[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,16,50,2250,[13,34,46,58,68,80,92,104,116,128,137,149,159,171,183,195,207,215,224,236,244,256,268,280,292,304,316,328,340,352,361,373,385,394,406,418,430,442,454,466,478,490,502,514,526,538,550,559,571,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1100960,1,"单选题","设计施工阶段总承包合同履行过程中，因发包人原因造成监理人未能在合同签订之日起（ ）d内发出开始工作通知，承包人有权提出价格调整要求，或者解除合同。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","60",false,{"key":24,"text":25,"correct":22},"B","75",{"key":27,"text":28,"correct":22},"C","80",{"key":30,"text":31,"correct":32},"D","90",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1100961,"在设计施工阶段不论何种原因造成工程的实际进度与合同进度计划不符时，承包人可以在专用条款约定的期限内向监理人提交修订合同进度计划的申请报告，并附有关措施和相关资料，报（ ）批准。",[38,40,42,44],{"key":20,"text":39,"correct":22},"发包人",{"key":24,"text":41,"correct":32},"监理人",{"key":27,"text":43,"correct":22},"本级建设行政主管部门",{"key":30,"text":45,"correct":22},"发包人与监理人共同",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1100963,"根据《标准设计施工总承包合同》，合同进度计划是指（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"承包人编制的合同项目的进度计划",{"key":24,"text":53,"correct":22},"监理人编制的合同项目的进度计划",{"key":27,"text":55,"correct":32},"承包人编制的并经监理人批复的合同项目进度计划",{"key":30,"text":57,"correct":22},"监理人编制的并经发包人批复的合同项目进度计划",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1100965,"对于大型项目，竣工后试验由（ ）进行。",[62,63,65,67],{"key":20,"text":39,"correct":22},{"key":24,"text":64,"correct":22},"承包人",{"key":27,"text":66,"correct":32},"发包人或承包人",{"key":30,"text":41,"correct":22},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":30,"analysis":33},1100966,"设计施工总承包合同模式下，承包人对总监理工程师授权的监理人员发出的指示有疑问时，可在该指示发出的（）小时内向总监理工程师提出书面异议，总监理工程师应在（）小时内对该指示予以确认、更改或撤销。",[72,74,76,78],{"key":20,"text":73,"correct":22},"12，12",{"key":24,"text":75,"correct":22},"24，24",{"key":27,"text":77,"correct":22},"36，36",{"key":30,"text":79,"correct":32},"48，48",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1100967,"承包人办理保险的情况下，如果承包人未按合同约定办理设计和工程保险、第三者责任保险，或未能使保险持续有效时，（）可代为办理，所需费用由（）承担。",[84,86,88,90],{"key":20,"text":85,"correct":22},"发包人，发包人",{"key":24,"text":87,"correct":32},"发包人，承包人",{"key":27,"text":89,"correct":22},"监理人，发包人",{"key":30,"text":91,"correct":22},"监理人，承包人",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1100969,"下列关于设计施工总承包合同的说法错误的是（）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"设计方案不一定最优",{"key":24,"text":99,"correct":32},"有利于发包人对承包人的监督和检查",{"key":27,"text":101,"correct":22},"可以减少设计变更",{"key":30,"text":103,"correct":22},"减少承包人的索赔",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},1100970,"设计施工总承包合同模式下，总监理工程师可以授权其他监理人员负责执行其指派的一项或多项监理工作。