[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,26,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,497,509,521,533,545,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1101525,1,"单选题","招标人和中标人应当在（ ）之日起（ ）之内，订立书面合同",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","中标通知书发出，15日",false,{"key":24,"text":25,"correct":26},"B","中标通知书发出，30日",true,{"key":28,"text":29,"correct":22},"C","中标通知书送达，15日",{"key":31,"text":32,"correct":22},"D","中标通知书送达，30日","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1101526,"根据《标准施工招标文件》规定，以下（ ）属于违规行为。",[38,40,42,44],{"key":20,"text":39,"correct":22},"投标人在通过资格预审后放弃投标",{"key":24,"text":41,"correct":22},"投标人在投标截止日期前修改投标文件",{"key":28,"text":43,"correct":22},"投标人在投标截止日期前撤回已递交的投标文件退出竞争",{"key":31,"text":45,"correct":26},"开标后，投标人发现投标文件存在细微错误，主动向评标委员会提出要求修改",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1101527,"根据《标准施工招标文件》，以下（ ）不属于招标文件的有效内容。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投标预备会会议纪要",{"key":24,"text":53,"correct":22},"对投标人质疑的书面解答",{"key":28,"text":55,"correct":22},"对招标文件的修改、澄清文件",{"key":31,"text":57,"correct":26},"评标报告",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1101528,"根据《标准施工招标文件》的规定，邀请招标一般实行（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"资格预审",{"key":24,"text":65,"correct":26},"资格后审",{"key":28,"text":67,"correct":22},"不进行资格审查",{"key":31,"text":69,"correct":22},"先资格预审，然后资格后审",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1101529,"在有限数量制的资格审查中，如通过详细审查的申请人为8个，未超过规定数量，则（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"选其中前3名通过资格审查",{"key":24,"text":77,"correct":26},"8家均通过资格审查",{"key":28,"text":79,"correct":22},"需重新进行资格审查",{"key":31,"text":81,"correct":22},"对8家重新进行打分排序",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1101530,"某建设项目开标后，评标委员会发现某投标人的工程量清单中，总价金额和单价与工程量乘积之和的金额不一致。请该投标人澄清时，投标授权人经核算后，认为总价、单价都有错误，遂提出新的单价和总价。该投标书的报价应以（ ）为准。",[86,88,90,92],{"key":20,"text":87,"correct":22},"原总价",{"key":24,"text":89,"correct":26},"原单价与工程量乘积之和",{"key":28,"text":91,"correct":22},"新总价",{"key":31,"text":93,"correct":22},"新单价与工程量乘积之和",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1101531,"由评标委员会认定投标人以低于成本报价竞标，后果是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"否决其投标",{"key":24,"text":101,"correct":22},"优先中标",{"key":28,"text":103,"correct":22},"重新报价",{"key":31,"text":105,"correct":22},"直接中标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1101532,"根据《标准施工招标文件》，下列评审工作中，不属于综合评估法的初步评审阶段工作内容的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"形式评审",{"key":24,"text":113,"correct":22},"资格评审",{"key":28,"text":115,"correct":22},"响应性评审",{"key":31,"text":117,"correct":26},"施工方案合理性评审",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1101533,"对具有通用技术、性能标准或者招标人对其技术、性能标准没有特殊要求的招标项目，最适用的评标方法为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"有限数量法",{"key":24,"text":125,"correct":26},"最低评标价法",{"key":28,"text":127,"correct":22},"综合评估法",{"key":31,"text":129,"correct":22},"打分法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1101535,"根据《标准设计施工总承包招标文件》，工程总承包项目的项目经理（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"必须具备工程施工类注册执业资格",{"key":24,"text":137,"correct":22},"必须具备工程设计类注册执业资格",{"key":28,"text":139,"correct":22},"必须同时具备工程设计类和工程施工类注册执业资格",{"key":31,"text":141,"correct":26},"具有工程设计类或工程施工类注册执业资格其中一个资质",