[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,12,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,309,321,333,344,356,368,380,392,404,416,428,440,452,461,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1100689,1,"单选题","(2017年真题)最低评标价法对建设工程项目施工投标文件进行评审时，主要比较的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目总报价",false,{"key":24,"text":25,"correct":22},"B","分部分项工程报价",{"key":27,"text":28,"correct":29},"C","对某些量化因素进行价格折算后的总价",true,{"key":31,"text":32,"correct":22},"D","投标人优惠后的总价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1100690,"(2018年真题)某工程施工项目招标。采用经评审的最低投标价法评标，工期10个月以内每提前1个月可给建设单位带来收益30万元。某投标人报价1800万元，工期9个月，仅考虑工期因素，该投标人的合同价格和评标价格分别为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1800万元，1800万元",{"key":24,"text":41,"correct":29},"1800万元，1770万元",{"key":27,"text":43,"correct":22},"1830万元，1800万元",{"key":31,"text":45,"correct":22},"1830万元，1770万元",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1100691,"(2014年真题)某工程招标工期15个月，投标工期每提前一个月，可以给招标人带来20万元的收益。其中一投标人的投标报价3000万元，工期14个月，如果只考虑工期因素，则采用经评审的最低投标报价法评标时，其评标价为（ ）万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"3020",{"key":24,"text":53,"correct":29},"2980",{"key":27,"text":55,"correct":22},"3000",{"key":31,"text":57,"correct":22},"3010",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1100692,"(2014年真题)根据《标准施工招标文件》，评标委员会发现投标报价有算术错误时，正确的处理方式是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"视投标书不符合评审标准，否决其投标",{"key":24,"text":65,"correct":29},"对投标报价进行修正，修正价格需经投标人书面确认",{"key":27,"text":67,"correct":22},"直接按投标人的总报价评审，后果由投标人承担",{"key":31,"text":69,"correct":22},"要求投标人当场重新报价，按新报价评审",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1100693,"(2016年真题)根据《标准施工招标文件》，关于综合评估法评标的说法，不正确的有（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"适用于招标人对招标项目的技术、性能有专门要求的招标项目",{"key":24,"text":77,"correct":22},"评标委员会按照评标办法所列分值构成与评分标准进行打分，按得分从高到低顺序推荐中标人",{"key":27,"text":79,"correct":29},"评审的综合评分相等时，投标报价最接近标底的优先",{"key":31,"text":81,"correct":22},"投标人投标报价明显低于成本，且不能合理说明的，不能成为中标人",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1100694,"（2013年真题）采用最低评标价法进行评标时，关于评标价和投标价的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"按评标价确定中标人，按评标价订立合同",{"key":24,"text":89,"correct":29},"按评标价确定中标人，按投标价订立合同",{"key":27,"text":91,"correct":22},"按投标价确定中标人，按投标价订立合同",{"key":31,"text":93,"correct":22},"按投标价确定中标人，按评标价订立合同",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1100695,"（2012年真题）某施工项目采用最低评标价法评标。评标委员会推荐的中标候选人为甲、乙两单位，甲的投标价为7080万元、评标价为7040万元，乙的投标价为7060万元、评标价为7050万元，则评标报告中推荐中标候选人排序第一的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"甲投标人，合同价为7040万元",{"key":24,"text":101,"correct":29},"甲投标人，合同价为7080万元",{"key":27,"text":103,"correct":22},"乙投标人，合同价为7050万元",{"key":31,"text":105,"correct":22},"乙投标人，合同价为7060万元",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1100696,"（2012年真题）在工程项目招投标中，确定中标人的权利属于（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"招标人",{"key":24,"text":113,"correct":22},"评标委员会",{"key":27,"text":115,"correct":22},"招标代理机构",{"key":31,"text":117,"correct":22},"招标监督机构",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1100698,"（2020年真题）根据《标准施工招标文件》中的通用合同条款，施工合同签订前，中标人应按招标文件规定向招标人提交的凭证是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"投标保证金凭证",{"key":24,"text":125,"correct":22},"预付款担保凭证",{"key":27,"text":127,"correct":29},"履约担保凭证",{"key":31,"text":129,"correct":22},"质量管理体系认证文件",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1100699,"（2020年真题）《简明标准施工招标文件》的适用对象是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"设计和施工由同一承包人承担的工程",{"key":24,"text":137,"correct":22},"总投资为9000万元的非政府投资工程",{"key":27,"text":139,"correct":29},"工期为10个月的小型工程",{"key":31,"text":141,"correct":22},"工期紧、技术难度大的工程",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1100700,"（2020年真题）资格预审时，对投标人资格审查采用打分量化的方法是（ ）",[146,148,150,152],{"key":20,"text":147,"correct":29},"有限数量限制法",{"key":24,"text":149,"correct":22},"合格制法",{"key":27,"text":151,"correct":22},"标准化法",{"key":31,"text":153,"correct":22},"综合记分法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1100701,"（2020年真题）某工程，施工招标文件规定的评标方法为最低评标价法。现有三家单位投标，甲投标报价6050万元，评标价6000万元:乙投标报价6200万元，评标价5950万元:丙投标报价5950万元，评标价6050万元，则中标单位及签约合同价分别为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"乙，5950 万元",{"key":24,"text":161,"correct":29},"乙，6200 万元．",{"key":27,"text":163,"correct":22},"丙，5950 万元",{"key":31,"text":165,"correct":22},"丙，6050 万元",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1100702,"（2020年真题）根据《标准设计施工总承包招标文件》，投标人须知中对投标人有关设计工作的要求是（ ） ．",[170,172,174,176],{"key":20,"text":171,"correct":22},"质量标准和设计文件审批程序",{"key":24,"text":173,"correct":29},"质量标准、设计业绩和人员资格",{"key":27,"text":175,"correct":22},"设计文件审批和设计变更程序",{"key":31,"text":177,"correct":22},"设计业绩、人员资格和设计变更程序",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1100703,"材料设备采购招标中，划分采购合同标包主要考虑的内容是( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"符合采购资金的到位计划和周转计划，充分考虑计划实施的风险",{"key":24,"text":185,"correct":29},"有利于吸引较多投标人参加竞争，保证供货质量和时间",{"key":27,"text":187,"correct":22},"充分考虑供货的市场价格浮动，减少价格波动对采购成本的影响",{"key":31,"text":189,"correct":22},"全面考虑供货、仓储和运输能力，减少运输损耗，提高仓储能力",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1100704,"材料设备采购批次标包划分说法错误的是（）",[194,196,198,200],{"key":20,"text":195,"correct":29},"要避免划分过大，缺乏对大型供应厂商的吸引力",{"key":24,"text":197,"correct":22},"标包的划分要考虑工程实际需要，保证货物质量和供货时间",{"key":27,"text":199,"correct":22},"每次招标时，可依据设备材料的性质只发一个标包或分成几个标包同时招标",{"key":31,"text":201,"correct":22},"投标人可以投一个或其中的几个标包，但不能仅对-个标包中的某几项进行投标。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1100705,"下列关于材料设备采购招标特点，说法错误的是( )。",[206,208,210,212],{"key":20,"text":207,"correct":29},"招标签订特殊用途的大型非标准部件合同属于购买合同",{"key":24,"text":209,"correct":22},"询价方式一般用于采购数额不大的建筑材料和标准规格产品",{"key":27,"text":211,"correct":22},"直接订购方式多适用于零星采购、应急采购",{"key":31,"text":213,"correct":22},"采招标投标则是大宗及重要建筑材料和设备采购的最主要方式",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1100706,"大宗及重要建筑材料和设备采购的最主要方式是（）",[218,220,222,224],{"key":20,"text":219,"correct":22},"询价方式",{"key":24,"text":221,"correct":22},"邀请谈价方式",{"key":27,"text":223,"correct":22},"直接订购方式",{"key":31,"text":225,"correct":29},"招标投标方式",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1100707,"对于设备的采购，卖方负责与承运人签订运输协议，并承担货物运至目的地的运费和保险费的设备报价称之为（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"FOB价",{"key":24,"text":233,"correct":22},"FCA价",{"key":27,"text":235,"correct":22},"CIF价",{"key":31,"text":237,"correct":29},"CIP价",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1100708,"投标截止时间前已经进口的货物，可报（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"出厂价",{"key":24,"text":245,"correct":29},"仓库交货价",{"key":27,"text":247,"correct":22},"施工现场交货价",{"key":31,"text":249,"correct":22},"货交承运人指定地点",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1100713,"对于既有设备采购又有安装服务的项目招标，下列说法正确的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":29},"可以分开招标，也可以合并招标",{"key":24,"text":257,"correct":22},"可以按设备采购招标，也可以按安装工程招标",{"key":27,"text":259,"correct":22},"应当由承包商负责采购",{"key":31,"text":261,"correct":22},"供货方应当自己生产全部设备",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1100714,"下列关于大宗建筑材料或通用型批量生产的中小型设备采购的说法正确的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":29},"适宜招标选择供货商",{"key":24,"text":269,"correct":22},"属于加工承揽合同",{"key":27,"text":271,"correct":22},"供货商负责从生产到保修的全过程",{"key":31,"text":273,"correct":22},"采购人较多考虑性价比",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1100715,"下列报价方式按照投标人承担费用由多到少的顺序排列的是（）。 A.FO B.FC A.CIP.CI F.EXW B.CIP.CI F.FC A.FO B.EXW C.CIP.CI F.FO B.FC A.EXW",[278,280,282,284],{"key":20,"text":279,"correct":22},"CI",{"key":24,"text":281,"correct":22},"CIP.FO",{"key":27,"text":283,"correct":29},"FC",{"key":31,"text":285,"correct":22},"EXW",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1100716,"在建设工程材料采购招标中，投标人报 CIF价，对该报价理解不正确的是（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"卖方负责办理租船订舱",{"key":24,"text":293,"correct":22},"包含将货物装上船之前的一切费用",{"key":27,"text":295,"correct":29},"包含从装运港运至目的地的运费",{"key":31,"text":297,"correct":22},"包含保险费",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1100717,"在建设工程材料采购招标中，投标人报 FOB价，对该报价理解正确的是（）。",[302,304,306,308],{"key":20,"text":303,"correct":29},"卖方在指定的装运港将货物装上买方指定的船只，即完成交货",{"key":24,"text":305,"correct":22},"包含将货物交由承运人保管之前的一切运输费用",{"key":27,"text":307,"correct":22},"包含从装运港运至目的港的运费",{"key":31,"text":297,"correct":22},{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1100718,"在建设工程材料采购招标中，投标人报 EXW价，对该报价理解不正确的是（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"卖方在其所在地将货物交给买方后即完成交货",{"key":24,"text":316,"correct":29},"应包括货物运至施工现场的运输费用和保险费",{"key":27,"text":318,"correct":22},"应包括向政府缴纳的增值税和其他税",{"key":31,"text":320,"correct":22},"货物在制造时使用的部件和原材料在从关境外进口时已交纳或应交纳的全部关税、增值税和其他税也应包括在内",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},1100719,"在建设工程材料采购招标时，关于批次标包划分基本原则的说法正确的是（）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"不同类型的建筑材料应尽量分为一个标包",{"key":24,"text":328,"correct":22},"应保证材料设备尽量提前到货以满足工程进度的需要",{"key":27,"text":330,"correct":29},"划分的标包较大，不利于吸引中小供应商参与投标",{"key":31,"text":332,"correct":22},"划分的标包较小，有利于吸引大供应商参与投标",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},1100720,"下列关于订购非批量生产的大型复杂机组设备、特殊用途的大型非标准部件的说法正确的是（）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"属于买卖合同",{"key":24,"text":340,"correct":22},"供货商只需负责从生产到交货的全过程",{"key":27,"text":342,"correct":22},"采购人侧重对供货商的商业信誉.报价和交货期限等方面的比较",{"key":31,"text":273,"correct":29},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1100721,"采购数额不大的建筑材料和标准规格产品时，适宜的采购方式是（）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"直接订购",{"key":24,"text":351,"correct":29},"询价",{"key":27,"text":353,"correct":22},"招标",{"key":31,"text":355,"correct":22},"议标",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},1100722,"建设工程材料招标可以采用公开招标或邀请招标的方式。在招标程序上与勘察设计和施工招标基本相同，区别在于（）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"招标程序和评审要素",{"key":24,"text":363,"correct":22},"招标程序和量化比较",{"key":27,"text":365,"correct":29},"评审要素和量化比较",{"key":31,"text":367,"correct":22},"开标形式和评标原则",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},1100723,"关于机电设备招标的说法，错误的是( )。",[372,374,376,378],{"key":20,"text":373,"correct":22},"可以采用公开招标或邀请招标方式",{"key":24,"text":375,"correct":22},"招标程序与施工招标基本相同",{"key":27,"text":377,"correct":29},"评审要素和量化比较的方法与施工招标基本相同",{"key":31,"text":379,"correct":22},"招标文件应对要求提供的货物、招标过程和合同条款予以说明",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1100725,"《招标投标法》规定，招标人应当确定投标人编制投标文件所需的合理时间。