（）应将被授权监理人员的（）通知承包人。",[108,110,112,114],{"key":20,"text":109,"correct":22},"发包人，姓名及其授权范围",{"key":24,"text":111,"correct":22},"发包人，职能分工及监理权限",{"key":27,"text":113,"correct":32},"总监理工程师，姓名及其授权范围",{"key":30,"text":115,"correct":22},"总监理工程师，职能分工及监理权限",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1100971,"设计施工总承包合同模式下，履约保函担保承包商按合同约定履行义务的期限为（）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"从签订合同日起，至缺陷通知期结束",{"key":24,"text":123,"correct":32},"从签订合同日起，至完成施工义务",{"key":27,"text":125,"correct":22},"从工程开工日起，至完成保修义务",{"key":30,"text":127,"correct":22},"从工程开工日起，至颁发工程接收证书日止",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1100973,"设计施工总承包合同模式下，不可预见物质条件的风险由发包人承担，承包人遇到不可预见物质条件时，及时通知了监理人，监理人没有发出指示，承包人因采取合理措施而增加的费用和工期延误，由（）承担。",[132,133,134,135],{"key":20,"text":39,"correct":32},{"key":24,"text":64,"correct":22},{"key":27,"text":41,"correct":22},{"key":30,"text":136,"correct":22},"发包人和承包人",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":27,"analysis":33},1100974,"设计施工总承包合同模式下，关于“开始工作通知”说法正确的是（）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"表明从发出该通知时间开始工作",{"key":24,"text":144,"correct":22},"与“开工通知”的说法相同",{"key":27,"text":146,"correct":32},"表明自该通知中载明的开始工作日期计算合同工期",{"key":30,"text":148,"correct":22},"该通知是由发包人发出的",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":30,"analysis":33},1100975,"如果工程延期竣工，承包人有义务保证履约担保继续有效。由于发包人原因导致延期的，继续提供履约担保所需的费用由（）承担；由于承包人原因导致延期的，继续提供履约担保所需费用由（）承担。",[153,155,156,158],{"key":20,"text":154,"correct":22},"承包人，承包人",{"key":24,"text":85,"correct":22},{"key":27,"text":157,"correct":22},"承包人，发包人",{"key":30,"text":87,"correct":32},{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},1100976,"按照施工合同示范文本的规定，监理人接到承包人提交的进度计划后，应在合同约定的时间内予以确认或提出修改意见。如果监理人没有在约定时间内予以确认或提出修改意见，则视为（）。",[163,165,167,169],{"key":20,"text":164,"correct":22},"工程师已经确认，承包人不再承担计划的缺陷责任",{"key":24,"text":166,"correct":32},"工程师已经确认，承包人仍应承担计划的缺陷责任",{"key":27,"text":168,"correct":22},"工程师未确认，承包人应修改进度计划",{"key":30,"text":170,"correct":22},"工程师未确认，承包人应等待工程师的进一步指示",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},1100977,"设计施工总承包合同模式下，对于发包人要求中对某工程部分功能的要求错误，承包人在复核时未能发现，导致承包人费用增加和延误工期，则（）。",[175,177,179,181],{"key":20,"text":176,"correct":32},"发包人承担费用并延长工期，支付合理利润",{"key":24,"text":178,"correct":22},"承包人承担费用和延误的工期",{"key":27,"text":180,"correct":22},"发包人承担费用并延长工期，无需支付利润",{"key":30,"text":182,"correct":22},"发包人和承包人共同承担费用，并延长工期",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":27,"analysis":33},1100978,"在对以往历次已签发的进度付款证书进行汇总和复核中发现错、漏或重复情况时，监理人有权予以修正，承包人也有权提出修正申请。经监理人、承包人复核同意的修正，应在（）支付或扣除。",[187,189,191,193],{"key":20,"text":188,"correct":22},"竣工结算",{"key":24,"text":190,"correct":22},"下一次进度款中",{"key":27,"text":192,"correct":32},"本次进度付款中",{"key":30,"text":194,"correct":22},"以上都不正确",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":30,"analysis":33},1100979,"设计施工总承包合同模式下，某工程合同约定需要进行竣工后试验，则其履约担保需要在（）一直有效。",[199,201,203,205],{"key":20,"text":200,"correct":22},"竣工验收前",{"key":24,"text":202,"correct":22},"颁发工程接收证书前",{"key":27,"text":204,"correct":22},"工程移交前",{"key":30,"text":206,"correct":32},"竣工后试验通过前",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1100980,"承包人办理保险的情况下，因承包人未按合同约定办理设计和工程保险、第三者责任保险，导致发包人受到保险范围内事件影响的损害而又不能得到保险人的赔偿时，原应从该项保险得到的保险赔偿金由( )承担。",[211,212,213,214],{"key":20,"text":136,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":64,"correct":32},{"key":30,"text":39,"correct":22},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},1100981,"合同约定范围内的工作需国家有关部门审批时，发包人、承包人应按照合同约定的职责分工完成行政审批报送。