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1101536,"买方自行承担在卖方所在地受领货物后运至国内施工现场的运输费用和保险费的价格称之为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"FOB价",{"key":24,"text":149,"correct":22},"FCA价",{"key":28,"text":151,"correct":26},"EXW价",{"key":31,"text":153,"correct":22},"CIP价",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1101537,"CIP价（指定目的地价）中卖方承担（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"货物运至目的地的运费，不包括保险费",{"key":24,"text":161,"correct":26},"货物运至目的地的运费和保险费",{"key":28,"text":163,"correct":22},"货物运输至进口港之前的一切费用",{"key":31,"text":165,"correct":22},"货物在装船港装上船之前的一切费用",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1101538,"在材料设备招标采购中，依法必须进行招标的项目以现金或者支票形式提交的投标保证金应当从其（ ）转出。",[170,172,174,176],{"key":20,"text":171,"correct":22},"一般帐户",{"key":24,"text":173,"correct":26},"基本帐户",{"key":28,"text":175,"correct":22},"综合帐户",{"key":31,"text":177,"correct":22},"专项帐户",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1101539,"在材料设备招标采购中投标保证金有效期应当（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"应当与投标有效期一致",{"key":24,"text":185,"correct":22},"比投标有效期长14天或15天",{"key":28,"text":187,"correct":22},"取决于投标文件的规定",{"key":31,"text":189,"correct":22},"比投标有效期长7天",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1101540,"以下有关材料招标文件要求的说法，不正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"招标文件中的实质性要求和条件，不满足其中任何一项实质性要求和条件的投标将被拒绝",{"key":24,"text":197,"correct":22},"非实质性要求和条件，应规定允许偏差的最大范围、最高项数，以及对这些偏差进行调整的方法",{"key":28,"text":199,"correct":22},"主要材料或者供货合同的主要部分不得要求或者允许分包",{"key":31,"text":201,"correct":26},"招标人不得允许中标人对非主体货物进行分包",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1101541,"材料采购招标中，投标报价与分项报价的合价不一致，应以（ ）为准。",[206,208,210,212],{"key":20,"text":207,"correct":22},"投标报价",{"key":24,"text":209,"correct":26},"分项报价的合价",{"key":28,"text":211,"correct":22},"评标委员会的意见",{"key":31,"text":213,"correct":22},"应否决投标",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1101542,"材料采购招标中，投标保证金的上限是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"10万元",{"key":24,"text":221,"correct":26},"80万元",{"key":28,"text":223,"correct":22},"材料招标项目估算价的2%",{"key":31,"text":225,"correct":22},"材料招标项目估算价的10%",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1101543,"依法必须进行招标的货物，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"15日",{"key":24,"text":233,"correct":26},"20日",{"key":28,"text":235,"correct":22},"30日",{"key":31,"text":237,"correct":22},"90日",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1101544,"在材料采购招标中，合同条款中规定预付款为合同总价的15%，如果投标人提出预付款需按合同总价的20%支付，则可按招标文件规定的年利率计算出合同总价（ ）提前付款后的利息，在评标价中（ ）这笔金额。",[242,244,246,248],{"key":20,"text":243,"correct":26},"5%，加上",{"key":24,"text":245,"correct":22},"5%，减去",{"key":28,"text":247,"correct":22},"20%，加上",{"key":31,"text":249,"correct":22},"20%，减去",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1101545,"在设备采购招标中，如综合评价值相同的，将依照第一级评价因素（ ）的优先次序，根据其评价值高低进行排序。",[254,256,257,259],{"key":20,"text":255,"correct":22},"技术、价格、商务、服务",{"key":24,"text":255,"correct":22},{"key":28,"text":258,"correct":22},"价格、技术、服务、商务",{"key":31,"text":260,"correct":26},"价格、技术、商务、服务",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1101546,"设备采购招标中，以设备寿命周期成本为基础的评标价法中说法不正确的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"设备寿命周期成本=报价+年限运行期间所发生费用-残值",{"key":24,"text":268,"correct":22},"全寿命期的费用最小的设备为最优",{"key":28,"text":270,"correct":26},"评标时可预先确定一个统一的设备评审寿命期，该寿命期即为设备的实际寿命",{"key":31,"text":272,"correct":22},"该方法适用于采购生产线、成套设备、车辆等运行期内各种费用较高的货物",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1101547,"根据材料设备采购合同，以下说法不正确的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"单价计算的结果与总价不一致，以单价为准",{"key":24,"text":280,"correct":22},"文字表示的数值与用数字表示的不一致，以文字表示的数值为准",{"key":28,"text":282,"correct":22},"对招标设备的技术要求允许投标人有一定的偏差",{"key":31,"text":284,"correct":26},"以设备寿命周期成本为基础的评标价法不考虑寿命期末的残值",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":28,"analysis":33},1101548,"以下有关设备招标的说法中，不正确的有（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"技术性能指标不得要求或标明某一特定的专利技术、商标、名称、设计、原产地或供应者等",{"key":24,"text":292,"correct":22},"招标文件中规定的工艺、材料和设备的标准不得有限制性，应尽可能地采用国家标准。",{"key":28,"text":294,"correct":26},"成套设备供应的投标人只能是生产厂家，而不能是工程公司或贸易公司",{"key":31,"text":296,"correct":22},"设备报价分析不仅要考虑设备本体和辅助设备的费用，也要考虑大件运输、安装、调试、专用工具等的费用",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1101549,"在设备采购招标中，基准评价值为（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"最优的评价因素",{"key":24,"text":304,"correct":22},"最差的评价因素",{"key":28,"text":306,"correct":22},"居于中位的评价因素",{"key":31,"text":308,"correct":22},"评价因素的平均值",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},1101550,"设计施工总承包合同模式下，总监理工程师可以授权其他监理人员负责执行其指派的一项或多项监理工作。（ ）应将被授权监理人员的（ ）通知承包人。",[313,315,317,319],{"key":20,"text":314,"correct":22},"发包人，姓名及其授权范围",{"key":24,"text":316,"correct":22},"发包人，职能分工及监理权限",{"key":28,"text":318,"correct":26},"总监理工程师，姓名及其授权范围",{"key":31,"text":320,"correct":22},"总监理工程师，职能分工及监理权限",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1101551,"以下有关监理工程师及监理工程师授权的人员的说法，正确的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"发包人应在发出开始工作通知前14天将总监理工程师的任命通知承包人",{"key":24,"text":328,"correct":22},"总监理工程师更换时，应提前14天通知承包人并征得承包人的同意",{"key":28,"text":330,"correct":26},"总监理工程师超过2天不能履行职责的，应委派代表代行其职责，并通知承包人",{"key":31,"text":332,"correct":22},"总监理工程师可以将自己的所有权力授权给其它监理人员",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},1101552,"根据《标准设计施工总承包合同》，关于工程分包的说法，正确的是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"承包人不得将其承包的工程分包给第三人",{"key":24,"text":340,"correct":22},"投标文件中已说明的分包，合同履行时还需再征得发包人同意",{"key":28,"text":342,"correct":26},"承包人不得将设计和施工的主体、关键性工作的施工分包给第三人",{"key":31,"text":344,"correct":22},"委托分包人的工作由发包人和承包人共同完成",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1101553,"设计施工总承包合同模式下，对于发包人要求中对某工程部分功能的要求错误，承包人在复核时未能发现，导致承包人费用增加和延误工期，则（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"发包人承担费用并延长工期，支付合理利润",{"key":24,"text":352,"correct":22},"承包人承担费用和延误的工期",{"key":28,"text":354,"correct":22},"发包人承担费用并延长工期，无需支付利润",{"key":31,"text":356,"correct":22},"发包人和承包人共同承担费用，并延长工期",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1101554,"根据《标准设计施工总承包合同》，承包人办理保险的情况下，如果承包人未按合同约定办理设计和工程保险、第三者责任保险，或未能使保险持续有效时，（ ）可代为办理，所需费用由（ ）承担。",[361,363,365,367],{"key":20,"text":362,"correct":22},"发包人，发包人",{"key":24,"text":364,"correct":26},"发包人，承包人",{"key":28,"text":366,"correct":22},"监理人，发包人",{"key":31,"text":368,"correct":22},"监理人，承包人",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},1101555,"根据《标准设计施工总承包合同》，设计施工总承包合同承包人完成的设计工作成果和建造完成的建筑物，如无特别约定，则除（ ）以外的著作权归发包人。",[373,375,377,379],{"key":20,"text":374,"correct":22},"收益权",{"key":24,"text":376,"correct":22},"发布权",{"key":28,"text":378,"correct":26},"署名权",{"key":31,"text":380,"correct":22},"保护作品完整权",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1101556,"《标准设计施工总承包合同》中的“价格清单”是指（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"发包人依据设计图纸概算量提出的工程量清单",{"key":24,"text":388,"correct":22},"承包人依据发包人工程量清单计算出的报价清单",{"key":28,"text":390,"correct":22},"承包人按完成投标方案计算的从设计到竣工各阶段的计划费用",{"key":31,"text":392,"correct":26},"承包人按完成投标方案计算的从设计到缺陷责任期各阶段的计划费用",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},1101557,"设计施工总承包合同模式下，（ ）是对“发包人要求”的响应文件，作为合同文件的组成部分。",[397,399,401,403],{"key":20,"text":398,"correct":22},"投标函",{"key":24,"text":400,"correct":22},"价格清单",{"key":28,"text":402,"correct":26},"承包人建议书",{"key":31,"text":404,"correct":22},"进度款支付分解表",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1101558,"根据《标准施工总承包招标文件》，承包人应保证其投保第三者责任险在（ ）前一直有效。",[409,411,413,415],{"key":20,"text":410,"correct":22},"签发工程验收证书",{"key":24,"text":412,"correct":22},"出具最终结清证书",{"key":28,"text":414,"correct":22},"提交竣工验收报告",{"key":31,"text":416,"correct":26},"颁发缺陷责任期终止证书",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1101559,"通用条款中的“承包人文件”，其中最主要的内容是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":26},"设计文件",{"key":24,"text":424,"correct":22},"工期",{"key":28,"text":426,"correct":22},"价款",{"key":31,"text":428,"correct":22},"进度计划",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1101560,"设计施工总承包合同模式下，不可预见物质条件的风险由发包人承担，承包人遇到不可预见物质条件时，及时通知了监理人，监理人没有发出指示，承包人因采取合理措施而增加的费用和工期延误，由（ ）承担。",[433,435,437,439],{"key":20,"text":434,"correct":26},"发包人",{"key":24,"text":436,"correct":22},"承包人",{"key":28,"text":438,"correct":22},"监理人",{"key":31,"text":440,"correct":22},"发包人和承包人",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1101561,"设计施工总承包合同中，监理人获得发包人同意后应提前（ ）向承包人发出开始工作通知。因发包人原因造成监理人未能在合同签订之日起（ ）天内发出开始工作通知，承包人有权提出价格调整要求。",[445,447,449,451],{"key":20,"text":446,"correct":26},"7天，90天",{"key":24,"text":448,"correct":22},"7天，30天",{"key":28,"text":450,"correct":22},"14天，90天",{"key":31,"text":452,"correct":22},"14天，30天",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1101562,"根据《标准设计施工总承包合同》，需政府有关部门审查或批准的设计文件，发包人应在对其审查同意后的（ ）日内向政府有关部门报送审查。",[457,459,461,463],{"key":20,"text":458,"correct":26},"7",{"key":24,"text":460,"correct":22},"15",{"key":28,"text":462,"correct":22},"21",{"key":31,"text":464,"correct":22},"30",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1101563,"设计施工总承包合同模式下，以下说法不正确的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"设计文件应由发包人向有关政府部门报送审查",{"key":24,"text":472,"correct":26},"政府有关部门提出审查意见，发包人必须修改“发包人要求”文件，使之内容与政府审查意见一致",{"key":28,"text":474,"correct":22},"如审查指出，发包人原要求与法律法规相抵触，发包人应重新提出“发包人要求”文件",{"key":31,"text":476,"correct":22},"发包人应在审查同意承包人设计文件后7在内，向政府有关部门报送设计文件",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1101564,"根据《标准设计施工总承包合同》，由于异常恶劣的气侯条件带来的延误与损失，（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"不能顺延工程，不能补偿费用和利润",{"key":24,"text":484,"correct":22},"可以顺延工程，但不能补偿费用和利润",{"key":28,"text":486,"correct":26},"可以顺延工程，可以补偿费用但不能补偿利润",{"key":31,"text":488,"correct":22},"可以顺延工程，可以补偿费用和利润",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1101565,"根据《标准施工合同》，由于异常恶劣的气侯条件带来的延误与损失，（ ）。",[493,494,495,496],{"key":20,"text":482,"correct":22},{"key":24,"text":484,"correct":26},{"key":28,"text":486,"correct":22},{"key":31,"text":488,"correct":22},{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},1101566,"设计施工总承包合同模式下，承包人只可以索赔费用的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"发包人提供的材料、设备不符合要求",{"key":24,"text":504,"correct":22},"发包人原因指示的暂停施工",{"key":28,"text":506,"correct":26},"发包人要求提前交货",{"key":31,"text":508,"correct":22},"隐蔽工程的重新检验证明质量合格",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},1101567,"根据《设计施工总承包合同》，总承包项目的竣工试验，承包人应提前（ ）将申请竣工试验的通知送达监理人。