[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,2,50,2250,[13,34,46,58,70,82,94,106,118,130,141,153,165,177,189,201,213,225,237,249,259,270,282,293,305,317,326,334,346,354,366,378,390,402,409,419,431,443,455,467,479,491,502,510,522,534,546,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1100069,1,"单选题","由于简明施工合同适用于工期在12个月内的中小工程施工，是对标准施工合同简化的文本，通常由( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","发包人负责材料和设备的供应，承包人仅承担施工义务",true,{"key":24,"text":25,"correct":26},"B","承包人负责材料和设备的供应和施工义务",false,{"key":28,"text":29,"correct":26},"C","发包人负责设备的供应，承包人承担施工义务和材料供应",{"key":31,"text":32,"correct":26},"D","发包人负责材料的供应，承包人承担施工义务和设备供应","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1100074,"下列文件中，（ ）是合同组成文件中唯一需要发包人和承包人同时签字盖章的法律文书。",[38,40,42,44],{"key":20,"text":39,"correct":26},"履约保函",{"key":24,"text":41,"correct":26},"预付款保函",{"key":28,"text":43,"correct":22},"合同协议书",{"key":31,"text":45,"correct":26},"投标保证金",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1100078,"关于《标准施工招标文件》合同通用条款和专用条款的说法，正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"通用条款中适用于招标项目的条或款应在专用条款中体现",{"key":24,"text":53,"correct":22},"专用条款需要补充细化的内容应与通用条款的条或款的序号一致",{"key":28,"text":55,"correct":26},"通用条款可以根据工程实际由合同当事人协商调整",{"key":31,"text":57,"correct":26},"专用条款可以约定合同当事人放弃部分通用条款",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1100079,"下列合同文件中，列入《标准施工招标文件》合同附件格式的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"协议书、投标保函、履约保函",{"key":24,"text":65,"correct":26},"协议书、履约保函",{"key":28,"text":67,"correct":22},"协议书、预付款保函、履约保函",{"key":31,"text":69,"correct":26},"协议书、投标保函、预付款保函",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1100080,"根据《施工合同标准文本》的规定，以下有关监理人的说法中，错误的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"在发包人授权范围内，负责发出指示、检查施工质量、控制进度等现场管理工作",{"key":24,"text":77,"correct":26},"在发包人授权范围内独立处理合同履行过程中的有关事项",{"key":28,"text":79,"correct":22},"承包人收到监理人发出的重大指示，必须得到发包人的认可，方可遵照执行",{"key":31,"text":81,"correct":26},"在合同规定的权限范围内，独立处理或决定有关事项",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1100081,"某工程项目现场有甲、乙两个承包人同时施工。两个承包人均按监理人认可的施工进度计划施工，但甲承包人受到乙承包人的干扰被迫暂停施工。关于甲承包人停工损失处理方式的说法，正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":26},"自行负责",{"key":24,"text":89,"correct":26},"由发包人给予补偿，合同工期不予顺延",{"key":28,"text":91,"correct":26},"不予补偿，但应合理顺延合同工期",{"key":31,"text":93,"correct":22},"由发包人给予补偿，合同工期相应顺延",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1100082,"根据《施工合同标准文本》的规定，监理人在施工合同履行中( )。",[98,100,102,104],{"key":20,"text":99,"correct":26},"是独立的第三方",{"key":24,"text":101,"correct":26},"属于发包人一方的人员，相当于发包人的雇员",{"key":28,"text":103,"correct":22},"属于发包人一方的人员，但不同于发包人的雇员",{"key":31,"text":105,"correct":26},"属于建设行政主管部门的代理方",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1100083,"下列关于施工合同中监理人的地位，不正确的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":26},