因国家有关部门审批迟延造成费用增加和(或)工期延误，由( )承担。",[219,220,221,223],{"key":20,"text":64,"correct":22},{"key":24,"text":39,"correct":32},{"key":27,"text":222,"correct":22},"政府部分",{"key":30,"text":136,"correct":22},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},1100982,"在设计施工总承包合同中，关于缺陷责任期管理，下列说法不正确的是( )。",[228,230,232,234],{"key":20,"text":229,"correct":22},"承包人承担修复工程缺陷的义务，费用和工期由责任方负责",{"key":24,"text":231,"correct":22},"由于承包人原因造成某项缺陷修复，相应延长缺陷责任期，但缺陷责任期最长不超过2年",{"key":27,"text":233,"correct":22},"大型工程缺陷责任期内的竣工后试验通常在工程稳定运行一段时间后进行",{"key":30,"text":235,"correct":32},"工程缺陷的责任属于发包人原因造成的，发包人应承担修复和查验的费用，但不包括合理利润",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":30,"analysis":33},1100983,"设计施工总承包合同模式下，承包人对总监理工程师授权的监理人员发出的指示有疑问时，可在该指示发出的()小时内向总监理工程师提出书面异议，总监理工程师应在()小时内对该指示予以确认、更改或撤销。",[240,241,242,243],{"key":20,"text":73,"correct":22},{"key":24,"text":75,"correct":22},{"key":27,"text":77,"correct":22},{"key":30,"text":79,"correct":32},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},1100984,"设计施工总承包合同模式下，关于承包人负责竣工后试验的说法，正确的是()。",[248,250,252,254],{"key":20,"text":249,"correct":32},"承包人提供所需要的所有其他设备、仪器，派遣有资质和经验的工作人员，在发包人在场的情况下进行",{"key":24,"text":251,"correct":22},"发包人应派遣具有适当资质和经验的工作人员，直接按照操作和维修手册进行",{"key":27,"text":253,"correct":22},"承包人提供所需要的所有其他设备、仪器，派遣有资质和经验的工作人员，发包人在不在场均可进行",{"key":30,"text":255,"correct":22},"试验所必需的电力、设备、燃料、仪器、劳力、材料等由承包人提供",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1100985,"根据《标准设计施工总承包合同》，对于发包人要求中的错误，正确的处理方式是在订立合同时()。",[260,262,264,266],{"key":20,"text":261,"correct":32},"选用无条件补偿条款或有条件补偿条款",{"key":24,"text":263,"correct":22},"将无条件补偿条款写入专用条款",{"key":27,"text":265,"correct":22},"将有条件补偿条款写入专用条款",{"key":30,"text":267,"correct":22},"明确复核未发现原始数据错误造成的损失由承包人承担",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},1100986,"设计施工总承包合同文件组成中，解释顺序在投标函及投标函附录条款之前的为()。",[272,274,276,278],{"key":20,"text":273,"correct":22},"投标函",{"key":24,"text":275,"correct":32},"中标通知书",{"key":27,"text":277,"correct":22},"专用条款",{"key":30,"text":279,"correct":22},"承包人建议书",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},1100987,"设计施工总承包合同中，关于承包人说法错误的是()。",[284,286,288,290],{"key":20,"text":285,"correct":22},"承包人是总承包合同的另一当事人",{"key":24,"text":287,"correct":22},"总承包合同的承包人可以是独立承包人，也可以是联合体",{"key":27,"text":289,"correct":32},"合同履行过程中发包人可以和联合体各方进行联系",{"key":30,"text":291,"correct":22},"未经发包人同意，承包人不得擅自改变联合体的组成",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},1100988,"下列关于工程项目总承包合同，说法不正确的是( )。",[296,298,300,302],{"key":20,"text":297,"correct":22},"建设工程项目总承包是指对工程项目的设计、采购、施工、试运行的全过程或部分过程进行承包",{"key":24,"text":299,"correct":22},"在项目实施阶段，发包人负责项目的筹资、建设过程重大问题的决策",{"key":27,"text":301,"correct":32},"在项目实施阶段，由承包人承担实施过程的全部风险",{"key":30,"text":303,"correct":22},"部分工程进行设计施工总承包经常出现在大型工业工程对在建或已建工程的单位工程或分部工程使用承包人的专利技术实施",