[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-779-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},779,"合同管理","建筑工程",0,11,50,2250,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,453,465,477,489,501,513,525,537,548,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1100635,1,"单选题","招投标工作中，下列评标委员会的成员人数符合要求的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","成员人数为5人，其中技术、经济等方面的专家3人",false,{"key":24,"text":25,"correct":22},"B","成员人数为6人，其中技术、经济等方面的专家4人",{"key":27,"text":28,"correct":29},"C","成员人数为7人，其中技术、经济等方面的专家5人",true,{"key":31,"text":32,"correct":22},"D","成员人数为8人，其中技术、经济等方面的专家6人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1100636,"下列关于施工评标程序的叙述，不正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"招标文件中没有规定的评标标准和方法不得作为评标的依据",{"key":24,"text":41,"correct":22},"完成评标后，如果招标人授权由评标委员会定标，可直接确定中标人",{"key":27,"text":43,"correct":22},"若评标委员没有获得招标人的定标授权，应向招标人提交评标报告和中标候选人名单",{"key":31,"text":45,"correct":29},"中标候选人应当不少于3个，并标明排序",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1100637,"下列关于编制标底的说法错误的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":29},"标底是投标人计算的一个合理的基本价格",{"key":24,"text":53,"correct":22},"标底必须保密，应当在开标时公布",{"key":27,"text":55,"correct":22},"标底只能作为评标的参考",{"key":31,"text":57,"correct":22},"一个招标项目只能有一个标底",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1100639,"标准施工招标文件分卷组成中，图纸属于（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"第一卷",{"key":24,"text":65,"correct":29},"第二卷",{"key":27,"text":67,"correct":22},"第三卷",{"key":31,"text":69,"correct":22},"第四卷",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1100640,"《标准施工招标文件》的组成（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"共包含封面格式和三卷八章的内容",{"key":24,"text":77,"correct":29},"共包含封面格式和四卷八章的内容",{"key":27,"text":79,"correct":22},"共包含封面格式和三卷九章的内容",{"key":31,"text":81,"correct":22},"共包含封面格式和四卷九章的内容",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1100641,"下列各项中，不属于《简明标准施工招标文件》的有（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"招标公告",{"key":24,"text":89,"correct":22},"投标人须知",{"key":27,"text":91,"correct":22},"评标办法",{"key":31,"text":93,"correct":29},"发包人要求",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1100642,"下列选项中属于对招标人必须具有的要求的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"建设工程招标人是提出招标项目，发出招标邀约要求的法人或其他组织",{"key":24,"text":101,"correct":22},"有从事招标代理业务的经营场所和相应资金",{"key":27,"text":103,"correct":22},"有能够编制招标文件和组织评标的相应专业能力",{"key":31,"text":105,"correct":22},"有可以作为评标委员会成员人选的技术、经济等方面的“专家库”",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1100643,"下列对于重新招标和不再招标的情形描述错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"投标截止时间止，投标人少于3家应该直接发包",{"key":24,"text":113,"correct":22},"经评标委员会评审后否决所有投标应当重新招标",{"key":27,"text":115,"correct":22},"重新投标后，所有投标人又全部被否决的项目可以直接发包",{"key":31,"text":117,"correct":22},"重新投标后，投标人仍少于3家的项目可以直接发包",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1100644,"下列关于工程施工招标程序的相关说法，错误的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"现场踏勘是由招标人组织的",{"key":24,"text":125,"correct":29},"招标人必须委托招标代理机构进行招标事宜",{"key":27,"text":127,"correct":22},"评标委员会成员中技术、经济等方面的专家不得少于成员总数的三分之二",{"key":31,"text":129,"correct":22},"在踏勘现场后组织投标预备会",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1100645,"根据工程项目招标初评阶段的投标书修正原则，当投标文件中的总价金额与依据单价计算出的结果不一致时，应（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"以总价金额为准",{"key":24,"text":137,"correct":29},"以单价金额为准",{"key":27,"text":139,"correct":22},"淘汰该标书",{"key":31,"text":141,"correct":22},"重新进行核算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1100646,"某施工项目采用评标价法评标。