依法必须进行招标的货物，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于（）日。",[384,386,388,390],{"key":20,"text":385,"correct":22},"5",{"key":24,"text":387,"correct":22},"7",{"key":27,"text":389,"correct":22},"15",{"key":31,"text":391,"correct":29},"20",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},1100728,"某国外设备投标的到岸价为300万美元，评审供货范围偏差增加评标价4万美元，商务偏差调整值为+2．5％，技术偏差调整值为+3％，则该设备投标价格的调整额为( )万美元。",[396,398,400,402],{"key":20,"text":397,"correct":22},"7．5",{"key":24,"text":399,"correct":22},"11．5",{"key":27,"text":401,"correct":22},"13．0",{"key":31,"text":403,"correct":29},"20．5",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},1100731,"在材料采购招标中，合同条款中规定预付款为合同总价的15%，如果投标人提出预付款需按合同总价的20%支付，则可按招标文件规定的年利率计算出合同总价（）提前付款后的利息，在评标价中（ ）这笔金额。",[408,410,412,414],{"key":20,"text":409,"correct":29},"5%，加上",{"key":24,"text":411,"correct":22},"5%，减去",{"key":27,"text":413,"correct":22},"20%，加上",{"key":31,"text":415,"correct":22},"20%，减去",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1100732,"对招标文件的实质性要求和条件存在偏差的投标书，（）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"不予淘汰，在评标结束前予以澄清.补正即可",{"key":24,"text":423,"correct":22},"不予淘汰，允许投标人重新投标",{"key":27,"text":425,"correct":22},"偏差超出招标文件规定的偏差范围的，予以淘汰",{"key":31,"text":427,"correct":29},"予以淘汰",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1100733,"投标书中出现下列（）情形的，评标委员会按预定方法换算成相应价格值，在投标报价上进行扣减形成评标价。",[432,434,436,438],{"key":20,"text":433,"correct":22},"投标材料性能低于标准",{"key":24,"text":435,"correct":29},"可以减少招标文件说明的预付款金额",{"key":27,"text":437,"correct":22},"投标材料性能高于标准",{"key":31,"text":439,"correct":22},"交货期早于招标文件规定的交货时间",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},1100734,"建设工程材料采购招标项目评标委员会对投标报价所作价格调整正确的是（）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"投标书中提出的交货期早于招标文件规定的交货时间，由此给招标人带来的经济利益按预定的方法折算后，减少投标价",{"key":24,"text":447,"correct":22},"投标书中提出增加预付款可以降低报价的供选择方案，按招标文件中规定的利率计算提前支付所产生的利息，减少投标价",{"key":27,"text":449,"correct":29},"投标材料的性能没有达到招标文件要求的基准参数，按预定的方法折算后，增加投标价",{"key":31,"text":451,"correct":22},"投标材料的性能高于招标文件要求的基准参数，按预定的方法折算后，减少投标价",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":27,"analysis":33},1100735,"对招标文件的非实质性要求和条件存在偏差的投标书，（）。",[456,458,459,460],{"key":20,"text":457,"correct":22},"仍属有效投标文件",{"key":24,"text":423,"correct":22},{"key":27,"text":425,"correct":29},{"key":31,"text":427,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1100736,"根据《机电产品采购国际竞争性招标文件》，属于设备采购中伴随服务的是( )。",[465,467,469,471],{"key":20,"text":466,"correct":22},"对设备进行包装",{"key":24,"text":468,"correct":29},"提供设备组装所需工具",{"key":27,"text":470,"correct":22},"交付设备",{"key":31,"text":472,"correct":22},"通知买方预计到货日期",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},1100737,"以下有关大型工程设备的采购招标，说法不正确的是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"单价计算的结果与总价不一致，以单价为准",{"key":24,"text":480,"correct":22},"文字表示的数值与用数字表示的不一致，以文字表示的数值为准",{"key":27,"text":482,"correct":22},"对招标设备的技术要求允许投标人有一定的偏差",{"key":31,"text":484,"correct":29},"以设备寿命周期成本为基础的评标价法不考虑寿命期末的残值",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},1100740,"下列关于中标人选定原则的说法中，不正确的是（）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"设计招标应为设计方案最优者",{"key":24,"text":492,"correct":22},"材料设备采购招标为评标价最低者",{"key":27,"text":494,"correct":29},"施工招标为投标价最低者",{"key":31,"text":496,"correct":22},"大型工程设备采购招标为所提供设备价格功能比最好者",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},1100741,"某通用设备采购招标项目，采用经评审的最低投标价法进行评标时，中标人应为（）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"报价最低者",{"key":24,"text":504,"correct":22},"评标得分最低者",{"key":27,"text":506,"correct":22},"评标得分最高者",{"key":31,"text":508,"correct":29},"评标价最低者",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},1100742,"采用招标方式采购运行期内各种费用较高的通用成套设备，下列对运营费用这一评审要素进行折价并对投标报价作价格调整不正确的是（）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"应当计算的费用包括评审寿命期内所需的燃料消耗费.