[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":570},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,17,50,2250,[13,34,46,58,70,82,91,99,111,123,135,147,155,167,176,184,192,201,213,225,237,248,260,270,282,292,304,316,328,340,352,364,376,388,398,407,419,431,441,450,458,469,477,489,500,512,524,536,548,558],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1101018,1,"单选题","FIDIC系列中，《施工合同条件》中，工程师在收到索赔报告或证明资料后（）天内，或在工程师可能建议并经承包商认可的其他期限内，做出回应。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","7",false,{"key":24,"text":25,"correct":22},"B","14",{"key":27,"text":28,"correct":22},"C","28",{"key":30,"text":31,"correct":32},"D","42",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1101019,"FIDIC系列中，《施工合同条件》中，关于争端处理的说法错误的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":32},"DAAB必须由具有适当资格的三人组成",{"key":24,"text":41,"correct":22},"合同争端可按照规定，由争端避免\u002F裁决委员会裁决",{"key":27,"text":43,"correct":22},"业主和承包商双方应在规定的日期前联合任命DAAB",{"key":30,"text":45,"correct":22},"DAAB由业主、承包商双方联合任命、分摊酬金",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1101020,"FIDIC系列合同中，称为&ldquo;绿皮书&rdquo;的是（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"《施工合同条件》",{"key":24,"text":53,"correct":32},"《简明合同格式》",{"key":27,"text":55,"correct":22},"《设计采购施工（EP)\u002F交钥匙工程合同条件》",{"key":30,"text":57,"correct":22},"《设计—建造与交钥匙工程合同条件》",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1101022,"FIDIC合同系列中，《施工合同条件》中，属于工程师的主要责任和义务的是（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"做好项目资金安排",{"key":24,"text":65,"correct":22},"给予承包商现场占有权",{"key":27,"text":67,"correct":32},"确定确认合同款支付、工程变更、试验、验收等专业事项等",{"key":30,"text":69,"correct":22},"工程师还可以向助手指派任务和委托部分权力，工程师有权修改合同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1101023,"FIFIC系列合同中，下列选项中适用于《施工合同条件》的是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":32},"适用于传统的\"设计一招标一建造\"模式，承包商按照业主提供的设计进行施工",{"key":24,"text":77,"correct":22},"适用于承包商以交钥匙方式进行设计、采购和施工的总承包",{"key":27,"text":79,"correct":22},"适合于承包商按发包人设计进行施工的房屋建筑和土木工程的施工项目",{"key":30,"text":81,"correct":22},"适用于投资金额相对较小、工期短或技术简单，或重复性的工程项目施工",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1101025,"FIDIC系列中，《施工合同条件》中，如果承包商提交接收申请28 天内，工程师仍未答复，则若工程达到规定条件，即视为工程已在工程师收到承包商的申请通知后的第（）天竣工，且被视为已颁发了接收证书。",[86,87,88,90],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":89,"correct":22},"24",{"key":30,"text":28,"correct":22},{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},1101026,"如果任一方对DAAB 的决定不满，可以在收到该决定通知后（）天内，将其不满向另一方发出通知。",[95,96,97,98],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":22},{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":24,"analysis":33},1101031,"从开工直到颁发工程接收证书之日止的时段，工程照管的责任应由（ ）承担。",[103,105,107,109],{"key":20,"text":104,"correct":22},"发包人",{"key":24,"text":106,"correct":32},"承包人",{"key":27,"text":108,"correct":22},"工程师",{"key":30,"text":110,"correct":22},"争端避免裁决委员会",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":24,"analysis":33},1101032,"根据FIDIC《施工合同条件》，可以调整合同约定单价的条件之一是：与工程量清单中估计工程量相比，实际计量的工程量变化超过（ ）。",[115,117,119,121],{"key":20,"text":116,"correct":22},"5%",{"key":24,"text":118,"correct":32},"10%",{"key":27,"text":120,"correct":22},"15%",{"key":30,"text":122,"correct":22},"20%",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":24,"analysis":33},1101033,"在接收证书颁发前业主确实使用的工程，视为自（ ）起已被业主接收。",[127,129,131,133],{"key":20,"text":128,"correct":22},"开工之日",{"key":24,"text":130,"correct":32},"开始使用之日",{"key":27,"text":132,"correct":22},"缺陷责任期结束之日",{"key":30,"text":134,"correct":22},"办理接收证书之日",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":27,"analysis":33},1101034,"以下有关不可预见的物质条件，说法正确的是（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"是指承包商在工程实施中遇见的外界自然条件，不包括人为的条件",{"key":24,"text":142,"correct":22},"不可预见的特质条件，包括地下和水文条件和气候条件",{"key":27,"text":144,"correct":32},"因不可遇见的特质条件使承包商遭受损失，承包商有权提出工期索赔和费用索赔，但不能索赔利润",{"key":30,"text":146,"correct":22},"因不可遇见的特质条件使承包商遭受损失，承包商有权提出工期索赔，但不能索赔费用和利润",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":30,"analysis":33},1101036,"银皮书规定，业主在收到经双方商定的最终报表和书面结清证明后（）天内，向承包商支付应付的最终款额。",[151,152,153,154],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":89,"correct":22},{"key":30,"text":31,"correct":32},{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":27,"analysis":33},1101038,"《设计采购施工（EP C）\u002F交钥匙合同条件》中，合同文件的组成及其优先次序说法正确的是（）",[159,161,163,165],{"key":20,"text":160,"correct":22},"专用合同条款优于合同协议书",{"key":24,"text":162,"correct":22},"通用合同条款优于专用合同条款",{"key":27,"text":164,"correct":32},"明细表优于投标书",{"key":30,"text":166,"correct":22},"投标书优于通用合同条款",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":27,"analysis":33},1101039,"银皮书规定，当原定进度计划与实际进度不相符时，承包商还应提交一份修订的进度计划，除非业主在收到进度计划后的（）天内向承包商发出通知，指出其不符合合同要求。",[171,172,173,175],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":174,"correct":32},"21",{"key":30,"text":28,"correct":22},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},1101040,"银皮书规定，承包商应在开工日期后（）天内向业主提交一份进度计划。",[180,181,182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":30,"analysis":33},1101041,"对工程的期中付款，银皮书规定，业主应在收到有关报表和证明文件后的（）天内向承包商发出关于报表中业主不同意支付的任何项目的通知，井附详细说明，对符合合同要求的应付款项，则不应扣发。",[188,189,190,191],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":89,"correct":22},{"key":30,"text":28,"correct":32},{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":24,"analysis":33},1101042,"《设计采购施工（EP C）\u002F交钥匙合同条件》中，如果业主方希望替换任何已任命的业主代表，应在不少于（）天前将替换人员的姓名、地址、职责、权力及任命日期通知给承包商。",[196,197,198,199],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":89,"correct":22},{"key":30,"text":200,"correct":22},"48",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1101044,"按ECC合同文本，关于主要选项条款的说法，下列不正确的是( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"选项A：带有分项工程表的标价合同",{"key":24,"text":208,"correct":22},"选项B：带有工程量清单的标价合同",{"key":27,"text":210,"correct":32},"选项C：带有分项工程表的标价合同",{"key":30,"text":212,"correct":22},"选项D：带有工程量清单的目标合同",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1101045,"NEC施工合同文本有6个不同计价模式，其中选项E是指( )。",[217,219,221,223],{"key":20,"text":218,"correct":22},"带有分项工程表的标价合同",{"key":24,"text":220,"correct":22},"带有工程量清单的目标合同",{"key":27,"text":222,"correct":32},"成本补偿合同",{"key":30,"text":224,"correct":22},"管理合同",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1101046,"在NEC合同文本中，目标合同( )。",[229,231,233,235],{"key":20,"text":230,"correct":22},"适用于签订合同时价格已经确定的合同",{"key":24,"text":232,"correct":32},"适用于拟建工程范围在订立合同时还没有完全界定",{"key":27,"text":234,"correct":22},"适用于工程范围的界定尚不明确，甚至用目标合同为基础也不够充分，而且又要求尽早动工的情况",{"key":30,"text":236,"correct":22},"适用于施工管理承包，管理承包商与雇主签订管理承包合同",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1101047,"ECC合同，项目经理应在早期警告会议上对所研究的建议和做出的决定记录在案，并将记录发给（）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"雇主",{"key":24,"text":244,"correct":32},"承包商",{"key":27,"text":246,"correct":22},"分包商",{"key":30,"text":108,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1101051,"ECC 