"监理人属于受发包人聘请的管理人，与承包人没有任何利益关系",{"key":24,"text":113,"correct":22},"监理人在施工合同的履行管理中是“独立的第三方”",{"key":28,"text":115,"correct":26},"监理人不是施工合同的当事人",{"key":31,"text":117,"correct":26},"在授权范围内独立工作",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1100085,"根据《标准施工合同》，关于监理人指示的说法，错误的是( )。",[122,124,126,128],{"key":20,"text":123,"correct":26},"发布指示前与当事人双方协商，尽量达成一致",{"key":24,"text":125,"correct":26},"监理人的指示无权免除合同约定的承包人义务",{"key":28,"text":127,"correct":26},"监理人的指示无权变更合同约定的承包人权利",{"key":31,"text":129,"correct":22},"监理人的指示有权变更合同约定的发包人义务",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1100087,"下列不属于施工合同中监理人职责的是（ ）。",[134,136,137,139],{"key":20,"text":135,"correct":22},"独立处理或决定有关事项，如签订分包合同、变更估价、索赔等",{"key":24,"text":75,"correct":26},{"key":28,"text":138,"correct":26},"承包人收到监理人发出的任何指示，视为已得到发包人的批准，应遵照执",{"key":31,"text":140,"correct":26},"在发包人授权范围内独立处理合同履行过程中的有关事项，行使通用条款规定的，以及具体施工合同专用条款中说明的权力",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},1100089,"下列施工合同文件中，解释顺序优先的是( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"中标通知书",{"key":24,"text":148,"correct":26},"投标书",{"key":28,"text":150,"correct":26},"施工合同专用条款",{"key":31,"text":152,"correct":26},"规范",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1100090,"根据《标准施工合同》，下列属于施工合同文件的是( )。",[157,159,161,163],{"key":20,"text":158,"correct":26},"招标文件",{"key":24,"text":160,"correct":22},"投标函及投标函附录",{"key":28,"text":162,"correct":26},"委托监理协议书",{"key":31,"text":164,"correct":26},"投标企业定额标准",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1100091,"根据《标准施工合同》，就图纸、通用合同条款和已标价的工程量清单而言，优先解释的顺序是( )。",[169,171,173,175],{"key":20,"text":170,"correct":26},"已标价的工程量清单→通用合同条款→图纸",{"key":24,"text":172,"correct":26},"已标价的工程量清单→图纸→通用合同条款",{"key":28,"text":174,"correct":26},"通用合同条款→已标价的工程量清单→图纸",{"key":31,"text":176,"correct":22},"通用合同条款→图纸→已标价的工程量清单",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":28,"analysis":33},1100092,"按照《建设工程施工合同(示范文本)》规定，当组成施工合同的各文件出现含糊不清或矛盾时，应按( )顺序解释。",[181,183,185,187],{"key":20,"text":182,"correct":26},"合同协议书、已标价的工程量清单、中标通知书",{"key":24,"text":184,"correct":26},"中标通知书、投标书及附件、合同履行中的变更协议",{"key":28,"text":186,"correct":22},"合同协议书、中标通知书、已标价的工程量清单",{"key":31,"text":188,"correct":26},"合同专用条款、合同通用条款、中标通知书",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1100093,"履行施工合同时双方达成一致的洽商书面协议的解释应排在( )。",[193,195,197,199],{"key":20,"text":194,"correct":26},"所有合同文件之后",{"key":24,"text":196,"correct":22},"中标通知书之前",{"key":28,"text":198,"correct":26},"投标书之后",{"key":31,"text":200,"correct":26},"图纸之后",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1100096,"通用条款规定以投标截止日前第28天定义为( )，作用是划分该日后由于政策法规的变化或市场物价浮动对合同价格影响的责任。",[205,207,209,211],{"key":20,"text":206,"correct":22},"基准日期",{"key":24,"text":208,"correct":26},"下达开工令",{"key":28,"text":210,"correct":26},"合同签字日",{"key":31,"text":212,"correct":26},"风险事件