"correct":32},"总监理工程师名称",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":267,"analysis":37},1101719,"根据《标准施工合同》，关于市场物价浮动对合同价格的影响，表述正确的有()。",[426,428,430,432,434],{"key":20,"text":427,"correct":32},"工期12个月以上工程不考虑市场价格变化对施工成本的影响",{"key":24,"text":429,"correct":22},"发包人和承包人共同分担市场价格变化风险",{"key":27,"text":431,"correct":22},"施工合同价格可采用公式法进行调整",{"key":30,"text":433,"correct":22},"总价支付部分不考虑物价浮动对合同价格的调整",{"key":34,"text":435,"correct":32},"适用于工期在12个月以内的简明施工合同的通用条款没有调价条款",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":222,"analysis":37},1101720,"订立合同时还需要明确的内容包括( )。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"现场外部接至现场的施工用水、用电、用气的位置",{"key":24,"text":443,"correct":22},"发包人提供图纸的期限和数量",{"key":27,"text":445,"correct":22},"异常恶劣的气候条件范围",{"key":30,"text":447,"correct":22},"物价浮动的合同价格调整",{"key":34,"text":417,"correct":32},{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":134,"analysis":37},1101721,"根据《标准施工合同》，保险的正确处理方式有( )。",[453,455,457,459,461],{"key":20,"text":454,"correct":22},"发承包双方应分别为自己现场所有人员投保人身意外伤害险",{"key":24,"text":456,"correct":32},"发包人应以自己的名义投保工程设备险",{"key":27,"text":458,"correct":22},"承包人应以自己的名义投保施工设备险",{"key":30,"text":460,"correct":22},"发包人应为履行合同的本方人员缴纳工伤保险费",{"key":34,"text":462,"correct":32},"承包人应以自己的名义投保进场材料险",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":477,"analysis":37},1101722,"下列关于施工合同中明确保险责任的说法，正确的有( )。",[467,469,471,473,475],{"key":20,"text":468,"correct":32},"当施工采用平行发包的方式，一般由承包人投保",{"key":24,"text":470,"correct":22},"保险单必须与专用合同条款约定的条件一致",{"key":27,"text":472,"correct":32},"承包人在通知监理人的前提下就可以变动保险合同条款",{"key":30,"text":474,"correct":22},"承包人负责投保时要承担办理保险的费用",{"key":34,"text":476,"correct":32},"施工合同各方要以各自的名义投保","BD",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":207,"analysis":37},1101723,"施工准备阶段，属于发包人应完成的工作有( )。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"办理土地征用",{"key":24,"text":485,"correct":32},"向工程师提供工程进度计划",{"key":27,"text":487,"correct":32},"提供保证施工安全需要的围栏设施",{"key":30,"text":489,"correct":22},"办理现场外临时道路的通行权",{"key":34,"text":491,"correct":22},"组织设计单位向承包人进行图纸交底",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":506,"analysis":37},1101724,"根据《标准施工合同》，工程施工准备阶段承包人应履行的义务有( )。",[496,498,500,502,504],{"key":20,"text":497,"correct":32},"收集地下管线资料",{"key":24,"text":499,"correct":22},"建立专门的质量检查体系",{"key":27,"text":501,"correct":22},"测施工控制网",{"key":30,"text":503,"correct":32},"组织施工图纸会审",{"key":34,"text":505,"correct":22},"提交工程开工报审表","BCE",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":36,"analysis":37},1101725,"承包人应按合同约定的工作内容和施工进度要求，编制施工组织设计和施工进度计划，并对所有施工作业和施工方法的( )负责。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"完备性",{"key":24,"text":514,"correct":22},"安全性",{"key":27,"text":516,"correct":22},"可靠性",{"key":30,"text":518,"correct":32},"准确性",{"key":34,"text":520,"correct":32},"及时性",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":535,"analysis":37},1101726,"需要进行5人以上专家论证方案的安全性和可靠性的专项施工方案有( )。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"高大模板工程",{"key":24,"text":528,"correct":22},"深基坑工程",{"key":27,"text":530,"correct":32},"大爆破工程",{"key":30,"text":532,"correct":32},"脚手架工程",{"key":34,"text":534,"correct":22},"地下暗挖工程","ABE",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":36,"analysis":37},1101727,"在施工组织设计中需要经5人以上专家论证的危险性较大的分部分项工程的专项施工方案有( )。",[540,541,542,543,545],{"key":20,"text":528,"correct":22},{"key":24,"text":534,"correct":22},{"key":27,"text":526,"correct":22},{"key":30,"text":544,"correct":32},"高空作业工程",{"key":34,"text":546,"correct":32},"深水作业工程",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":107,"analysis":37},1101733,"根据《标准施工合同》，关于市场物价浮动对同价格影响的说法错误的有（）。",[551,553,554,556,558],{"key":20,"text":552,"correct":32},"工期12月以上的公司合同，不考虑市场价格变化对施工成本的影响",{"key":24,"text":429,"correct":32},{"key":27,"text":555,"correct":22},"施工合同价格可采用票据法进行调整",{"key":30,"text":557,"correct":22},"调整价格的方法适用于工程量清单中所有工程款",{"key":34,"text":433,"correct":32},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":311,"analysis":37},1101736,"监理人为了便于工程进度管理，可以要求承包人在合同进度计划的基础上编制并提交分阶段和分项的进度计划，特别是合同进度计划关键线路上的()的详细施工计划。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"单位工程",{"key":24,"text":566,"correct":22},"分部工程",{"key":27,"text":568,"correct":32},"分项工程",{"key":30,"text":570,"correct":32},"子分项工程",{"key":34,"text":572,"correct":32},"检验批",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":587,"analysis":37},1101737,"下列属于监理人职责的有()。",[577,579,581,583,585],{"key":20,"text":578,"correct":32},"约定开工时间",{"key":24,"text":580,"correct":32},"提出开工申请",{"key":27,"text":582,"correct":32},"组织设计交底",{"key":30,"text":584,"correct":22},"审查承包人的实施方案",{"key":34,"text":586,"correct":22},"开工通知","DE",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":506,"analysis":37},1101739,"根据《标准施工合同》，以下（ ）属于投标函附录的内容。",[592,594,596,598,599],{"key":20,"text":593,"correct":32},"施工工程标段",{"key":24,"text":595,"correct":22},"缺陷责任期",{"key":27,"text":597,"correct":22},"分包工程部位",{"key":30,"text":228,"correct":32},{"key":34,"text":236,"correct":22},{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":36,"analysis":37},1101740,"对于达到一定规模的危险性较大的分部分项工程如（ ），必须编制专项施工方案，并应组织专家论证、审查。",[604,605,606,607,608],{"key":20,"text":528,"correct":22},{"key":24,"text":534,"correct":22},{"key":27,"text":526,"correct":22},{"key":30,"text":544,"correct":32},{"key":34,"text":546,"correct":32},{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":95,"analysis":37},1101741,"根据《人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释（二）》，合同双方对开工日期有争议的，可以按照（ ）规定来确定。",[613,615,617,619,621],{"key":20,"text":614,"correct":22},"发包人或者监理人发出的开工通知载明的开工日期",{"key":24,"text":616,"correct":22},"开工通知发出后，尚不具备开工条件的，以开工条件具备的时间为开工日期",{"key":27,"text":618,"correct":22},"因承包人原因导致开工时间推迟的，以开工通知载明的时间为开工日期",{"key":30,"text":620,"correct":32},"发包人或监理人未发出开工通知，亦无相关证据证明实际开工日期的，应以施工合同中载明的日期为竣工日期",{"key":34,"text":622,"correct":22},"承包人经发包人同意已经实际进场施工的，以实际进场施工时间为开工日期",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":207,"analysis":37},1101742,"下列工程的专项施工方案中，还需经5 人以上专家论证方案的安全性和可靠性的是（）。",[627,628,629,630,631],{"key":20,"text":526,"correct":22},{"key":24,"text":544,"correct":32},{"key":27,"text":530,"correct":32},{"key":30,"text":534,"correct":22},{"key":34,"text":528,"correct":22},{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":177,"analysis":37},1101743,"标准施工合同的通用条款中规定，合同的组成文件包括（）。