[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,24,50,2250,[13,34,46,58,70,82,94,104,116,128,140,152,164,174,186,198,210,222,232,244,256,268,280,292,302,314,326,334,346,356,368,378,390,402,414,426,438,450,462,473,485,497,507,519,531,541,553,565,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1101423,1,"单选题","保险合同是（）与保险人约定保险权利义务关系的协议。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","受益人",false,{"key":24,"text":25,"correct":26},"B","投保人",true,{"key":28,"text":29,"correct":22},"C","被保险人",{"key":31,"text":32,"correct":22},"D","保险金请求权人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1101424,"某工程所有人为其工程投保建筑工程一切险，工程尚未完工时，该工程所有人即于6月10日开始使用部分工程，后全部工程于9月10日完工，9月30日验收合格。保险单列明保险期终止日为6月1日。则该建筑工程一切险保险人的保险责任期限终止日为（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"6月10日",{"key":24,"text":41,"correct":22},"9月10日",{"key":28,"text":43,"correct":22},"9月30日",{"key":31,"text":45,"correct":26},"6月1日",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1101425,"施工企业职工意外伤害险按照建筑工程项目总造价计收保险费时，关于其保险期间的说法正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"自保险人同意承保.收取保险费并签发保险单的当日零时起",{"key":24,"text":53,"correct":22},"自施工工程项目被批准正式开工，并且投保人已交付保险费的当日零时起",{"key":28,"text":55,"correct":22},"至约定的终止日的24时止",{"key":31,"text":57,"correct":26},"至施工合同规定的工程竣工之日止",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1101426,"下列关于保险合同的说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"财产保险合同的转让应当在通知保险人后依法转让",{"key":24,"text":65,"correct":26},"建筑工程一切险为财产保险合同",{"key":28,"text":67,"correct":22},"安装工程一切险为人身保险合同",{"key":31,"text":69,"correct":22},"投保人拖欠人身保险的保险费，保险人可以通过诉讼方式要求投保人支付",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1101427,"下列关于建筑工程一切险保险人的保险责任期限的说法中，正确的有（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程延误竣工，工程竣工验收日为保险责任终止日",{"key":24,"text":77,"correct":26},"工程延误竣工，保险责任仍至保险单约定的时间止",{"key":28,"text":79,"correct":22},"工程提前竣工，保险责任仍至保险单约定的时间止",{"key":31,"text":81,"correct":22},"工程提前竣工，不对保险单约定的责任期限产生影响",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1101428,"下列关于建筑工程一切险的说法正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"《建设工程施工合同（示范文本）》GF-2013-0201规定由承包人投保",{"key":24,"text":89,"correct":22},"《标准施工招标文件》（2007年版）规定由发包人投保",{"key":28,"text":91,"correct":26},"业主聘用的建筑师可以作为被保险人",{"key":31,"text":93,"correct":22},"设备供应商可以作为被保险人",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1101429,"下列关于施工企业职工意外伤害险的保险责任期限的说法中，正确的有（）。",[98,99,100,102],{"key":20,"text":79,"correct":22},{"key":24,"text":77,"correct":22},{"key":28,"text":101,"correct":26},"工程因故停工，保险单约定的责任期限应当顺延",{"key":31,"text":103,"correct":22},"工程停工期间，保险人继续承担保险责任",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},1101430,"建筑工程一切险的被保险人不包括（）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"工程所有人",{"key":24,"text":111,"correct":22},"承包商",{"key":28,"text":113,"correct":22},"分包商",{"key":31,"text":115,"correct":26},"材料商",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1101431,"建筑工程一切险的除外责任包括（ ）造成的损失。",[120,122,124,126],{"key":20,"text":121,"correct":22},"台风",{"key":24,"text":123,"correct":22},"暴雨引起地面下陷",{"key":28,"text":125,"correct":22},"雷电引起火灾",{"key":31,"text":127,"correct":26},"自然磨损",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1101432,"有关工程保险的说法中，错误的是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"建筑工程一切险往往还加保第三者责任险",{"key":24,"text":135,"correct":26},"在特殊情况下，赔偿金额可以超过保险单明细表中对应列明的每次事故赔偿限额",{"key":28,"text":137,"correct":22},"工程开工前，发包人应当为建设工程办理保险，支付保险费用",{"key":31,"text":139,"correct":22},"建筑工程一切险的被保险人包括分包商",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1101433,"工程建设涉及的主要险种中，（ ）是承保各类民用、工业和公用事业建筑工程项目，包括道路、桥梁、水坝、港口等，在建造过程中因自然灾害或意外事故而引起的一切损失的险种。",[144,146,148,150],{"key":20,"text":145,"correct":26},"建筑工程一切险",{"key":24,"text":147,"correct":22},"安装工程一切险",{"key":28,"text":149,"correct":22},"机器损坏险",{"key":31,"text":151,"correct":22},"人身意外伤害险",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},1101434,"下列属于建筑工程一切险中意外事故的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"风暴、暴雨",{"key":24,"text":159,"correct":22},"山崩、雪崩",{"key":28,"text":161,"correct":22},"台风、龙卷风",{"key":31,"text":163,"correct":26},"火灾和爆炸",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1101435,"第三者责任险是指凡工程期间的保险有效期内因工地上发生意外事故造成工地及邻近地区的第三者人身伤亡或财产损失，依法应由（ ）承担的经济赔偿责任。",[168,169,171,173],{"key":20,"text":29,"correct":26},{"key":24,"text":170,"correct":22},"保险人",{"key":28,"text":172,"correct":22},"保险人和被保险人连带",{"key":31,"text":21,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":28,"analysis":33},1101436,"根据九部委的《标准勘察设计合同》，以下有关更换勘察项目负责人的说法，正确的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"勘察人指派项目负责人应事先征得发包人同意",{"key":24,"text":181,"correct":22},"勘察人可以自行更换项目负责人",{"key":28,"text":183,"correct":26},"勘察人更换项目负责人应事先征得发包人同意",{"key":31,"text":185,"correct":22},"勘察人应在更换7前将拟更换的项目负责人的姓名和详细资料提交发包人",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1101437,"建设工程勘察中需要占用位于本工程区域内的临时用地，由（ ）向行政管理部门报建申请。",[190,192,194,196],{"key":20,"text":191,"correct":22},"发包人",{"key":24,"text":193,"correct":26},"勘察人",{"key":28,"text":195,"correct":22},"发包人或勘察人",{"key":31,"text":197,"correct":22},"发包人和勘察人",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1101438,"根据九部委发布的《标准设计合同》，设计费用的支付说法正确的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"设计费用只能采用定金支付，不能采用预付款",{"key":24,"text":205,"correct":22},"由于不可抗力或设计人的原因解除合同时，定金不予退还",{"key":28,"text":207,"correct":22},"设计费应保留3%的质量保证金",{"key":31,"text":209,"correct":26},"发包人应在收到中期支付申请后的28天内支付中期款项",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1101439,"根据九部委发布的《标准勘察合同》，以下有关合同文件效力由大到小的排序正确的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"合同协议书-投标函及附录-中标通知书-专用条款-通用条款",{"key":24,"text":217,"correct":26},"中标通知书-专用条款-通用条款-发包人要求-勘察费用清单",{"key":28,"text":219,"correct":22},"合同协议书-通用条款-专用条款-发包人要求-勘察费用清单",{"key":31,"text":221,"correct":22},"专用条款-通用合同条款-发包人要求-勘察纲要-勘察费用清单",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1101440,"根据九部委的勘察合同的规定，承担勘探场地临时设施的搭设、维护、管理和拆除工作的主体是（ ）。",[226,227,228,230],{"key":20,"text":191,"correct":22},{"key":24,"text":193,"correct":26},{"key":28,"text":229,"correct":22},"施工单位",{"key":31,"text":231,"correct":22},"监理单位",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":28,"analysis":33},1101441,"根据九部委发布的《标准设计合同》，合同的履约担保为无条件担保，其内涵为（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"担保人无条件地提供担保",{"key":24,"text":239,"correct":22},"履约保证金的数额不确定",{"key":28,"text":241,"correct":26},"担保人在收到发包人的赔偿要求后，无条件支付",{"key":31,"text":243,"correct":22},"设计人在收到发包人的赔偿要求后，无条件支付",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":28,"analysis":33},1101442,"根据九部委发布的《标准勘察合同》，履约担保有效期（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"自勘察人签订勘察合同至勘察工作质量保修期结束后的14或15天失效",{"key":24,"text":251,"correct":22},"自勘察人开始勘察工作至勘察工作