共同预警的最重要的机制是（）",[252,254,256,258],{"key":20,"text":253,"correct":32},"早期警告",{"key":24,"text":255,"correct":22},"补偿事件",{"key":27,"text":257,"correct":22},"激励事件",{"key":30,"text":259,"correct":22},"协调沟通",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1101052,"根据ECC合同，发生了非承包商的过失原因而引起的事件，需要核算补偿，若变更由承包商提供的工程信息，则该补偿事件的影响按对（ ）最有利的解释进行计价。",[264,266,267,268],{"key":20,"text":265,"correct":32},"业主",{"key":24,"text":244,"correct":22},{"key":27,"text":108,"correct":22},{"key":30,"text":269,"correct":22},"善意第三方",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1101054,"一份施工合同采用了英国NEC合同文本，其中的主要选项条款为选项 E，则下列（ ）论述正确。",[274,276,278,280],{"key":20,"text":275,"correct":22},"该合同是固定总价合同",{"key":24,"text":277,"correct":22},"承包商的投标价作为目标成本",{"key":27,"text":279,"correct":32},"工程成本部分实报实销，按合同约定的工程成本一定百分比作为承包商的收入",{"key":30,"text":281,"correct":22},"该合同的乙方，可与若干施工分包商订立分包合同，确定的分包合同履行费用由雇主支付",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1101055,"根据NEC《工程施工合同》，对于签订合同时价格已经确定的合同属于（ ）。",[286,288,290,291],{"key":20,"text":287,"correct":22},"目标合同",{"key":24,"text":289,"correct":32},"标价合同",{"key":27,"text":224,"correct":22},{"key":30,"text":222,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1101056,"根据美国AIA标准合同文本，以下有关CM合同的论述，正确的是( )。",[296,298,300,302],{"key":20,"text":297,"correct":22},"CM承包商可以赚取总包、分包合同的差价",{"key":24,"text":299,"correct":32},"风险型CM合同一般采用成本加酬金的计价方式",{"key":27,"text":301,"correct":22},"CM承包商可以负责设计工作",{"key":30,"text":303,"correct":22},"CM承包商对雇主委托范围的工作，必须全部由分包商实施",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1101057,"根据美国AIA标准合同文本，关于CM合同的说法错误的是( )。",[308,310,312,314],{"key":20,"text":309,"correct":22},"CM合同属于管理承包合同",{"key":24,"text":311,"correct":32},"代理型CM合同需要承担项目的实施风险",{"key":27,"text":313,"correct":22},"依据雇主委托项目实施阶段管理的范围和管理责任不同，分为代理型CM合同和风险型CM合同两类",{"key":30,"text":315,"correct":22},"风险型CM合同，其承包商应非常熟悉施工工艺和方法",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":27,"analysis":33},1101058,"根据美国AIA标准合同文件，CM合同中与雇主订立合同的当事人是( )。",[320,322,324,326],{"key":20,"text":321,"correct":22},"建筑师",{"key":24,"text":323,"correct":22},"专业咨询机构",{"key":27,"text":325,"correct":32},"施工承包商",{"key":30,"text":327,"correct":22},"承担分包工作的分包商",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1101059,"下列选项中属于风险型CM的合同计价方式的是（）。",[332,334,336,338],{"key":20,"text":333,"correct":32},"成本加酬金的计价方式",{"key":24,"text":335,"correct":22},"固定总价方式",{"key":27,"text":337,"correct":22},"固定单价方式",{"key":30,"text":339,"correct":22},"工程量清单方式",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":30,"analysis":33},1101061,"根据美国AIA标准合同文本，CM承包商提出GMP，GMP的含义是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"管理承包",{"key":24,"text":347,"correct":22},"合同承包总价",{"key":27,"text":349,"correct":22},"风险型CM模式",{"key":30,"text":351,"correct":32},"保证工程最大费用",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},1101063,"在AIA合同中的C序列，是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"雇主与施工承包商、CM承包商、供应商之间的合同",{"key":24,"text":359,"correct":22},"总承包商与分包商之间合同的文本",{"key":27,"text":361,"correct":32},"建筑师与专业咨询机构之间合同的文本",{"key":30,"text":363,"correct":22},"雇主与建筑师之间合同的文本",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},1101064,"FIDIC标准合同文本中的（ ），适用于各类大型或较复杂的工程或房建项目，尤其适用于传统的“设计——招标——建造”模式。 