[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,15,50,2250,[13,34,46,58,70,82,93,104,116,128,139,151,163,173,185,197,209,221,233,245,255,265,277,287,299,307,317,329,338,348,357,369,379,391,403,415,427,439,451,463,473,485,497,509,521,533,545,557,569,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1100879,1,"单选题","（2020年真题）在工程勘察设计招投标过程中，应没收投标保证金的情形是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","投标人在评标期间向外界透露投标报价信息",false,{"key":24,"text":25,"correct":22},"B","投标人提交的投标保证金数额低于招标文件的规定",{"key":27,"text":28,"correct":22},"C","投标人在投标截止后致函提出技术澄清说明",{"key":30,"text":31,"correct":32},"D","投标人中标后未按招标文件要求提交履约保证金",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1100880,"（2020年真题）联合体资质等级的确定（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"由多家单位组成的联合体，按资质等级较低的确定",{"key":24,"text":41,"correct":22},"由多家单位组成的联合体，按资质等级较高的确定",{"key":27,"text":43,"correct":32},"由同一专业的单位组成的联合体，按资质等级较低的确定",{"key":30,"text":45,"correct":22},"由同一专业的单位组成的联合体，按资质等级较高的确定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1100881,"（2020年真题）关于工程勘察设计开标评标的说法，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投标人在开标现场对开标提出的异议，招标人有权不予答复",{"key":24,"text":53,"correct":32},"评标委员会由招标人代表和有关专家组成，应为5人以上单数",{"key":27,"text":55,"correct":22},"开标应在招标文件确定的提交投标文件截止时间后的3日内进行",{"key":30,"text":57,"correct":22},"投标报价偏差率的计算方法应由评标委员会成员在评标时确定",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1100882,"下列关于设计施工总承包合同的说法，错误的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"可以减少设计变更",{"key":24,"text":65,"correct":32},"增加承包人的索赔",{"key":27,"text":67,"correct":22},"合同责任单一，责任明确",{"key":30,"text":69,"correct":22},"固定工期、固定费用",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1100883,"设计施工总承包合同，虽然设计和施工过程中，发包人也聘请监理人(或发包人代表)，但由于设计方案和质量标准均出自（）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"承包人",{"key":24,"text":77,"correct":22},"工程师",{"key":27,"text":79,"correct":22},"发包人",{"key":30,"text":81,"correct":22},"项目经理",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1100885,"国际设计工程总承包合同通常采用（ ）的承包方式，项目建设的预期目标容易实现。",[86,87,89,91],{"key":20,"text":69,"correct":32},{"key":24,"text":88,"correct":22},"固定工期、浮动费用",{"key":27,"text":90,"correct":22},"浮动工期、浮动费用",{"key":30,"text":92,"correct":22},"浮动工期、固定费用",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":27,"analysis":33},1100886,"设计施工总承包中，由于在招标文件中发包人仅对项目的建设提出具体要求，实际方案由（ ）提出，设计可能受到实施者利益影响，对工程实施成本的考虑往往会影响到设计方案的优化。",[97,99,101,102],{"key":20,"text":98,"correct":22},"监理人",{"key":24,"text":100,"correct":22},"技术负责人",{"key":27,"text":75,"correct":32},{"key":30,"text":103,"correct":22},"勘察人",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},1100889,"建设工程采用设计施工总承包模式的特点是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"容易获得最优设计方案",{"key":24,"text":111,"correct":22},"发包人便于控制实施过程",{"key":27,"text":113,"correct":32},"合同责任明确",{"key":30,"text":115,"correct":22},"承包人承担的风险小",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