完成失效",{"key":28,"text":253,"correct":26},"自勘察人签订勘察合同至发包人签收最后一批勘察成果文件之日起28日后失效",{"key":31,"text":255,"correct":22},"自勘察人开始勘察工作至发包人签收最后一批勘察成果文件之日起28日后失效",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":31,"analysis":33},1101443,"以下有关九部委发布的《标准勘察合同》内容说法不正确的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"适用范围是依法必须招标的与工程建设有关的勘察项目",{"key":24,"text":263,"correct":22},"履约保证金采用银行保函的，应当提供无条件地、不可撤销担保",{"key":28,"text":265,"correct":22},"房屋建筑和市政工程等工程勘察项目招标可以使用《建设工程勘察合同（示范文本）》",{"key":31,"text":267,"correct":26},"双方可协商约定专用条款",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1101444,"根据九部委的勘察合同的规定，发包人应向勘察人提供的资料不包括（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"坐标和标高",{"key":24,"text":275,"correct":22},"建筑总平面图",{"key":28,"text":277,"correct":26},"初步设计",{"key":31,"text":279,"correct":22},"人防设施的资料",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1101445,"根据九部委的勘察合同的规定，（ ）应对勘察场地的基础资料的准确性、可靠性负责。如地下进藏物等资料由勘察人收集时，费用由（ ）承担。",[284,286,288,290],{"key":20,"text":285,"correct":26},"发包人，发包人",{"key":24,"text":287,"correct":22},"勘察人，勘察人",{"key":28,"text":289,"correct":22},"发包人，勘察人",{"key":31,"text":291,"correct":22},"勘察人，发包人",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1101446,"发包人代表在授权范围内的行为由（ ）承担法律责任。",[296,298,299,300],{"key":20,"text":297,"correct":22},"发包人代表",{"key":24,"text":191,"correct":26},{"key":28,"text":193,"correct":22},{"key":31,"text":301,"correct":22},"勘察人的项目负责人",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1101447,"根据九部分的《标准勘察设计合同》，勘察项目负责人在情况紧急且无法与发包人取得联系时，可采取保证工程和人员生命财产安全的紧急措施，并在采取措施后（ ）内向发包人提交书面报告。",[306,308,310,312],{"key":20,"text":307,"correct":26},"24小时",{"key":24,"text":309,"correct":22},"48小时",{"key":28,"text":311,"correct":22},"7天",{"key":31,"text":313,"correct":22},"14天",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},1101448,"根据九部委发布的《标准勘察合同》，勘察费用实行（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":26},"发包人签证制度",{"key":24,"text":321,"correct":22},"勘察人签证制度",{"key":28,"text":323,"correct":22},"监理人签证制度",{"key":31,"text":325,"correct":22},"共同签订制度",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},1101449,"建设工程勘察中需要占用位于本工程区域内的临时用地，临时占地使用完毕后，（ ）应当清理并恢复临时占地。",[330,331,332,333],{"key":20,"text":191,"correct":22},{"key":24,"text":193,"correct":26},{"key":28,"text":195,"correct":22},{"key":31,"text":197,"correct":22},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1101450,"关于建设工程设计合同当事人的说法，正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"发包人必须是建设单位",{"key":24,"text":341,"correct":26},"承包人必须是法人",{"key":28,"text":343,"correct":22},"总承包人必须具有工程设计甲级或乙级综合资质",{"key":31,"text":345,"correct":22},"发包人必须具有自行组织招标的能力",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1101451,"根据九部委发布的《标准勘察合同》，项目负责人（ ）内不能履行职责的，应事先征得发包人同意，并委派代表代行其职责 。",[350,351,353,355],{"key":20,"text":307,"correct":22},{"key":24,"text":352,"correct":26},"2天",{"key":28,"text":354,"correct":22},"3天",{"key":31,"text":311,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1101453,"根据九部委《标准设计合同》的规定，以下有关发包人代表和项目负责人的说法，正确的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"发包人代表发出的指示，在征得发包人同意后，由发包人承担法律责任",{"key":24,"text":363,"correct":22},"设计单位应在合同签订后14天内指派项目负责人",{"key":28,"text":365,"correct":22},"发包人更换发包人代表应事先征得设计人同意",{"key":31,"text":367,"correct":26},"设计人更换项目负责人应事先征得发包人同意",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1101454,"由于地质勘察资料存在错误，导致图纸设计出现错误，则在设计合同中，此部分损失应由（ ）承担。",[372,373,375,377],{"key":20,"text":191,"correct":26},{"key":24,"text":374,"correct":22},"勘察单位",{"key":28,"text":376,"correct":22},"设计人",{"key":31,"text":231,"correct":22},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1101455,"根据九部委发布的标准设计合同，发包人应提前（ ）向设计人发出开始设计通知。