备件及维修费用以及寿命期末设备残值",{"key":24,"text":516,"correct":22},"评审寿命期内所需的燃料消耗费.备件及维修费用，按预定的方法折算后，增加投标价",{"key":27,"text":518,"correct":29},"评审寿命期末设备残值，按预定的方法折算后，增加投标价",{"key":31,"text":520,"correct":22},"计算各项费用和残值时，均应按招标文件规定的贴现率折算成净现值",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},1100743,"采用招标方式采购运行期内各种费用较高的通用成套设备，评标时的正确做法是（）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"不宜将交货期作为评标内容",{"key":24,"text":528,"correct":22},"宜将报价最低者作为中标人",{"key":27,"text":530,"correct":29},"宜采用设备寿命周期成本为基础的评标价法",{"key":31,"text":532,"correct":22},"宜采用综合评估法",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1100744,"机电设备采购招标包括设备及伴随服务，投标人的伴随服务内容之一是（）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"申请设备使用许可",{"key":24,"text":540,"correct":22},"设备的技术指标改进",{"key":27,"text":542,"correct":29},"设备的调试",{"key":31,"text":544,"correct":22},"设备运抵现场的保管",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1100745,"《招标技标法实施条例》还规定，招标文件要求中标人提交履约保证金的，履约保证金不得超过中标合同合额的（） 。",[549,551,553,555],{"key":20,"text":550,"correct":22},"5%",{"key":24,"text":552,"correct":29},"10%",{"key":27,"text":554,"correct":22},"15%",{"key":31,"text":556,"correct":22},"20%",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1100746,"材料采购招标，投标保证金一般不得超过项目估算价的（）. 但最高不得超过（）万元人民币",[561,563,565,567],{"key":20,"text":562,"correct":22},"2%；20",{"key":24,"text":564,"correct":29},"2%；80",{"key":27,"text":566,"correct":22},"5%；20",{"key":31,"text":568,"correct":22},"5%；80",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},1100747,"某国外设备的CIF投标价格为250万美元，评标中供货范围偏差调整为3万美元，商务偏差调整为2％，技术偏差调整为3％。开标当日中国人民银行公布的汇率中间价为：1美元兑人民币6．4元。则投标价格调整额为( )万美元。",[573,575,577,579],{"key":20,"text":574,"correct":22},"8",{"key":24,"text":576,"correct":22},"10．5",{"key":27,"text":578,"correct":22},"12．5",{"key":31,"text":580,"correct":29},"15．5",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":31,"analysis":33},1100748,"采购生产线、成套设备、车辆等运行期内各种费用较高的货物，评标时可预先确定一个统一的设备评审寿命期(短于实际寿命期)．然后再根据投标书的实际情况在报价上加上该年限运行期间所发生的各项费用，再减去寿命期末设备的残值。这种方法属于（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"最低投标价法",{"key":24,"text":588,"correct":22},"综合评标法",{"key":27,"text":590,"correct":22},"最高投标价法",{"key":31,"text":592,"correct":29},"以设备寿命周期成本为基础的评标价法",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},1100749,"材料和通用型设备采购招标文件中，标包划分是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"有利于提高经济效益",{"key":24,"text":600,"correct":22},"有利于自身资质的不断完善",{"key":27,"text":602,"correct":22},"有利于提高自身的利益和供货质量",{"key":31,"text":604,"correct":29},"有利于吸引多家投标人参加竞争",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":27,"analysis":33},1100750,"订购非批量生产的大型复杂机组设备、特殊用途的大型非标准部件属于（ ），招标时要对投标人的商业信誉、加工制造能力、报价、交货期限和方式、安装(或安装指导)、调试、保修及操作人员培训等各方面条件进行全面比较。",[609,611,613,615],{"key":20,"text":610,"correct":22},"买卖合同",{"key":24,"text":612,"correct":22},"租赁合同",{"key":27,"text":614,"correct":29},"承揽合同",{"key":31,"text":616,"correct":22},"融资租赁合同",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]