1100890,"下列关于设计施工总承包合同模式下分包工程的说法，错误的是( )。",[120,122,124,126],{"key":20,"text":121,"correct":22},"承包人不得将其承包的全部工程肢解后以分包的名义分别转包给第三人",{"key":24,"text":123,"correct":32},"分包人的资质能力不需要经过监理人审查",{"key":27,"text":125,"correct":22},"承包人不得将设计和施工的主体、关键性工作的施工分包给第三人",{"key":30,"text":127,"correct":22},"除发包人已同意投标文件中说明的分包外，合同履行过程中承包人还需分包的工作仍需要经发包人同意",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},1100891,"根据《标准设计施工总承包合同》，关于工程分包的说法，正确的是()。",[132,134,136,137],{"key":20,"text":133,"correct":22},"承包人不得将其承包的工程分包给第三人",{"key":24,"text":135,"correct":22},"投标文件中已说明的分包，合同履行还需再征得发包人同意",{"key":27,"text":125,"correct":32},{"key":30,"text":138,"correct":22},"委托分包人的工作由发包人和承包人共同完成",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":30,"analysis":33},1100892,"在设计施工总承包合同中，下列关于联合体承包说法不正确的是( )。",[143,145,147,149],{"key":20,"text":144,"correct":22},"联合体的承包人，合同履行过程中发包人和监理人仅与联合体牵头人或联合体授权的代表联系",{"key":24,"text":146,"correct":22},"联合体协议经发包人确认后已作为合同附件",{"key":27,"text":148,"correct":22},"履行合同过程中，未经发包人同意，承包人不得擅自改变联合体的组成",{"key":30,"text":150,"correct":32},"履行合同过程中，未经发包人同意，承包人修改联合体协议",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1100894,"设计施工总承包合同模式下，当授权其他监理人员负责执行一项或多项监理工作时，()应将被授权监理人员的()通知承包人。",[155,157,159,161],{"key":20,"text":156,"correct":22},"发包人，姓名及其授权范围",{"key":24,"text":158,"correct":22},"发包人，职能分工及监理权限",{"key":27,"text":160,"correct":32},"总监理工程师，姓名及其授权范围",{"key":30,"text":162,"correct":22},"总监理工程师，职能分工及监理权限",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":27,"analysis":33},1100898,"工程总承包工程，在分包工程中，发包人同意分包的工作，承包人应向（）提交分包合同副本。",[167,168,169,171],{"key":20,"text":79,"correct":22},{"key":24,"text":98,"correct":22},{"key":27,"text":170,"correct":32},"发包人和监理人",{"key":30,"text":172,"correct":22},"发包人和分包人",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":30,"analysis":33},1100899,"承包人对总监理工程师授权的监理人员发出的指示有疑问时，可在该指示发出的（ ）小时内向总监理工程师提出书面异议。",[177,179,181,183],{"key":20,"text":178,"correct":22},"12",{"key":24,"text":180,"correct":22},"24",{"key":27,"text":182,"correct":22},"36",{"key":30,"text":184,"correct":32},"48",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},1100900,"根据《设计施工总承包合同》，关于建设工程监理人的说法，错误的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"发包人同意分包的工作，承包人应向发包人和监理人提交分包合同副本",{"key":24,"text":192,"correct":32},"发包人分包工作需要征得监理人同意",{"key":27,"text":194,"correct":22},"承包人对总监理工程师授权的监理人员发出的指示有疑问时，可在该指示发出的48小时内向总监理工程师提出书面异议",{"key":30,"text":196,"correct":22},"监理人应审查分包人的资格能力",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":30,"analysis":33},1100902,"设计施工总承包合同模式下，承包人对总监理工程师授权的监理人员发出的指示有疑问时，做法正确的是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"在该指示发出的24小时内提出书面异议",{"key":24,"text":204,"correct":22},"在收到该指示的48小时内提出书面异议",{"key":27,"text":206,"correct":22},"向授权的监理人员提出书面异议",{"key":30,"text":208,"correct":32},"总监理工程师应在48小时内回复",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":30,"analysis":