A.《施工合同条件》(1999年版，2017年第2版)",[368,370,372,374],{"key":20,"text":369,"correct":32},"《生产设备和设计一施工合同条件》(1999年第1版，2017年第2版)",{"key":24,"text":371,"correct":22},"《设计采购施工(EP",{"key":27,"text":373,"correct":22},"／交钥匙工程合同条件》(1999年第1版，2017年第2版)",{"key":30,"text":375,"correct":22},"《简明合同格式》(1999年第1版)",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1101065,"风险型CM合同采用（ ）的计价方式，成本部分由业主承担，CM承包商获取约定的酬金。",[380,382,384,386],{"key":20,"text":381,"correct":32},"成本加酬金",{"key":24,"text":383,"correct":22},"成本加费用",{"key":27,"text":385,"correct":22},"酬金加费用",{"key":30,"text":387,"correct":22},"成本加奖金",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":30,"analysis":33},1101066,"FIDIC系列合同中，由承包商按照业主要求进行设计、提供设备并施工安装的机械、电气、房建等工程的合同，采用总价合同，业主委托工程师管理合同，由工程师监管承包商设备的现场安装以及签证支付的是（）",[392,393,394,396],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":395,"correct":22},"《土木工程施工合同条件》",{"key":30,"text":397,"correct":32},"《生产设备和设计——施工合同条件》",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},1101067,"FIDIC 系列合同条件中最具代表性的文本是指（）",[402,403,404,405],{"key":20,"text":51,"correct":32},{"key":24,"text":53,"correct":22},{"key":27,"text":395,"correct":22},{"key":30,"text":406,"correct":22},"《设计施工和运营合同条件》",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1101068,"工程施工合同（EC C）中，（）是对核心条款的补充和细化。",[411,413,415,417],{"key":20,"text":412,"correct":22},"合同条款",{"key":24,"text":414,"correct":32},"主要选项条款",{"key":27,"text":416,"correct":22},"次要选项条款",{"key":30,"text":418,"correct":22},"基础条款",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1101070,"英国NEC合同文本中规定，（ ）都可以提出召开早期警告会议，并在对方同意后邀请其他方出席。",[423,425,427,429],{"key":20,"text":424,"correct":22},"项目经理和分包商",{"key":24,"text":426,"correct":32},"项目经理和承包商",{"key":27,"text":428,"correct":22},"承包商和公用事业部门",{"key":30,"text":430,"correct":22},"分包商和地方行政机关代表",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":30,"analysis":33},1101071,"FIDIC系列合同，《施工合同条件》中承包商的试验，工程师应提前至少（ ）小时将其参加试验的意向通知承包商。",[435,437,438,439],{"key":20,"text":436,"correct":22},"12",{"key":24,"text":89,"correct":22},{"key":27,"text":200,"correct":22},{"key":30,"text":440,"correct":32},"72",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":30,"analysis":33},1101072,"对工程的期中付款，银皮书规定，业主在收到承包商的报表和证明文件后的（）天内支付每期报表的应付款额。",[445,446,447,448],{"key":20,"text":21,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":449,"correct":32},"56",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1101073,"FIDIC合同系列中，《施工合同条件》中，如果承包商在被要求对测量记录进行审查后（）天内未向工程师发出此类通知，则视为记录准确予以认可。",[454,455,456,457],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":89,"correct":22},{"key":30,"text":200,"correct":22},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":30,"analysis":33},1101074,"FIDIC系列合同中，《设计一建造与交钥匙工程合同条件》(1995 年第1版) ，又称\"橘皮书\"适用于（）",[462,464,465,467],{"key":20,"text":463,"correct":22},"适用于承包商与专业工程施工分包商订立的施工合同",{"key":24,"text":81,"correct":22},{"key":27,"text":466,"correct":22},"合于承包商按发包人设计进行施工的房屋建筑和土木工程的施工项目",{"key":30,"text":468,"correct":32},"适用于由承包商根据业主要求设计和施工的工程项目和房建项目",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":30,"analysis":33},1101075,"FIDICX系列合同中，在《施工合同条件》模式下，项目主要参与方不包括（）",[473,474,475,476],{"key":20,"text":265,"correct":22},{"key":24,"text":244,"correct":22},{"key":27,"text":108,"correct":22},{"key":30,"text":246,"correct":32},{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1101076,"FIDIC系列合同中，《设计一建造与交钥匙工程合同条件》(1995 