[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,25,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,224,236,248,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,445,457,468,480,492,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1101475,1,"单选题","根据《标准施工合同》，关于暂估价的说法，错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","暂估价是签约合同价的组成部分",false,{"key":24,"text":25,"correct":26},"B","暂估价内的专业工程不一定实施",true,{"key":28,"text":29,"correct":22},"C","暂估价的内容在投标时难以确定准确价格",{"key":31,"text":32,"correct":22},"D","暂估价的内容不包括计日工","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1101476,"在合同履行过程中，承包人违反合同规定，监理人发出整改通知（ ）天后，承包人仍不纠正违约行为，发包人可以向承包人发出解除合同通知。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1",{"key":24,"text":41,"correct":22},"14",{"key":28,"text":43,"correct":26},"28",{"key":31,"text":45,"correct":22},"56",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1101477,"根据《施工合同标准文本》的规定，因承包人违约而解除合同，发包人的行为错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"发包人可派员进驻施工场地，另行组织人员或委托其他承包人施工",{"key":24,"text":53,"correct":22},"发包人有权扣留使用承包人在现场的材料、设备和临时设施",{"key":28,"text":55,"correct":26},"发包人扣留使用承包人在现场的材料设备，则发包人不能再享有索赔的权利",{"key":31,"text":57,"correct":22},"发包人有权要求承包人将其为实施合同而签订的材料和设备的订货合同或任何服务协议转让给发包人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1101478,"根据《标准施工合同》，发包人采购的建筑材料提前交货，则承包人（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"应当拒收",{"key":24,"text":65,"correct":22},"可以拒收",{"key":28,"text":67,"correct":22},"不得拒收，自行支付该材料增加的保管费",{"key":31,"text":69,"correct":26},"不得拒收，要求发包人支付该材料增加的保管费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1101479,"发包人采购的材料需进行使用前抽查试验，关于该试验相应合同义务的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"承包人负责试验并承担相应费用",{"key":24,"text":77,"correct":22},"发包人负责试验并承担相应费用",{"key":28,"text":79,"correct":26},"承包人负责试验，发包人承担相应费用",{"key":31,"text":81,"correct":22},"发包人负责试验，承包人承担相应费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1101480,"根据《标准施工合同》，关于承包人施工安全责任的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"承包人应按合同约定的安全工作内容编制施工安全措施计划",{"key":24,"text":89,"correct":22},"合同约定的安全施工措施所需费用由承包人承担，安全作业环境所需费用由发包人承担",{"key":28,"text":91,"correct":22},"承包人对施工现场所有人员的工伤事故承担责任",{"key":31,"text":93,"correct":22},"因采取合同未约定的安全施工措施增加的费用由承包人自行承担",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1101481,"施工过程中发生变更，而合同中没有适用或类似工程的单价，应（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"由发包人提出适当的变更工作单价并执行",{"key":24,"text":101,"correct":22},"由承包人提出适当的变更工作单价，经监理人确认后执行",{"key":28,"text":103,"correct":26},"由监理人商定或确定变更工作单价并执行",{"key":31,"text":105,"correct":22},"由工程造价管理机构提出变更工作单价并执行",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1101482,"某工程项目由于异常不利的气侯条件，导致施工单位工期拖延且产生费用损失，则（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"工期可以顺延，但费用不予补偿",{"key":24,"text":113,"correct":22},"工期可以顺延，可以补偿费用，不能补偿利润",{"key":28,"text":115,"correct":22},"工期可以顺延，费用和补偿都可以补偿",{"key":31,"text":117,"correct":22},"工期、费用、利润均不能补偿",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1101483,"如果索赔事件的影响持续存在，承包商应在该项索赔事件（ ），提出最终索赔通知书，说明最终要求索赔的追加付款金额和延长的工期，并附必要的记录和证明材料。",[122,124,126,128],{"key":20,"text":123,"correct":22},"发生后的28天内",{"key":24,"text":125,"correct":22},"全部消除后",{"key":28,"text":127,"correct":22},"影响结束后的14天内",{"key":31,"text":129,"correct":26},"影响结束后的28天内",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1101484,"根据标准施工合同通用条款的规定，下列事件中，承包商索赔可获得利润补偿的有（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"不利的物质条件",{"key":24,"text":137,"correct":22},"发包人提供的材料和工程设备提前交货",{"key":28,"text":139,"correct":22},"异常恶劣的气候条件",{"key":31,"text":141,"correct":26},"基准资料的错误",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1101485,"承包人行使建设工程价款优先受偿权的期限为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"1个月",{"key":24,"text":149,"correct":26},"6个月",{"key":28,"text":151,"correct":22},"1年",{"key":31,"text":153,"correct":22},"2年",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1101486,"当事人对建设工程实际竣工日期有争议，承包人已经提交竣工验收报告，发包人拖延验收的，则实际竣工日为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"竣工验收合格之日",{"key":24,"text":161,"correct":26},"承包人提交竣工验收报告之日",{"key":28,"text":163,"correct":22},"实际竣工之日",{"key":31,"text":165,"correct":22},"转移占有之日",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1101487,"一般情况下由（ ）负责提供试运行所需的人员、器材和必要的条件，并承担全部试运行费用。",[170,172,174,176],{"key":20,"text":171,"correct":22},"发包人",{"key":24,"text":173,"correct":22},"设备供应商",{"key":28,"text":175,"correct":26},"承包人",{"key":31,"text":177,"correct":22},"监理人",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1101488,"根据《施工合同标准文本》的规定，工程经验收合格后，由（ ）向承包人出具经（ ）签认的单位工程验收证书。",[182,184,186,188],{"key":20,"text":183,"correct":26},"监理人、发包人",{"key":24,"text":185,"correct":22},"发包人、监理人",{"key":28,"text":187,"correct":22},"监理人、工程质量监督机构",{"key":31,"text":189,"correct":22},"发包人、工程质量监督机构",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1101489,"（ ）以后承包人就失去索赔的权利。",[194,196,198,200],{"key":20,"text":195,"correct":22},"工程颁发接收证书",{"key":24,"text":197,"correct":22},"竣工结算",{"key":28,"text":199,"correct":22},"颁发缺陷责任终止证书",{"key":31,"text":201,"correct":26},"颁发结清证书",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1101490,"某工程在缺陷责任期内，因施工质量问题出现重大缺陷，发包人通知承包人进行维修，承包人不能在合理时间内进行维修，发包人委托其他单位进行修复，修复费用由（ ）承担。",[206,207,208,210],{"key":20,"text":171,"correct":22},{"key":24,"text":175,"correct":26},{"key":28,"text":209,"correct":22},"使用人",{"key":31,"text":211,"correct":22},"以上都不正确",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1101491,"某工程项目，承包人于2019年5月1日提交了工程竣工报告，5月15日通过了工程师组织的工程预验收，5月25日发包人组织工程验收，5月28日监理人向承包人出具有经发包人签认的工程接收证书，承包人的竣工日期应确定为（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"5月1日",{"key":24,"text":219,"correct":22},"5月15日",{"key":28,"text":221,"correct":22},"5月25日",{"key":31,"text":223,"correct":22},"5月28日",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1101492,"根据《标准施工合同》，竣工验收基本合格但提出了需要整修和完善要求，经监理人复查整修和完善工作达到了要求，再签发工程接收证书，这种情况下竣工日为（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"承包人提交竣工验收申请报告之日",{"key":24,"text":231,"correct":22},"整修和完善工作完成日",{"key":28,"text":233,"correct":22},"承包人重新提交竣工验收报告的日期",{"key":31,"text":235,"correct":22},"工程接收证书颁发日",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1101493,"根据《施工合同标准文本》的规定，在工程量的计量中，总价子目结算通常（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":26},"不进行现场计量，只进行图纸计量",{"key":24,"text":243,"correct":22},"进行现场计量，不进行图纸计量",{"key":28,"text":245,"correct":22},"现场计量和图纸计量必须均进行",{"key":31,"text":247,"correct":22},"无须进行现场计量和图纸计量",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1101494,"“不利气候条件” 对施工的影响属于（ ）应承担的风险。",[252,253,254,255],{"key":20,"text":171,"correct":22},{"key":24,"text":175,"correct":26},{"key":28,"text":177,"correct":22},{"key":31,"text":256,"correct":22},"保险人",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},1101495,"发包人在（ ），向承包人返还质量保证金。",[261,263,265,267],{"key":20,"text":262,"correct":22},"申请竣工验收的同时",{"key":24,"text":264,"correct":22},"竣工验收合格后",{"key":28,"text":266,"correct":22},"保修期到期后",{"key":31,"text":268,"correct":26},"缺陷责任期到期后",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},1101496,"在施工合同履行过程中发生紧急情况，监理人未及时下达暂停施工指示，承包人先暂停施工，并向监理人提出暂停施工的书面请求。监理人在24小时内未答复，视为（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":26},"同意承包人的暂停施工请求",{"key":24,"text":276,"correct":22},"不同意承包人的暂停施工请求",{"key":28,"text":278,"correct":22},"须继续等待24小时方是规定的回复期限",{"key":31,"text":280,"correct":22},"必须马上复工",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1101497,"根据《标准施工合同》，因承包人原因逾期竣工时，承包人应支付逾期竣工违约金，最高赔偿限额为（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"工程结算价的2%",{"key":24,"text":288,"correct":22},"签约合同价的2%",{"key":28,"text":290,"correct":22},"工程结算价的3%",{"key":31,"text":292,"correct":26},"签约合同价的3%",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},1101498,"合同工期为（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"合同内约定的工期",{"key":24,"text":300,"correct":22},"发出开工通知的日期至竣工验收的工期",{"key":28,"text":302,"correct":22},"合同基准日至竣工验收的工期",{"key":31,"text":304,"correct":26},"合同内约定的工期与变更索赔顺延的工期之和",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},1101499,"根据《标准施工合同》，判定是提前竣工还是延误竣工是比较（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"合同内约定的工期和合同工期",{"key":24,"text":312,"correct":22},"缺陷责任期和质保期",{"key":28,"text":314,"correct":22},"施工期和合同内约定的工期",{"key":31,"text":316,"correct":26},"施工期与合同工期",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},1101500,"在合同履行过程中，由于发包人甲供材料未按时到货，导致承包人停工待材料，则应（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"仅补偿承包人费用，不补偿利润",{"key":24,"text":324,"correct":22},"既不补偿承包人费用，也不补偿利润",{"key":28,"text":326,"correct":26},"既补偿承包人费用，又补偿利润",{"key":31,"text":328,"correct":22},"仅补偿利润部分，不补偿费包人费用",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},1101501,"保修期自（ ）起算。",[333,335,337,339],{"key":20,"text":334,"correct":22},"开工日",{"key":24,"text":336,"correct":22},"约定竣工日",{"key":28,"text":338,"correct":22},"缺陷责任期",{"key":31,"text":340,"correct":26},"实际竣工日",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},1101502,"由于承包人原因未在约定的工期内竣工的，则对原约定竣工日期后继续施工的工程，在使用价格调整公式进行价格调整时，应使用的现行价格指数是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"原约定竣工日期的价格指数",{"key":24,"text":348,"correct":22},"实际竣工日期的价格指数",{"key":28,"text":350,"correct":26},"原约定竣工日期与实际竣工日期的两个价格指数中较低者",{"key":31,"text":352,"correct":22},"原约定竣工日期与实际竣工日期的两个价格指数中较高者",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},1101503,"根据《标准材料设备采购合同》以下合同文件中：1.投标函；2.商务和技术偏差表； 3.技术服务和质保期服务计划；4.中标设备技术性能指标的详细描述；5.分项报价表；6.供货要求。效力排序正确的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"1-6-2-4-5-3",{"key":24,"text":360,"correct":22},"1-6-2-5-4-3",{"key":28,"text":362,"correct":26},"1-2-6-5-4-3",{"key":31,"text":364,"correct":22},"1-2-5-6-3-5",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},1101504,"材料采购合同中，卖方应在合同材料预计（ ）预通知买方，并在合同材料（ ）正式通知买方。",[369,371,373,375],{"key":20,"text":370,"correct":22},"启运7日前，启运24小时前",{"key":24,"text":372,"correct":26},"启运7日前，启运24小时内",{"key":28,"text":374,"correct":22},"启运24小时前，启动24小时内",{"key":31,"text":376,"correct":22},"启运24小时前，到达前24小时内",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},1101505,"根据九部委材料采购合同的规定，买方在全部合同材料交付后（ ）内未安排检验和验收的，卖方可签署进度款支付函并提交买方，买方在收到后（ ）内未提出书面异议的，则进度款支付函生效。",[381,383,385,387],{"key":20,"text":382,"correct":22},"7日，3日",{"key":24,"text":384,"correct":22},"28日，3日",{"key":28,"text":386,"correct":26},"3个月，7日",{"key":31,"text":388,"correct":22},"6个月，7日",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":28,"analysis":33},1101506,"根据九部委材料采购合同的规定，以下有关材料合同中违约责任承担的说法，不正确的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"卖方未能按时交付合同材料的，应向买方支付迟延交货违约金。",{"key":24,"text":396,"correct":22},"卖方支付迟延交货违约金，不能免除其继续交付合同材料的义务。",{"key":28,"text":398,"correct":26},"延迟交付材料金额每周为0.5%",{"key":31,"text":400,"correct":22},"迟延付款违约金的最高限额为合同价格的10%",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},1101507,"根据九部委材料采购合同文本，买方在收到卖方提交的单据并经审核无误后（ ）内，应向卖方支付进度款。",[405,407,409,411],{"key":20,"text":406,"correct":22},"7天",{"key":24,"text":408,"correct":22},"14天",{"key":28,"text":410,"correct":26},"28天",{"key":31,"text":412,"correct":22},"30天",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1101508,"根据《标准设备采购合同》，对于专用合同条款约定的超大超重件 ，卖方应在包装箱两侧标注（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"此端朝上，请勿倒置",{"key":24,"text":420,"correct":26},"重心、起吊点",{"key":28,"text":422,"correct":22},"尺寸，重量",{"key":31,"text":424,"correct":22},"危险标识",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1101509,"设备采购合同中，由（ ）负责提供设备运至目的地的包装。",[429,431,433,435],{"key":20,"text":430,"correct":22},"买方",{"key":24,"text":432,"correct":26},"卖方",{"key":28,"text":434,"correct":22},"运输部门",{"key":31,"text":436,"correct":22},"安装单位",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1101510,"根据九部委设备采购合同的规定，由于买方原因在最后一批合同设备交货后（ ）内未能开始考核，则买卖双方应在上述期限届满后（ ）内或专用合同条款另行约定的时间内签署验收款支付函。",[441,442,443,444],{"key":20,"text":382,"correct":22},{"key":24,"text":384,"correct":22},{"key":28,"text":386,"correct":22},{"key":31,"text":388,"correct":26},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},1101511,"根据九部委设备采购合同，合同设备的所有风险自（ ）起由卖方转移至买方。合同设备交付给买方之前的运输过程中所有的风险均由（ ）承担。",[449,451,453,455],{"key":20,"text":450,"correct":22},"签订合同买方",{"key":24,"text":452,"correct":22},"签订合同卖方",{"key":28,"text":454,"correct":22},"交付买方",{"key":31,"text":456,"correct":26},"交付卖方",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":28,"analysis":33},1101512,"根据九部委设备采购合同的规定，以下有关设备采购合同中违约责任承担的说法，不正确的是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"合同一方不履行合同义务，应向对方承担继续履行、采取修理、更换、退货等补救措施或者赔偿损失等违约责任",{"key":24,"text":464,"correct":22},"卖方支付迟延交货违约金，不能免除其继续交付合同设备的义务",{"key":28,"text":466,"correct":26},"延迟交付设备金额每周为0.08%",{"key":31,"text":400,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},1101513,"根据《标准设备采购合同》的规定，买方在收到卖方提交的买方签署的（ ）证书或已生效的结清款支付函正本一份 ，并经审核无误后（ ）内，向卖方支付结清款。",[472,474,476,478],{"key":20,"text":473,"correct":22},"缺陷责任期届满，14天",{"key":24,"text":475,"correct":22},"缺陷责任期届满，28天",{"key":28,"text":477,"correct":22},"质量保证期届满，14天",{"key":31,"text":479,"correct":26},"质量保证期届满，28天",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},1101514,"某工程项目招标过程中，甲投标人研究招标文件后，以书面形式提出质疑问题。