因发包人原因造成合同签订之日起（ ）内未能发出开始设计通知的，设计人有权提出价格调整要求，或者解除合同。",[382,384,386,388],{"key":20,"text":383,"correct":22},"7天，60天",{"key":24,"text":385,"correct":26},"7天，90天",{"key":28,"text":387,"correct":22},"14天，60天",{"key":31,"text":389,"correct":22},"14天，90天",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},1101456,"根据九部委发布的《标准施工合同》，预付款担保的期限为（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"自预付款支付给承包人起生效，至签发工程移交证书日止",{"key":24,"text":397,"correct":22},"自预付款支付给承包人起生效，至发包人支付完成全部的预付款止。",{"key":28,"text":399,"correct":26},"自预付款支付给承包人起生效，发包人签发的进度付款证书说明已完全扣清预付款止。",{"key":31,"text":401,"correct":22},"自预付款支付给承包人起生效，至签发缺陷责任终止证书止",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},1101457,"根据九部委发布的《标准施工合同》，履约保函的担保期限为（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":26},"发包人和承包人签订合同之日起，至签发工程移交证书日止",{"key":24,"text":409,"correct":22},"发包人和承包人签订合同之日起，至签发工程缺陷责任证书日止",{"key":28,"text":411,"correct":22},"发包人和承包人签订合同之日起，至保修期结束",{"key":31,"text":413,"correct":22},"发包人和承包人签订合同之日起，至保修期结束后14或15天",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},1101458,"根据《施工合同标准文本》的规定，以下有关监理人的说法中，错误的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"在发包人授权范围内，负责发出指示、检查施工质量、控制进度等现场管理工作",{"key":24,"text":421,"correct":22},"在发包人授权范围内独立处理合同履行过程中的有关事项",{"key":28,"text":423,"correct":26},"承包人收到监理人发出的指示，必须得到发包人的认可，方可遵照执行",{"key":31,"text":425,"correct":22},"监理有权确定，无权决定",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1101459,"根据《施工合同标准文本》的规定，监理人在施工合同履行中（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"是独立的第三方",{"key":24,"text":433,"correct":22},"属于发包人一方的人员，相当于发包人的雇员",{"key":28,"text":435,"correct":26},"属于发包人一方的人员，但不同于发包人的雇员",{"key":31,"text":437,"correct":22},"属于建设行政主管部门的代理方",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},1101460,"某工程项目现场有甲、乙两个承包人同时施工。由于监理人的错误指示与协调能力不足，选成甲承包人受到乙承包人的干扰被迫暂停施工。关于甲承包人停工损失处理方式的说法，正确的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"自行负责",{"key":24,"text":445,"correct":22},"由发包人给予补偿，合同工期不予顺延",{"key":28,"text":447,"correct":22},"不予补偿，但应合理顺延合同工期",{"key":31,"text":449,"correct":26},"由发包人给予补偿，合同工期相应顺延",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1101461,"监理人审查承包人的施工组织设计和进度计划时，未能指出某单项工程的施工方案中存在的缺陷，承包人按计划进行该部分工程的施工，监理工程师因施工方案中存在重大安全隐患，发出暂停施工的指示，承包人因暂停施工产生损失提出索赔，认为工程师应承担连带责任，该事件索赔的处理方式应为（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"承包人承担工期和费用的损失",{"key":24,"text":457,"correct":22},"延长合同工期，费用不予补偿",{"key":28,"text":459,"correct":22},"工期不予顺延，给予相应的费用补偿",{"key":31,"text":461,"correct":22},"延长合同工期并给予相应的费用补偿",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1101462,"某工程采用的是不足额投保方式（保险金额少于工程实际价值）投保的工程一切险，工程受到保险事件的损害时，保险金不足以赔偿损失，其中临时性工程的损失差额由（ ）补偿。",[466,468,469,471],{"key":20,"text":467,"correct":22},"保险公司",{"key":24,"text":191,"correct":22},{"key":28,"text":470,"correct":26},"承包人",{"key":31,"text":472,"correct":22},"发包人和承包人共同",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},1101463,"某工程施工合同规定用调值公式法对建安工程价款进行结算，某分部工程预算进度款为300万元，可调整要素和数据如下表所示，则调值后该分部工程结算款为（ ）万元。",[477,479,481,483],{"key":20,"text":478,"correct":22},"321.63",{"key":24,"text":480,"correct":22},"303.54",{"key":28,"text":482,"correct":26},"298.74",{"key":31,"text":484,"correct":22},"280.65",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1101464,"根据《标准施工合同》，以下有关保险的说法，不正确的是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"建筑工程一切险一般情况下由承包人投保",{"key":24,"text":492,"correct":22},"施工设备保险，由承包人投保",{"key":28,"text":494,"correct":22},"进场材料与工程设备保险，双方可以协商确定投保主体",{"key":31,"text":496,"correct":26},"建筑工程一切险是由发包人和承包人共同投保",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},1101465,"某施工合同履行过程中，承包人发现由于公路管理部门的责任，连接施工场地与国道之间的道路不符合招标文件中说明的条件，则承包人由此增加的费用应由（ ）承担。",[501,503,504,505],{"key":20,"text":502,"correct":22},"公路管理部门",{"key":24,"text":470,"correct":22},{"key":28,"text":191,"correct":26},{"key":31,"text":506,"correct":22},"承包人与发包人共同",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1101466,"合同工期自（ ）起计算。",[511,513,515,517],{"key":20,"text":512,"correct":22},"监理人下达开工通知之日",{"key":24,"text":514,"correct":22},"实际开工之日",{"key":28,"text":516,"correct":22},"合同中约定的开工日",{"key":31,"text":518,"correct":26},"开工通知中载明的开工日",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":28,"analysis":33},1101467,"为了明确划分由于政策法规变化或市场物价浮动对合同价格影响的责任，《标准施工合同》中的通用条款规定的基准日期是指（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"投标截止日前第14天",{"key":24,"text":526,"correct":22},"投标截止日后第14天",{"key":28,"text":528,"correct":26},"投标截止日前第28天",{"key":31,"text":530,"correct":22},"投标截止日后第28天",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1101468,"根据《标准施工合同》，施工准备阶段设计交底应由（ ）组织。",[535,536,538,539],{"key":20,"text":376,"correct":22},{"key":24,"text":537,"correct":22},"监理人",{"key":28,"text":191,"correct":26},{"key":31,"text":540,"correct":22},"总承包人",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1101469,"监理人征得发包人同意后，应在开工日期（ ）向承包人发出开工通知。",[545,547,549,551],{"key":20,"text":546,"correct":22},"3天前",{"key":24,"text":548,"correct":26},"7天前",{"key":28,"text":550,"correct":22},"10天前",{"key":31,"text":552,"correct":22},"14天前",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":28,"analysis":33},1101471,"根据《施工合同标准文本》的规定，施工工期在12个月以上的工程，由于市场价格浮动对合同价格的影响，此风险应由（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"发包人承担",{"key":24,"text":560,"correct":22},"承包人承担",{"key":28,"text":562,"correct":26},"由发包人和承包人分担",{"key":31,"text":564,"correct":22},"发包人和承包人均不承担",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},1101472,"监理工程师已签字验收某隐蔽工程，覆盖后监理又怀疑该工程的质量，要求剥露重新检验，检验发现由于混凝土养护不当导致该部分工程质量确实不合格，则重检验的费用由（ ）承担。",[569,570,571,572],{"key":20,"text":191,"correct":22},{"key":24,"text":470,"correct":26},{"key":28,"text":537,"correct":22},{"key":31,"text":573,"correct":22},"材料采购方",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},1101473,"承包商按投标文件中承诺的数量和型号的施工机械投入到施工中。监理人发现承包商使用的机械影响了工程进度，要求承包商增加。根据《施工合同标准文本》，承包商对此指示（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"可以拒绝执行",{"key":24,"text":581,"correct":22},"应当执行，但可获得费用补偿",{"key":28,"text":583,"correct":22},"应当执行，但可获得费用和利润的补偿",{"key":31,"text":585,"correct":26},"应当执行，不能获得补偿",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1101474,"根据《标准施工合同》，发包人提供的材料和工程设备由承包人会同监理人验收后，由承包人负责接收，由（ ）承担施工现场内的二次搬运费。",[590,591,592,593],{"key":20,"text":191,"correct":22},{"key":24,"text":470,"correct":26},{"key":28,"text":537,"correct":22},{"key":31,"text":594,"correct":22},"材料供应商",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]