33},1100903,"在设计施工总承包合同中，下列合同文件解释顺序靠后的是( )。",[213,215,217,219],{"key":20,"text":214,"correct":22},"合同协议书",{"key":24,"text":216,"correct":22},"发包人要求",{"key":27,"text":218,"correct":22},"承包人建议书",{"key":30,"text":220,"correct":32},"价格清单",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":27,"analysis":33},1100904,"《标准设计施工总承包合同》中的“价格清单”是指( )。",[225,227,229,231],{"key":20,"text":226,"correct":22},"发包人依据设计图纸概算量提出的工程量清单",{"key":24,"text":228,"correct":22},"承包人依据发包人工程量清单计算出的报价清单",{"key":27,"text":230,"correct":32},"承包人按完成投标方案计算的从设计到缺陷责任期各阶段的计划费用",{"key":30,"text":232,"correct":22},"设计总承包与施工总承包的签约合同价及其构成",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":30,"analysis":33},1100905,"设计施工总承包合同模式下，关于价格清单的说法错误的是( )。",[237,239,241,243],{"key":20,"text":238,"correct":22},"与施工招标由发包人依据设计图纸的概算量提出工程量清单，经承包人填写单价后计算价格的方式不同",{"key":24,"text":240,"correct":22},"承包人按投标文件中规定的格式和要求填写，并标明价格的报价单",{"key":27,"text":242,"correct":22},"清单价格费用的总和为签约合同价",{"key":30,"text":244,"correct":32},"承包人完成所提投标方案计算的施工、竣工阶段的计划费用",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},1100906,"设计施工总承包合同的（），指承包人按投标文件中规定的格式和要求填写，并标明价格的报价单。",[249,250,252,253],{"key":20,"text":214,"correct":22},{"key":24,"text":251,"correct":22},"专用条款",{"key":27,"text":220,"correct":32},{"key":30,"text":254,"correct":22},"通用合同条款",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":30,"analysis":33},1100909,"()应为其现场机构雇佣的全部人员投保工伤保险和人身意外伤害保险，并要求监理人也进行此项保险。",[259,261,262,264],{"key":20,"text":260,"correct":22},"政府部门",{"key":24,"text":75,"correct":22},{"key":27,"text":263,"correct":22},"分包人",{"key":30,"text":79,"correct":32},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},1100910,"承包人办理保险的情况下，如果承包人未按合同约定办理设计和工程保险、第三者责任保险，或未能使保险持续有效时，()可代为办理，所需费用由()承担。",[269,271,273,275],{"key":20,"text":270,"correct":22},"发包人，发包人",{"key":24,"text":272,"correct":32},"发包人，承包人",{"key":27,"text":274,"correct":22},"监理人，发包人",{"key":30,"text":276,"correct":22},"监理人，承包人",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":30,"analysis":33},1100912,"如果工程延期竣工，承包人有义务保证履约担保继续有效。由于发包人原因导致延期的，继续提供履约担保所需的费用由（ ）承担；由于承包人原因导致延期的，继续提供履约担保所需费用由（ ）承担。",[281,283,284,286],{"key":20,"text":282,"correct":22},"承包人，承包人",{"key":24,"text":270,"correct":22},{"key":27,"text":285,"correct":22},"承包人，发包人",{"key":30,"text":272,"correct":32},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":30,"analysis":33},1100913,"设计施工总承包合同模式下，某工程合同约定需要进行竣工后试验，则其履约担保需要在()一直有效。",[291,293,295,297],{"key":20,"text":292,"correct":22},"竣工验收前",{"key":24,"text":294,"correct":22},"颁发工程接收证书前",{"key":27,"text":296,"correct":22},"工程移交前",{"key":30,"text":298,"correct":32},"竣工后试验通过前",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},1100914,"设计施工总承包合同模式下，一般情况下，承包人应保证其履约担保在()一直有效。",[303,304,305,306],{"key":20,"text":292,"correct":22},{"key":24,"text":294,"correct":32},{"key":27,"text":296,"correct":22},{"key":30,"text":298,"correct":22},{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1100919,"设计施工总承包合同订立时，承包人文件中最主要的是（ ），需在专用条款约定承包人向监理人陆续提供文件的内容、数量和时问。",[311,312,314,315],{"key":20,"text":218,"correct":22},{"key":24,"text":313,"correct":32},"设计文件",{"key":27,"text":220,"correct":22},{"key":30,"text":316,"correct":22},"投标函",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":30,"analysis":33},1100921,"关于设计施工总承包合同履约担保的表述中，不正确的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"承包人应保证其履约担保在发包人颁发工程接收证书前一直有效",{"key":24,"text":324,"correct":22},"如果合同约定需要进行竣工后试验，承包人应保证其履约担保在竣工后试验通过前一直有效",{"key":27,"text":326,"correct":22},"如果工程延期竣工，承包人有义务保证履约担保继续有效",{"key":30,"text":328,"correct":32},"由于发包人原因导致延期的，继续提供履约担保所需的费用由发包人与承包人共同承担",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},1100922,"根据《标准设计施工总承包合同》，对发包人要求作出反应的文件是（ ）。",[333,334,335,336],{"key":20,"text":220,"correct":22},{"key":24,"text":251,"correct":22},{"key":27,"text":218,"correct":32},{"key":30,"text":337,"correct":22},"联合体协议",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1100923,"根据《标准设计施工总承包合同》，设计施工总承包合同承包人完成的设计工作成果和建造完成的建筑物，如无特别约定，则除署名权以外的著作权归（ ）。",[342,343,344,346],{"key":20,"text":79,"correct":32},{"key":24,"text":75,"correct":22},{"key":27,"text":345,"correct":22},"发包人或承包人",{"key":30,"text":347,"correct":22},"发包人和承包人共同",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1100924,"设计施工总承包合同的（ ），指承包人按投标文件中规定的格式和要求填写，并标明价格的报价单。",[352,353,355,356],{"key":20,"text":220,"correct":32},{"key":24,"text":354,"correct":22},"工程量清单",{"key":27,"text":214,"correct":22},{"key":30,"text":218,"correct":22},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1100925,"根据《标准设计施工总承包招标文件》中的《合同条款及格式》，“发包人要求”中竣工试验的第三阶段应对（ ）提出要求。",[361,363,365,367],{"key":20,"text":362,"correct":22},"联动试车",{"key":24,"text":364,"correct":32},"性能测试",{"key":27,"text":366,"correct":22},"单车试验",{"key":30,"text":368,"correct":22},"投料试车",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":30,"analysis":33},1100928,"根据《标准设计施工总承包合同》，承包人文件中最重要的是（ ）。",[373,375,376,378],{"key":20,"text":374,"correct":22},"承包人建议",{"key":24,"text":216,"correct":22},{"key":27,"text":377,"correct":22},"工程进度计划",{"key":30,"text":313,"correct":32},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1100929,"根据《标准设计施工总承包招标文件》，关于保险责任的说法，正确的是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"建设工程设计责任险应当由发包人投保",{"key":24,"text":386,"correct":32},"选择建设工程设计责任险的保险人，应当经发包人与承包人双方同意",{"key":27,"text":388,"correct":22},"第三者责任险应当由发包人与承包人共同投保",{"key":30,"text":390,"correct":22},"发包人应当为承包人的施工设备投保",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":30,"analysis":33},1100930,"根据标准设计施工总承包合同通用条款的规定，下列关于履约担保的有效期说法正确的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"承包人应保证其履约担保有效期至发包人颁发缺陷责任终止证书",{"key":24,"text":398,"correct":22},"如果工程延期竣工，导致延期的责任方有义务保证履约担保继续有效",{"key":27,"text":400,"correct":22},"工程延期竣工导致承包人继续提供履约担保而增加的费用由发包人承担",{"key":30,"text":402,"correct":32},"如果合同约定需要进行竣工后试验，承包人应保证其履约担保有效期至竣工后试验通过",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},1100931,"关于设计施工总承包合同中的知识产权，说法正确的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"著作权归承包人享有",{"key":24,"text":410,"correct":32},"建筑物形象使用收益权归发包人享有",{"key":27,"text":412,"correct":22},"专利技术使用费不包含在投标报价内",{"key":30,"text":414,"correct":22},"承包人在进行设计时因侵犯知识产权所引起的责任由发包人承担",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},1100932,"《设计施工总承包合同》的“价格清单”是指（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"承包人按照发包人提出的工程量清单而计算的报价单",{"key":24,"text":422,"correct":22},"承包人按发包人的设计图纸概算量，填入单价后计算的合同价格",{"key":27,"text":424,"correct":32},"承包人按其提出的投标方案计算的设计、施工、竣工、试运行、缺陷责任期各阶段的计划费用",{"key":30,"text":426,"correct":22},"承包人向发包人的投标报价",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":30,"analysis":33},1100934,"某设计施工总承包合同规定采用无条件补偿条款，则发包人要求中存在的错误导致承包人受到的损失承担说法正确的是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"只有当承包人复核时发现了该错误，才能由发包人承担",{"key":24,"text":434,"correct":22},"如承包人复核时未发现该错误，则由承包人承担",{"key":27,"text":436,"correct":22},"无论承包人复核时是否发现该错误，均由承包人承担",{"key":30,"text":438,"correct":32},"无论承包人复核时是否发现该错误，均由发包人承担",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1100935,"根据标准设计施工总承包合同通用条款的规定，监理人未在约定的期限内对承包人提交文件提出否定意见，则（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"视为已获批准，监理人此后无权拒绝该项工作",{"key":24,"text":446,"correct":32},"视为已获批准，监理人此后仍有权拒绝该项工作",{"key":27,"text":448,"correct":22},"视为未获批准，但监理人此后无权拒绝该项工作",{"key":30,"text":450,"correct":22},"视为未获批准，监理人此后有权拒绝该项工作",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1100936,"根据《标准设计施工总承包合同》，需政府有关部门审查或批准的设计文件，发包人应在对其审查同意后的( )日内向政府有关部门报送审查。",[455,457,459,461],{"key":20,"text":456,"correct":32},"7",{"key":24,"text":458,"correct":22},"15",{"key":27,"text":460,"correct":22},"21",{"key":30,"text":462,"correct":22},"30",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1100937,"设计施工总承包合同模式下，承包人的设计文件提交监理人后，为了不影响后续工作，自监理人收到承包人的设计文件之日起，对承包人的设计文件审查期限不超过( )天。",[467,469,470,472],{"key":20,"text":468,"correct":22},"28",{"key":24,"text":460,"correct":32},{"key":27,"text":471,"correct":22},"14",{"key":30,"text":456,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":30,"analysis":33},1100938,"设计施工总承包合同模式下，关于承包人义务说法正确的是()。",[477,479,481,483],{"key":20,"text":478,"correct":22},"承包人的设计只需要遵守发包人的要求，保证设计质量",{"key":24,"text":480,"correct":22},"如果发包人要求中的质量高于现行规范规定，可以按照现行规范规定执行",{"key":27,"text":482,"correct":22},"承包人完成设计工作，直接按照最新的规范和标准",{"key":30,"text":484,"correct":32},"设计实际进度滞后计划进度，发包人提出要求后，承包人应提交修正进度计划、增加投入资源并加快设计进度",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},1100940,"根据《标准设计施工总承包合同》，承包人编制进度付款支付分解表时，勘察设计费分解的原则是()。",[489,491,493,495],{"key":20,"text":490,"correct":32},"按提交勘察设计阶段性成果文件的时间、对应的工作量进行分解",{"key":24,"text":492,"correct":22},"按勘察设计总费用、勘察设计工作持续时间进行分解",{"key":27,"text":494,"correct":22},"按提交勘察设计阶段性成果的次数平均分解",{"key":30,"text":496,"correct":22},"按勘察设计总费用、项目施工周期进行分解",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},1100941,"在对以往历次已签发的进度付款证书进行汇总和复核中发现错、漏或重复情况时，监理人有权予以修正，承包人也有权提出修正申请。