年第1 版) ，又称\"橘皮书\"适用于由承包商根据业主要求设计和施工的工程项目和房建项目，采用（）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"单价合同",{"key":24,"text":484,"correct":32},"总价合同",{"key":27,"text":486,"correct":22},"成本加酬金合同",{"key":30,"text":488,"correct":22},"成本加固定比例合同",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1101077,"FIDIC系列合同，《施工合同条件》，不属于业主的主要责任和义务的是（）",[493,495,496,498],{"key":20,"text":494,"correct":32},"办理工程保险",{"key":24,"text":63,"correct":22},{"key":27,"text":497,"correct":22},"委托任命工程师代表业主进行合同管理",{"key":30,"text":499,"correct":22},"提供业主方应提供的保障、物资",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":30,"analysis":33},1101078,"（2020年真题）根据FIDIC《施工合同条件》，属于工程师职责和权力的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"提供履约担保证书",{"key":24,"text":507,"correct":22},"及时提供设计图纸",{"key":27,"text":509,"correct":22},"给予承包商现场进入权",{"key":30,"text":511,"correct":32},"接收并处理索赔报告",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1101079,"（2020年真题）根据FIDIC《设计采购施工（EP C）交钥匙工程合同条件》,合同文件的优先解释顺序是（ ） ．",[516,518,520,522],{"key":20,"text":517,"correct":22},"通用合同条件-专用合同条件- -投标书- 业主要求",{"key":24,"text":519,"correct":32},"专用合同条件- -通用合同条件- -业主要求一 投标书",{"key":27,"text":521,"correct":22},"通用合同条件- -专用合同条件- -业主要求一投标书",{"key":30,"text":523,"correct":22},"专用合同条件- -通 用合同条件一投标书- -业主要求",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":30,"analysis":33},1101080,"（2020年真题）根据美国建筑师学会（AIA发布的IPD （集成项目交付）合同，关于争端和索赔的说法，正确的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"争端应提交合同各方没有任何利害关系的争端裁决委员会裁决",{"key":24,"text":531,"correct":22},"争端应提交业主委托任命的代表业主进行合同管理的工程师哉决",{"key":27,"text":533,"correct":22},"合同各方应通过合同中约定的早期警告和补偿事件机制处理索赔",{"key":30,"text":535,"correct":32},"合同各方应放弃除故意违约等情形外的对合同任何一方的索赔",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},1101082,"固定单价合同适用于（ ）的项目。",[540,542,544,546],{"key":20,"text":541,"correct":22},"工期长，工程量变化幅度较大",{"key":24,"text":543,"correct":22},"工期长，工程量变化幅度不太大",{"key":27,"text":545,"correct":32},"工期短，工程量变化幅度不太大",{"key":30,"text":547,"correct":22},"工期短，工程量变化幅度较大",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},1101083,"采用工程总承包模式的大型建设工程项目，建设周期三年，其合同计价方式一般采 用（ ）。",[552,554,555,556],{"key":20,"text":553,"correct":22},"固定总价合同",{"key":24,"text":482,"correct":22},{"key":27,"text":486,"correct":22},{"key":30,"text":557,"correct":32},"变动总价合同",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1101084,"关于单价合同中承包商风险的说法，正确的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"单价合同中承包商存在工程量方面的风险",{"key":24,"text":565,"correct":32},"固定单价合同条件下，承包商存在通货膨胀带来的单价上涨的风险",{"key":27,"text":567,"correct":22},"单价合同中承包商存在投标总价过低方面的风险",{"key":30,"text":569,"correct":22},"变动单价合同下，承包商存在通货膨胀带来的单价上涨的风险",[571,574,577,580,583,586],{"id":15,"name":572,"category":7,"favorite":573},"领导干部任职前廉政法规知识测试题",92,{"id":575,"name":576,"category":7,"favorite":15},595,"建筑结构与设备",{"id":578,"name":579,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":581,"name":582,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":584,"name":585,"category":7,"favorite":8},534,"BIM工程师",{"id":587,"name":585,"category":7,"favorite":8},535]