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1100989,"在设计施工总承包合同模式下，关于合同当事人的表述，不准确的是()。",[308,310,312,314],{"key":20,"text":309,"correct":32},"承包人为联合体的，在履行过程中，承包人不得改变联合体的组成修改联合体协议",{"key":24,"text":311,"correct":22},"承包人需要按合同约定承担完成工程项目的设计至缺陷责任期的质量缺陷修复责任",{"key":27,"text":313,"correct":22},"承包人可以是独立的承包人，也可以是联合体",{"key":30,"text":315,"correct":22},"发包人对工程项目的实施负责投资支付和项目建设有关重大事项的决定",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":30,"analysis":33},1100990,"在设计施工总承包合同中，承包人应保证其履约担保在发包人颁发工程接收证书前一直有效。下列关于履约担保说法不正确的是( )。",[320,322,324,326],{"key":20,"text":321,"correct":22},"由于发包人原因导致延期的，继续提供履约担保所需的费用由发包人承担",{"key":24,"text":323,"correct":22},"由于承包人原因导致延期的，继续提供履约担保所需费用由承包人承担",{"key":27,"text":325,"correct":22},"如果工程延期竣工，承包人有义务保证履约担保继续有效",{"key":30,"text":327,"correct":32},"由于发包人原因导致延期的，继续提供履约担保所需的费用由承包人承担",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":30,"analysis":33},1100991,"在设计施工总承包合同中，下列关于承包人文件的说法，错误的是( )。",[332,334,336,338],{"key":20,"text":333,"correct":22},"专用条款约定承包人向监理人陆续提供文件的内容、数量和时间",{"key":24,"text":335,"correct":22},"专用条款内需要约定监理人对承包人提交文件应批准的合理期限",{"key":27,"text":337,"correct":22},"承包人文件中最主要的是设计文件",{"key":30,"text":339,"correct":32},"项目实施中，监理人未在约定的期限内对提交文件提出意见，不能进行后续施工",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":27,"analysis":33},1100992,"在设计施工总承包合同中，下列关于分包说法不正确的是( )。",[344,346,348,350],{"key":20,"text":345,"correct":22},"承包人不得将其承包的全部工程转包给第三人，也不得将其承包的全部工程肢解后以分包的名义分别转包给第三人",{"key":24,"text":347,"correct":22},"分包工作需要征得发包人同意",{"key":27,"text":349,"correct":32},"承包人不得将施工的主体、关键性工作的施工分包给第三人，设计工作可以全部分包",{"key":30,"text":351,"correct":22},"发包人同意分包的工作，承包人应向发包人和监理人提交分包合同副本",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":30,"analysis":33},1100993,"设计施工总承包中，由于（ ）对项目实施的全过程进行一体化管理，不必等工程的全部设计完成后再开始施工，单位工程的施工图设计完成并通过评审后既可开始该单位工程的施工。",[356,357,359,360],{"key":20,"text":41,"correct":22},{"key":24,"text":358,"correct":22},"分包人",{"key":27,"text":39,"correct":22},{"key":30,"text":64,"correct":32},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},1100994,"关于承包人现场查勘的说法，错误的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"承包人应对施工场地和周围环境进行查勘",{"key":24,"text":368,"correct":22},"在全部合同工作中，视为承包人已充分估计了应承担的责任和风险",{"key":27,"text":370,"correct":32},"发包人对其提供的原始资料错误按情况承担责任",{"key":30,"text":372,"correct":22},"承包人应对其阅读有关资料后，所做出的解释和推断负责",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":30,"analysis":33},1100995,"关于承包人提交实施项目的计划说法错误的是()。",[377,379,381,383],{"key":20,"text":378,"correct":22},"承包人应按合同约定的内容和期限，编制详细的进度计划",{"key":24,"text":380,"correct":22},"监理人应在专用条款约定的期限内批复",{"key":27,"text":382,"correct":22},"批准的计划作为“合同进度计划”",{"key":30,"text":384,"correct":32},"监理人未在约定的时限内批准，计划不能实施",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},1100996,"在设计施工合同履行过程中，由()负责提供原始资料，并承担原始资料错误造成的全部责任。",[389,390,391,392],{"key":20,"text":39,"correct":32},{"key":24,"text":64,"correct":22},{"key":27,"text":41,"correct":22},{"key":30,"text":393,"correct":22},"设计人",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