招标人对此问题给予了书面解答，则该解答（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"只对甲投标人有效",{"key":24,"text":487,"correct":22},"对全体投标人有效，但无须发送给其他投标人",{"key":28,"text":489,"correct":22},"应发送给全体投标人，并说明问题来源",{"key":31,"text":491,"correct":26},"应发送给全体投标人，但不说明问题来源",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},1101515,"应由（ ）向未通过资格预审的申请人发出资格预审结果的书面通知。",[496,498,500,502],{"key":20,"text":497,"correct":22},"资质审查委员会",{"key":24,"text":499,"correct":22},"评标委员会",{"key":28,"text":501,"correct":26},"招标人",{"key":31,"text":503,"correct":22},"招标代理机构",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1101516,"某项目的招标人具有编制招标文件和组织评标的能力，则招标人（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"可以采用直接委托方式发包",{"key":24,"text":511,"correct":26},"可以自行招标，但应当备案",{"key":28,"text":513,"correct":22},"可以自行招标，无需备案",{"key":31,"text":515,"correct":22},"必须委托中介机构代理招标",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1101517,"关于评标委员会组成的说法，正确的是（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"招标人代表2人，专家6人",{"key":24,"text":523,"correct":26},"招标人代表2人，专家5人",{"key":28,"text":525,"correct":22},"招标人代表2人，专家4人",{"key":31,"text":527,"correct":22},"招标人代表2人，专家3人",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":31,"analysis":33},1101518,"某工程招标中，投标文件的内容未完全响应招标文件，但仍属于有效投标文件的情况是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"联合体投标没有提交联合体协议书",{"key":24,"text":535,"correct":22},"投标工期长于招标文件中要求的工期",{"key":28,"text":537,"correct":22},"投标保函金额少于招标文件的要求",{"key":31,"text":539,"correct":26},"未详细说明使用专利施工的技术细节",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},1101519,"根据《招标投标法》，招标代理机构的性质是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":26},"依法成立的企业",{"key":24,"text":547,"correct":22},"地方政府成立的事业单位",{"key":28,"text":549,"correct":22},"依法成立的行业协会",{"key":31,"text":551,"correct":22},"行业主管部门设立的服务机构",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1101520,"《标准资格预审文件》组成文件中，适用于公开招标，具有代替招标公告功能的文件是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"资格预审公告",{"key":24,"text":559,"correct":22},"申请人须知",{"key":28,"text":561,"correct":22},"资格审查方法和办法",{"key":31,"text":563,"correct":22},"资格预审申请文件",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},1101521,"联合体中标的，其履约担保（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"由组成联合体的各个主体分别递交",{"key":24,"text":571,"correct":22},"由组成联合体的各主体中的任一主体递交",{"key":28,"text":573,"correct":26},"由联合体的牵头人递交",{"key":31,"text":575,"correct":22},"由联合体各成员共同递交",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},1101522,"关于招标人解答投标人疑问的说法，正确的是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"招标人给予口头答复即可",{"key":24,"text":583,"correct":22},"招标人答复只给予提问者",{"key":28,"text":585,"correct":26},"招标人答复作为招标文件的组成部分",{"key":31,"text":587,"correct":22},"招标人答复与招标文件不一致，以招标文件为准",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},1101523,"关于定标的说法，正确的是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"确定中标人的权利归评标委员会",{"key":24,"text":595,"correct":26},"招标人在评标委员会推荐的中标候选人中确定中标人",{"key":28,"text":597,"correct":22},"招标人可以根据自己的意愿确定中标人",{"key":31,"text":599,"correct":22},"中标通知书发出后，招标人有权拒绝订立合同",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":28,"analysis":33},1101524,"公开招标在开标时，应当由（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":22},"招标监督机构主持，所有投标人均应参加",{"key":24,"text":607,"correct":22},"招标监督机构主持，投标人自愿参加",{"key":28,"text":609,"correct":26},"招标人主持，所有投标人均应参加",{"key":31,"text":611,"correct":22},"招标人主持，投标人自愿参加",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]