监理人应在（ ）内，确定竣工试验的具体时间。",[513,515,517,519],{"key":20,"text":514,"correct":22},"28天，28天",{"key":24,"text":516,"correct":22},"14天，7天",{"key":28,"text":518,"correct":26},"21天，14天",{"key":31,"text":520,"correct":22},"28天，21天",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},1101568,"在设计施工总承包合同模式下，承包人设计文件提交监理人后，由（ ）组织设计审查，自监理人收到设计文件起的审查期限为（ ）天。",[525,527,529,531],{"key":20,"text":526,"correct":22},"监理人，14天",{"key":24,"text":528,"correct":22},"监理人，21天",{"key":28,"text":530,"correct":22},"发包人，14天",{"key":31,"text":532,"correct":26},"发包人，21天",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},1101569,"设计施工总承包合同模式下，竣工试验的第三阶段，进行（ ）试验。",[537,539,541,543],{"key":20,"text":538,"correct":22},"检查和功能性试验",{"key":24,"text":540,"correct":22},"在所有可利用的操作条件下安全运行",{"key":28,"text":542,"correct":26},"各种性能测试",{"key":31,"text":544,"correct":22},"设备质量检验",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1101570,"对于大型工程为了检验承包人的设计、设备选型和运行情况等是否满足合同约定，会在缺陷责任期内工程稳定运行一段时间后，进行竣工后试验。竣工后试验由（ ）组织，应在试验日期提前（ ）通知对方。",[549,551,552,554],{"key":20,"text":550,"correct":22},"承包人，14天",{"key":24,"text":530,"correct":22},{"key":28,"text":553,"correct":22},"承包人或发包人，14天",{"key":31,"text":555,"correct":26},"承包人或发包人，21天",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1101571,"设计施工总承包合同模式下，关于“开始工作通知”说法正确的是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"表明从发出该通知时间开始工作",{"key":24,"text":563,"correct":22},"与“开工通知”的说法相同",{"key":28,"text":565,"correct":26},"表明自该通知中载明的开始工作日期计算合同工期",{"key":31,"text":567,"correct":22},"该通知是由发包人发出的",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":28,"analysis":33},1101572,"根据FIDIC施工合同条件，承包商可在其认为工程即将竣工并做好接收准备的日期前不少于（ ），向工程师发出申请接收证书的通知。工程师在收到承包商申请通知后（ ）内 ，应向承包商颁发接收证书。",[572,574,576,578],{"key":20,"text":573,"correct":22},"7天，7天",{"key":24,"text":575,"correct":22},"7天，14天",{"key":28,"text":577,"correct":26},"14天，28天",{"key":31,"text":579,"correct":22},"28天，56天",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},1101573,"根据FIDIC施工合同条件，对永久工程每项工程的计量，应以（ ）计算。",[584,586,588,590],{"key":20,"text":585,"correct":22},"A图纸净值",{"key":24,"text":587,"correct":22},"双方签证确定的净值",{"key":28,"text":589,"correct":26},"实际完成的净值",{"key":31,"text":591,"correct":22},"考虑膨胀、收缩或浪费在内的实际完成值",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1101574,"根据FIDIC《施工合同条件》，可以调整合同约定单价的条件之一是：工程量的变动直接导致该项工作每单位成本的变动超过（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"0.01%",{"key":24,"text":599,"correct":26},"1%",{"key":28,"text":601,"correct":22},"5%",{"key":31,"text":603,"correct":22},"10%",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":28,"analysis":33},1101575,"根据FIDIC《施工合同条件》 ，工程师在收到索赔是报告或证明资料后（ ）天内，或在工程师可能建议并经承包商认可的其它期限内，做出回应。",[608,610,612,614],{"key":20,"text":609,"correct":22},"14天",{"key":24,"text":611,"correct":22},"28天",{"key":28,"text":613,"correct":26},"42天",{"key":31,"text":615,"correct":22},"56天",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]