},1100997,"设计施工总承包合同承包人需要变动保险合同条款时，应（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"将变动结果及时通知发包人",{"key":24,"text":401,"correct":22},"事先征得发包人与监理人的同意",{"key":27,"text":403,"correct":32},"事先征得发包人同意，并通知监理人",{"key":30,"text":405,"correct":22},"事先征得监理人同意，并通知发包人",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1100998,"符合专用条款约定的开始工作条件时，监理人获得发包人同意后应提前()天向承包人发出开始工作通知。",[410,412,414,416],{"key":20,"text":411,"correct":32},"7",{"key":24,"text":413,"correct":22},"10",{"key":27,"text":415,"correct":22},"14",{"key":30,"text":417,"correct":22},"21",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1100999,"设计施工总承包合同订立时，如果发包人要求违反法律规定，承包人发现后应书面通知发包人，并要求其改正。发包人收到通知后不予改正或不作答复，承包人有权拒绝履行合同义务，直至解除合同。此时（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"发包人仅承担承包人由此引起的费用损失",{"key":24,"text":425,"correct":22},"发包人仅承担承包人由此引起的工期损失",{"key":27,"text":427,"correct":32},"发包人应承担由此引起的承包人全部损失",{"key":30,"text":429,"correct":22},"发包人与承包人共同承担由此引起的承包人全部损失",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1101000,"关于设计施工阶段总承包合同的承包人提出合理化建议的表述中，不正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"履行合同过程中，承包人可以书面形式向监理人提交改变“发包人要求”文件中有关内容的合理化建议书",{"key":24,"text":437,"correct":32},"监理人自行决定是否采纳承包人的建议",{"key":27,"text":439,"correct":22},"承包人的合理化建议被采纳并构成变更，由监理人向承包人发出变更指示",{"key":30,"text":441,"correct":22},"如果接受承包人提出的合理化建议，降低了合同价格、缩短了工期或者提高了工程的经济效益，发包人可依据专用条款中约定给予奖励",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},1101001,"缺陷责任期内承包人不能在合理时间内修复的缺陷，（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"发包人只能自行修复，修复费用由承包方承担",{"key":24,"text":449,"correct":22},"发包人可自行修复或委托其他人修复，所需费用和利润由承包方承担",{"key":27,"text":451,"correct":22},"发包人只能自行修复.所需费用和利润按缺陷原因的责任方承担",{"key":30,"text":453,"correct":32},"发包人可自行修复或委托其他人修复，所需费用和利润按缺陷原因的责任方承担",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},1101002,"在分期付款买卖合同中，分期付款的买受人未支付到期价款的金额达到全部价款的()时，出卖人可以要求买受人支付全部价款或者解除合同。",[458,460,462,464],{"key":20,"text":459,"correct":22},"1／2",{"key":24,"text":461,"correct":22},"1／3",{"key":27,"text":463,"correct":22},"1／4",{"key":30,"text":465,"correct":32},"1／5",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1101003,"建设工程采用设计施工总承包模式的优点有（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":32},"减少设计变更",{"key":24,"text":473,"correct":22},"易获得最优设计方案",{"key":27,"text":475,"correct":22},"加强发包人对承包人的监督",{"key":30,"text":477,"correct":22},"减少承包人的风险",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},1101004,"在设计施工总承包合同模式下，承包人设计文件提交监理人后，由()组织设计审查，自监理人收到设计文件起的审查期限为()。",[482,484,486,488],{"key":20,"text":483,"correct":22},"监理人，14天",{"key":24,"text":485,"correct":22},"监理人，21天",{"key":27,"text":487,"correct":22},"发包人，14天",{"key":30,"text":489,"correct":32},"发包人，21天",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1101005,"工程总承包合同履行管理中，关于工程设计管理的说法，正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"承包人完成设计工作所遵守的规定，应采用发包人要求和承包人建议书",{"key":24,"text":497,"correct":22},"设计的实际进度滞后时，承包人需提交减少投入资源并加快进度的计划",{"key":27,"text":499,"correct":32},"承包人