发生日",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1100098,"根据《标准施工合同》，采用公式法调价方式考虑市场价格浮动对合同价的影响，仅适用于工程量清单中的( )部分。",[217,219,221,223],{"key":20,"text":218,"correct":22},"单价支付",{"key":24,"text":220,"correct":26},"工程材料费用",{"key":28,"text":222,"correct":26},"总价支付",{"key":31,"text":224,"correct":26},"人工费用",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1100099,"某工程采用的是不足额投保方式投保的工程一切险，工程受到保险事件的损害时，保险金不足以赔偿损失，其中临时性工程的损失差额由( )补偿。",[229,231,233,235],{"key":20,"text":230,"correct":26},"保险公司",{"key":24,"text":232,"correct":26},"发包人",{"key":28,"text":234,"correct":22},"承包人",{"key":31,"text":236,"correct":26},"发包人和承包人共同",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1100100,"根据《标准施工合同》，承包人需要变动保险合同条款时，正确的处理方式是( )。",[241,243,245,247],{"key":20,"text":242,"correct":26},"直接与保险人协商一致后，通知发包人",{"key":24,"text":244,"correct":26},"直接与保险人协商一致后，通知监理人",{"key":28,"text":246,"correct":22},"应事先征得发包人同意，并通知监理人",{"key":31,"text":248,"correct":26},"应事先征得监理人同意，并通知发包人",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1100101,"根据《标准施工合同》，投保工程一切险的保险金额不足以赔偿实际损失时，差额部分应由()进行补偿。",[253,254,255,257],{"key":20,"text":232,"correct":26},{"key":24,"text":234,"correct":26},{"key":28,"text":256,"correct":22},"合同条款确定的该风险责任人",{"key":31,"text":258,"correct":26},"造价咨询机构",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":28,"analysis":33},1100102,"根据《标准施工合同》，施工准备阶段设计交底应由( )组织。",[263,265,267,268],{"key":20,"text":264,"correct":26},"设计人",{"key":24,"text":266,"correct":26},"监理人",{"key":28,"text":232,"correct":22},{"key":31,"text":269,"correct":26},"总承包人",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1100103,"以下( )专项施工方案，需要进行5人以上专家论证方案的安全性和可靠性。",[274,276,278,280],{"key":20,"text":275,"correct":22},"高大模板工程",{"key":24,"text":277,"correct":26},"浅基坑工程",{"key":28,"text":279,"correct":26},"大爆破工程",{"key":31,"text":281,"correct":26},"脚手架工程",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1100104,"( )专项施工方案需要进行5人以上专家论证方案的安全性和可靠性。",[286,288,290,291],{"key":20,"text":287,"correct":26},"高空作业工程",{"key":24,"text":289,"correct":22},"地下暗挖工程",{"key":28,"text":279,"correct":26},{"key":31,"text":292,"correct":26},"深水作业工程",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},1100105,"根据《标准施工合同》，“合同进度计划”是指( )。",[297,299,301,303],{"key":20,"text":298,"correct":26},"承包人投标书内提交的进度计划",{"key":24,"text":300,"correct":26},"施工准备阶段承包人编制的进度计划",{"key":28,"text":302,"correct":22},"承包人按监理人指示修改后经监理人批准的进度计划",{"key":31,"text":304,"correct":26},"承包人按监理人指示修改后经发包人批准的进度计划",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1100106,"施工准备阶段下列属于监理人职责的是( )。",[309,311,313,315],{"key":20,"text":310,"correct":22},"发出开工通知",{"key":24,"text":312,"correct":26},"办理征地拆迁",{"key":28,"text":314,"correct":26},"办理施工现场外道路的通行权",{"key":31,"text":316,"correct":26},"办理施工现场内道路的通行权",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1100111,"根据国家测绘基准、测绘系统和工程测量技术规范以及合同中对工程精度的要求，()负责测设施工控制网。",[321,322,323,324],{"key":20,"text":234,"correct":22},{"key":24,"text":232,"correct":26},{"key":28,"text":266,"correct":26},{"key":31,"text":325,"correct":26},"勘察人",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},1100112,"根据《标准施工合同》，施工合同文件包括（ ）。",[330,331,332,333],{"key":20,"text":158,"correct":26},{"key":24,"text":160,"correct":22},{"key":28,"text":162,"correct":26},{"key":31,"text":164,"correct":26},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1100113,"下列关于中标通知书的说法，错误的是()。",[338,340,342,344],{"key":20,"text":339,"correct":26},"中标通知书是招标人接受中标人的书面承诺文件",{"key":24,"text":341,"correct":22},"中标价作为该投标人评标的基准价格",{"key":28,"text":343,"correct":26},"项目经理在要求履行合同时必须到位",{"key":31,"text":345,"correct":26},"项目经理的名称可以不是投标文件中说明的人选",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1100114,"按照《建设工程施工合同》规定，()在施工过程中负责管理施工控制网点。",[350,351,352,353],{"key":20,"text":234,"correct":22},{"key":24,"text":232,"correct":26},{"key":28,"text":266,"correct":26},{"key":31,"text":325,"correct":26},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1100116,"订立施工合同时通用条款规定的基准日期指投标截止时间前（ ）天，规定基准日期的作用是划分该日后由于政策法规的变化或市场物价浮动对合同价格影响的责任。",[358,360,362,364],{"key":20,"text":359,"correct":26},"21",{"key":24,"text":361,"correct":26},"24",{"key":28,"text":363,"correct":22},"28",{"key":31,"text":365,"correct":26},"30",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1100118,"按照《建设工程安全生产管理条例》的规定，在施工组织设计中应针对深基坑工程、地下暗挖工程、高大模板工程、高空作业工程、深水作业工程、大爆破工程的施工编制专项施工方案。对于前3项危险|生较大的分部分项工程的专项施工，还需经（ ）人以上专家论证方案的安全性和可靠性。",[370,372,374,376],{"key":20,"text":371,"correct":26},"3",{"key":24,"text":373,"correct":22},"5",{"key":28,"text":375,"correct":26},"7",{"key":31,"text":377,"correct":26},"9",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1100119,"某工程施工合同约定，根据价格调整公式调整合同价，可调值部分的费用类型、占合同总价的比例和相关价格指数见下表，若结算当月完成的合同额为1000万元，则调整后的合同金额为（ ）万元。",[382,384,386,388],{"key":20,"text":383,"correct":26},"896",{"key":24,"text":385,"correct":22},"1050",{"key":28,"text":387,"correct":26},"1017",{"key":31,"text":389,"correct":26},"1000",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},1100120,"根据《标准施工招标文件》的施工合同文本通用合同条款，无论是由承包人还是发包人办理工程险和第三者责任保险，均必须以（ ）投保，以保障双方均有出现保险范围内的损失时，可从保险公司获得赔偿。",[394,396,398,400],{"key":20,"text":395,"correct":26},"发包人名义",{"key":24,"text":397,"correct":26},"承包人名义",{"key":28,"text":399,"correct":22},"发包人和承包人的共同名义",{"key":31,"text":401,"correct":26},"承包人和保证人的共同名义",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":404,"answer":31,"analysis":33},1100123,[405,406,407,408],{"key":20,"text":158,"correct":26},{"key":24,"text":164,"correct":26},{"key":28,"text":162,"correct":26},{"key":31,"text":160,"correct":22},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1100125,"根据《标准施工招标文件》，“合同进度计划”是指（ ）。",[413,414,416,417],{"key":20,"text":304,"correct":26},{"key":24,"text":415,"correct":22},"承包人按监理人指示修改后经监理人批准的进度汁划",{"key":28,"text":298,"correct":26},{"key":31,"text":418,"correct":26},"承包人在施工准备阶段编制的进度计划",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1100126,"约定的开工日期已届至，此时发包人开工前的配合工作已完成，但承包人的开工准备还不满足开工条件，则下列说法不正确的是（）。",[423,425,427,429],{"key":20,"text":424,"correct":26},"按时发出开工通知",{"key":24,"text":426,"correct":22},"合同工期予以顺延",{"key":28,"text":428,"correct":26},"提前7天向承包人发出开工通知",{"key":31,"text":430,"correct":26},"以开工通知中载明的开工日为开工日期",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1100127,"某项目承包人经发包人同意于7 月10 日进场施工后，监理人于7 月20 日发出开工通知，承包人于7 月21 日收到该通知，通知中说明开工日期为8 月10 日，则该项目的开工日期应为（）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"7月10日",{"key":24,"text":438,"correct":26},"7月20日",{"key":28,"text":440,"correct":26},"7月21日",{"key":31,"text":442,"correct":26},"8月10日",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1100128,"发包人应及时完成施工场地的征用、移民、拆迁工作并按时移交，关于施工场地的移交说法正确的是（）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"可以一次移交完成，也可以分次移交",{"key":24,"text":450,"correct":26},"只能一次移交完成，不可以分次移交",{"key":28,"text":452,"correct":26},"只能分次移交完成，不可以一次移交",{"key":31,"text":454,"correct":26},"以不影响单位工程的施工为原则",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},1100129,"关于建设工程施工准备阶段的合同管理中，发包人、承包人、监理人各自的义务和职责表述正确的是（）。",[459,461,463,465],{"key":20,"text":460,"correct":26},"移交施工场地是发包人的义务，必须一次移交完成",{"key":24,"text":462,"correct":26},"建立完善的质量检查制度是承包人的义务，应在施工场地设置专门的质量检查机构，配备兼职质量检查人员",{"key":28,"text":464,"correct":26},"监理人未按时对承包人提出的施工进度计划作出批复或提出修改意见，则该进度计划视为未得到批准",{"key":31,"text":466,"correct":22},"监理人征得发包人同意后，应在约定的开工日期7天前向承包人发出开工通知，合同工期自开工通知中载明的开工日起计算",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},1100130,"根据《标准施工合同》，监理人在施工准备阶段的职责是（）。",[471,473,475,477],{"key":20,"text":472,"correct":26},"按专用条款约定的时间向承包人无条件发出开工通知",{"key":24,"text":474,"correct":26},"在开工日期15日前向承包人发出开工通知",{"key":28,"text":476,"correct":22},"批准或要求修改承包人报送的施工进度计划",{"key":31,"text":478,"correct":26},"组织编制施工“合同进度计划”",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1100131,"某施工项目适用简明施工合同，基准日期后，合同履行期间市场价格浮动对施工成本造成影响，关于该合同价格调整的说法正确的是（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"不考虑合同价格调整",{"key":24,"text":486,"correct":26},"采用公式法调整合同价款",{"key":28,"text":488,"correct":26},"调价公式中的可调因素价格指数来源于基准日的价格",{"key":31,"text":490,"correct":26},"调整价格的方法仅适用于工程量清单中按单价支付部分的工程款",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":28,"analysis":33},1100132,"某项目监理人于7 月10 日发出开工通知，承包人于7 月11 日收到该通知，通知中说明开工日期为8 月1 日，但承包人的开工准备还不满足开工条件，直至8 月20 日才具备开工条件，则该项目的开工日期应为（）。",[495,496,498,500],{"key":20,"text":436,"correct":26},{"key":24,"text":497,"correct":26},"7月11日",{"key":28,"text":499,"correct":22},"8月1日",{"key":31,"text":501,"correct":26},"8月20日",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},1100133,"某项目监理人于7 