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"施工合同协议书",{"key":24,"text":639,"correct":32},"工程量清单",{"key":27,"text":641,"correct":22},"中标通知书",{"key":30,"text":643,"correct":32},"投标文件",{"key":34,"text":645,"correct":32},"发包人要求",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":659,"analysis":37},1101745,"根据《标准施工合同》，承包人在施工准备阶段的主要义务有（）。",[650,651,653,655,657],{"key":20,"text":580,"correct":22},{"key":24,"text":652,"correct":32},"办理临时道路通行审批手续",{"key":27,"text":654,"correct":22},"编制施工组织设计",{"key":30,"text":656,"correct":22},"提交工程质量保证措施文件",{"key":34,"text":658,"correct":22},"负责管理施工控制网点","ACDE",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":535,"analysis":37},1101746,"在施工准备阶段，发包人的义务通常包括（）。",[664,666,667,669,671],{"key":20,"text":665,"correct":22},"提供施工场地",{"key":24,"text":582,"correct":22},{"key":27,"text":668,"correct":32},"发出开工通知",{"key":30,"text":670,"correct":32},"修建现场内的临时道路和临时工程",{"key":34,"text":672,"correct":22},"保证地下管线和地下设施相关资料真实.准确.完整",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":134,"analysis":37},1101747,"关于标准施工合同中保险责任的规定，说法正确的是（）。",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"由承包人负责投保工程保险和第三者责任保险，如有多个承包人施工，也可由发包人负责投保",{"key":24,"text":680,"correct":32},"发包人办理工程保险时必须以发包人和承包人的共同名义投保，承包人投保时则不必",{"key":27,"text":682,"correct":22},"采用不足额投保方式投保，损失赔偿的不足部分由该事件的风险责任方负责补偿",{"key":30,"text":684,"correct":22},"负有投保义务的一方当事人未按合同约定办理保险，另一方当事人可代为办理",{"key":34,"text":686,"correct":32},"负有投保义务的一方当事人未按合同约定办理某项保险，导致受益人未能得到保险人的赔偿，原应从该项保险得到的保险赔偿应由双方当事人共同承担",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":134,"analysis":37},1101748,"根据《标准施工招标文件》的施工合同文本通用合同条款，关于合同价格调整的说法正确的有（）。",[691,693,695,697,699],{"key":20,"text":692,"correct":22},"基准日期后，因法律政策.规范标准的变化导致承包人工程成本发生约定以外的增减，相应调整合同价款",{"key":24,"text":694,"correct":32},"基准日期后，因合同履行期间市场价格浮动对施工成本造成影响，相应调整合同价格",{"key":27,"text":696,"correct":22},"工期12个月以上的施工合同承包人的施工成本受市场价格浮动影响时，采用公式法调整合同价款",{"key":30,"text":698,"correct":22},"调价公式中的可调因素价格指数来源于基准日的价格",{"key":34,"text":700,"correct":32},"调整价格的方法仅适用于工程量清单中按总价支付部分的工程款",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":95,"analysis":37},1101749,"下列有关隐蔽工程与重新检验的表述，正确的有( )。",[705,707,709,711,713],{"key":20,"text":706,"correct":22},"承包人自检后书面通知监理人验收",{"key":24,"text":708,"correct":22},"监理人接到承包人的通知后，应在约定的时间与承包人共同检验",{"key":27,"text":710,"correct":22},"若监理人未能按时提出延期检验要求，又未能按时参加验收，承包人可自行检验",{"key":30,"text":712,"correct":32},"若监理人已经在验收合格记录上签字，监理人只能在有确切证据证明工程有问题的情况下才能要求承包人对已隐蔽的工程进行重新检验",{"key":34,"text":714,"correct":22},"重新检验如果不合格，由此增加的费用和(或)工期延误由承包人承担",[716,720,723,726,729,732],{"id":717,"name":718,"category":7,"favorite":719},1,"领导干部任职前廉政法规知识测试题",92,{"id":721,"name":722,"category":7,"favorite":717},595,"建筑结构与设备",{"id":724,"name":725,"category":7,"favorite":717},715,"招标采购专业知识与法律法规",{"id":727,"name":728,"category":7,"favorite":717},848,"市政方向-通用基础",{"id":730,"name":731,"category":7,"favorite":8},534,"BIM工程师",{"id":733,"name":731,"category":7,"favorite":8},535]