应根据监理人的书面说明，对承包人文件进行修改后重新报送发包人审查，审查期限重新起算",{"key":30,"text":501,"correct":22},"发包人在设计文件审查同意后10天内，向政府有关部门报送",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1101006,"根据《标准设计施工总承包招标文件》，投保工伤险和人身意外伤害险的正确做法是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":32},"发包人、监理人、承包人和分包人均应投保",{"key":24,"text":509,"correct":22},"承包人和监理人应投保，发包人和分包人不需要投保",{"key":27,"text":511,"correct":22},"承包人、分包人及监理人应投保，发包人不需要投保",{"key":30,"text":513,"correct":22},"承包人和分包人应投保，发包人和监理人不需要投保",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},1101007,"（2014年真题）根据《标准设计施工总承包合同》，承包人编制进度付款支付分解表时，勘察设计费分解的原则是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":32},"按提交勘察设计阶段性成果文件的时间、对应的工作量进行分解",{"key":24,"text":521,"correct":22},"按勘察设计总费用、勘察设计工作持续时间进行分解",{"key":27,"text":523,"correct":22},"按提交勘察设计阶段性成果的次数平均分解",{"key":30,"text":525,"correct":22},"按勘察设计总费用、项目施工周期进行分解",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1101008,"（2020年真题）建设工程采用设计施工总承包模式的特点是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"不利于承包人的工程变更",{"key":24,"text":533,"correct":22},"建设周期不易把控",{"key":27,"text":535,"correct":22},"设计和施工责任划分不清",{"key":30,"text":537,"correct":32},"影响工程设计方案的比选范围和充分竞争",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},1101009,"（2020年真题）根据《标准设计施工总承包招标文件》，关于工程分包的说法，正确的是 （ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"承包人经发包人同意，可将全部施工分包给第三人",{"key":24,"text":545,"correct":22},"承包人的分包合同，应由分包人向监理人提交副本备案",{"key":27,"text":547,"correct":32},"承包人征得发包人同意，可将部分工程分包给有资质的分包人",{"key":30,"text":549,"correct":22},"发包人、监理人和承包人共同对分包人进行分包管理",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":27,"analysis":33},1101010,"（2020年真题）根据《标准设计施工总承包招标文件》中的通用合同条款，自监理入收到承包人的设计文件之日起，对承包人设计文件的审查期限应不超过（ ）日。",[554,555,556,557],{"key":20,"text":411,"correct":22},{"key":24,"text":415,"correct":22},{"key":27,"text":417,"correct":32},{"key":30,"text":558,"correct":22},"28",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":30,"analysis":33},1101012,"FIDI C.《施工合同条件》中，对工程量增减变化较大需要调整合同约定单价不包括的条件是( )。",[563,565,567,569],{"key":20,"text":564,"correct":22},"该部分工程在合同内约定属于按单价计量支付的部分",{"key":24,"text":566,"correct":22},"该部分工作通过计量超过工程量清单中估计工程量的数量变化超过10%",{"key":27,"text":568,"correct":22},"计量的工作数量与工程量清单中该项单价的乘积，超过中标合同金额(我国标准合同中的“签约合同价”)的0.01%",{"key":30,"text":570,"correct":32},"数量的变化导致该项工作的施工单位成本变化超过2%",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":30,"analysis":33},1101016,"FIDIC系列中，《施工合同条件》，工程师在收到承包商申请通知后（）天内，应向承包商颁发接收证书。",[575,576,577,579],{"key":20,"text":411,"correct":22},{"key":24,"text":415,"correct":22},{"key":27,"text":578,"correct":22},"24",{"key":30,"text":558,"correct":32},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":24,"analysis":33},1101017,"FIDIC系列中，《施工合同条件》中，承包商可在其认为工程即将竣工并做好接收准备的日期前不少于（）天，向工程师发出申请接收证书的通知。",[584,585,586,587],{"key":20,"text":411,"correct":22},{"key":24,"text":415,"correct":32},{"key":27,"text":558,"correct":22},{"key":30,"text":588,"correct":22},"72",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]