月10 日发出开工通知，承包人于7 月11 日收到该通知，通知中说明开工日期为8 月1 日，但因拆迁纠纷直至8 月20 日才具备开工条件，则该项目的开工日期应为（）。",[506,507,508,509],{"key":20,"text":436,"correct":26},{"key":24,"text":497,"correct":26},{"key":28,"text":499,"correct":26},{"key":31,"text":501,"correct":22},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1100134,"约定的开工日期已届至但发包人开工前的配合工作未完成，相应的后果责任包括（）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"延迟开工，合同工期顺延，赔偿承包人的相应损失",{"key":24,"text":517,"correct":26},"延迟开工，合同工期不顺延，赔偿承包人的相应损失",{"key":28,"text":519,"correct":26},"延迟开工，合同工期顺延，无需赔偿承包人的相应损失",{"key":31,"text":521,"correct":26},"按时开工，合同工期顺延，赔偿承包人的相应损失",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1100135,"按照标准施工合同通用条款的规定，如果监理人没有在约定时间内对承包人提交的进度计划后予以批复或提出修改意见，则视为（）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"监理人已批准，对承包人.发包人产生约束力，但监理人不受其约束",{"key":24,"text":529,"correct":22},"监理人已批准，将作为判定是否顺延合同工期的主要依据",{"key":28,"text":531,"correct":26},"监理人未批准，承包人应修改进度计划",{"key":31,"text":533,"correct":26},"监理人未批准，承包人应等待监理人的进一步指示",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},1100137,"下列情形中不考虑合同价格调整的是（）。",[538,540,542,544],{"key":20,"text":539,"correct":26},"法律政策.规范标准的变化导致短期施工合同施工成本发生约定以外的增减",{"key":24,"text":541,"correct":26},"法律政策.规范标准的变化导致长期施工合同施工成本发生约定以外的增减",{"key":28,"text":543,"correct":22},"市场价格浮动对短期施工合同施工成本造成影响",{"key":31,"text":545,"correct":26},"市场价格浮动对长期施工合同施工成本造成影响",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},1100138,"在施工合同履行中，发包人按合同约定购买了玻璃，现场交货双方共同清点检验接收后交承包人的仓库保管员保管，当施工需要使用时发现部分玻璃丢失，则应由( )。",[550,552,554,556],{"key":20,"text":551,"correct":26},"保管员负责赔偿损失",{"key":24,"text":553,"correct":26},"发包人承担损失责任",{"key":28,"text":555,"correct":22},"承包人负责赔偿损失",{"key":31,"text":557,"correct":26},"发包人与承包人共同承担损失责任",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1100139,"发包人采购的建筑材料运抵施工现场，交由承包人保管前，应经过( )共同验收。",[562,564,566,568],{"key":20,"text":563,"correct":26},"发包人与监理人",{"key":24,"text":565,"correct":22},"监理人与承包人",{"key":28,"text":567,"correct":26},"发包人与承包人",{"key":31,"text":569,"correct":26},"监理人与供货人",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},1100140,"承包商运抵现场的施工设备，该设备已经使用完毕，后期施工不再使用该设备，正确的做法为( )。",[574,576,578,580],{"key":20,"text":575,"correct":26},"承包人可自行调运到其他工地",{"key":24,"text":577,"correct":26},"至竣工结束，不得运出工地",{"key":28,"text":579,"correct":22},"经过监理人根据合同进度计划审核同意后，可以提前撤出工地",{"key":31,"text":581,"correct":26},"经过业主书面同意后，可以提前撤出工地",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":28,"analysis":33},1100141,"依据施工合同示范文本的规定，由发包人采购材料交付承包人保管时，下列表述中正确的是( )。",[586,588,590,592],{"key":20,"text":587,"correct":26},"材料运抵施工现场后，工程师与发包人共同清点",{"key":24,"text":589,"correct":26},"到货材料的种类与合同约定不符，承包人应该代为调剂串换",{"key":28,"text":591,"correct":22},"供货商延误到货影响施工时，发包人应赔偿承包人的损失",{"key":31,"text":593,"correct":26},"到货材料数量多于合同的约定时，承包人应将多余部分运出工地",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]