经监理人、承包人复核同意的修正，应在( )支付或扣除。",[501,503,505,507],{"key":20,"text":502,"correct":22},"竣工结算",{"key":24,"text":504,"correct":22},"下一次进度款中",{"key":27,"text":506,"correct":32},"本次进度付款中",{"key":30,"text":508,"correct":22},"以上都不正确",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1100943,"设计施工总承包合同模式下，承包人可以索赔工期、费用和利润的是()。",[513,515,517,519],{"key":20,"text":514,"correct":32},"发包人原因造成质量不合格",{"key":24,"text":516,"correct":22},"行政审批延误",{"key":27,"text":518,"correct":22},"为他人提供方便",{"key":30,"text":520,"correct":22},"发包人违约解除合同",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":30,"analysis":33},1100944,"设计施工总承包合同模式下，承包人应提前()天将申请竣工试验的通知送达监理人，并按照专用条款约定的份数向监理人提交竣工记录、暂行操作和维修手册。监理人应在()天内，确定竣工试验的具体时间。",[525,527,529,531],{"key":20,"text":526,"correct":22},"14，21",{"key":24,"text":528,"correct":22},"14，14",{"key":27,"text":530,"correct":22},"21，21",{"key":30,"text":532,"correct":32},"21，14",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":30,"analysis":33},1100945,"在设计施工总承包合同中，关于竣工试验，通用条款规定的竣工试验程序按三阶段进行，其中第二阶段是( )。",[537,539,541,543],{"key":20,"text":538,"correct":22},"发包人进行试验，保证每一项工程设备满足合同要求",{"key":24,"text":540,"correct":22},"发包人进行试验，保证工程或区段工程满足合同要求",{"key":27,"text":542,"correct":22},"承包人进行试验，保证每一项工程设备满足合同要求",{"key":30,"text":544,"correct":32},"承包人进行试验，保证工程或区段工程满足合同要求",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1100947,"对于大型工程为了检验承包人的设计、设备造型和运行情况等是否满足合同约定，会在缺陷责任期内工程稳定运行一段时间后，进行竣工后试验。竣工后试验由( )组织，应在试验日期提前( )通知对方。",[549,551,553,555],{"key":20,"text":550,"correct":32},"承包人或发包人，21天",{"key":24,"text":552,"correct":22},"发包人，14天",{"key":27,"text":554,"correct":22},"承包人或发包人，14天",{"key":30,"text":556,"correct":22},"承包人，21天",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1100948,"某工程项目是根据FIDIC《施工合同条件》签订的合同，合同约定，缺陷责任期为20个月，A单位工程为分部移交工程，A单位工程竣工移交后的运行期间，因施工质量问题出现重大缺陷，承包人修复后工程师要求延长该部分缺陷责任期6个月，A单位工程缺陷责任期的终止时间应为()。",[561,563,565,567],{"key":20,"text":562,"correct":22},"A单位工程竣工日后26个月",{"key":24,"text":564,"correct":32},"A单位工程竣工日后24个月",{"key":27,"text":566,"correct":22},"全部工程竣工日后26个月",{"key":30,"text":568,"correct":22},"全部工程竣工日后24个月",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1100954,"设计施工阶段总承包合同的承包人应提前（ ）d将申请竣工试验的通知送达监理人。并按照专用条款约定的份数，向监理人提交竣工记录、暂行操作和维修手册。",[573,574,575,577],{"key":20,"text":471,"correct":22},{"key":24,"text":460,"correct":32},{"key":27,"text":576,"correct":22},"35",{"key":30,"text":578,"correct":22},"42",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":30,"analysis":33},1100957,"因发包人原因造成监理人未能在合同签订之日起（ ）天内发出开始工作通知，承包人有权提出价格调整要求，或者解除合同。",[583,584,585,587],{"key":20,"text":471,"correct":22},{"key":24,"text":468,"correct":22},{"key":27,"text":586,"correct":22},"56",{"key":30,"text":588,"correct":32},"90",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]