评标委员会推荐的中标候选人为甲、乙两单位，甲的投标价为5050万元、评标价为5060万元，乙的投标价为5070万元、评标价为5050万元，则评标报告中推荐中标候选人排序第一的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"甲投标人，合同价为5050万元",{"key":24,"text":149,"correct":22},"甲投标人，合同价为5060万元",{"key":27,"text":151,"correct":29},"乙投标人，合同价为5070万元",{"key":31,"text":153,"correct":22},"乙投标人，合同价为5050万元",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1100647,"根据《标准施工招标文件》，下列评审工作中，不属于详细评审阶段工作内容的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"施工组织设计",{"key":24,"text":161,"correct":22},"项目管理机构",{"key":27,"text":163,"correct":29},"响应性评审",{"key":31,"text":165,"correct":22},"投标报价",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1100648,"以下不属于综合评估法初步评审内容的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"形式评审标准",{"key":24,"text":173,"correct":22},"资格评审标准",{"key":27,"text":175,"correct":22},"响应性评审标准",{"key":31,"text":177,"correct":29},"项目管理机构评审",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1100650,"初步评审过程中，投标人的投标可能不用作废标处理的行为是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"串通投标",{"key":24,"text":185,"correct":22},"弄虚作假",{"key":27,"text":187,"correct":22},"不按评标委员会要求澄清",{"key":31,"text":189,"correct":29},"投标人报价低于标底",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1100651,"关于施工招标采用综合评估法，投标报价有算术错误的说法，不正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"投标报价有算术错误的，评标委员会可以按相关原则对投标报价进行修正",{"key":24,"text":197,"correct":22},"投标文件中的大写金额与小写金额不一致的，以大写金额为准",{"key":27,"text":199,"correct":29},"总价金额与依据单价计算出的结果不一致的，以总价金额为准",{"key":31,"text":201,"correct":22},"总价金额与依据单价计算出的结果不一致的，以单价金额为准修正总价，但单价金额小数点有明显错误的除外",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1100652,"关于评标，下列说法错误的是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"评标过程中，招标委员会书面要求投标人对其投标文件中不明确的内容说明",{"key":24,"text":209,"correct":29},"评标委员会接受投标人主动提出的澄清",{"key":27,"text":211,"correct":22},"综合评估法要采用初步评审和详细评审两阶段",{"key":31,"text":213,"correct":22},"最低投标价法要采用初步评审和详细评审两阶段",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1100653,"下列有关施工评标程序的说法中，正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":29},"评标委员会对投标人提交的澄清、说明或补正有疑问的，可以要求投标人进一步澄清、说明或补正，直至满足评标委员会的要求",{"key":24,"text":221,"correct":22},"评标委员会可以接受投标人主动提出的澄清、说明或补正。",{"key":27,"text":223,"correct":22},"评标委员会发现投标人的报价明显低于其他投标报价，否决其投标",{"key":31,"text":225,"correct":22},"评标委员会完成评标后，应当向招标人提交口头评标报告。",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1100654,"某工程项目进行招标，有4家单位通过资格审查，单位①的评标价为1500万元，单位②的评标价为1550万元，单位③的评标价为1450万元，单位④的评标价为1400万元。采用最低投标价法评标，则中标单位为（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"单位①",{"key":24,"text":233,"correct":22},"单位②",{"key":27,"text":235,"correct":22},"单位③",{"key":31,"text":237,"correct":29},"单位④",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1100655,"具有通用技术、性能标准或者招标人对其技术、性能标准没有特殊要求的招标项目，是采用（ ）进行评标。",[242,244,246,248],{"key":20,"text":243,"correct":29},"最低评标价法",{"key":24,"text":245,"correct":22},"综合评标法",{"key":27,"text":247,"correct":22},"最高投标价法",{"key":31,"text":249,"correct":22},"以设备寿命周期成本为基础的评标价法",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1100656,"(2016年真题)编制施工招标项目的资格预审文件和招标文件时，必须不加修改地引用《标准施工招标资格预 审文件》和《标准施工招标文件》中的（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"申请人须知前附表",{"key":24,"text":257,"correct":29},"资格审查办法",{"key":27,"text":259,"correct":22},"投标人须知前附表",{"key":31,"text":261,"correct":22},"资格预审公告",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},1100657,"(2017年真题)建设工程项目施工评标委员会人数应为5人以上单数，其中技术、经济等方面的专家不得少于总 人数的（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"1\u002F2",{"key":24,"text":269,"correct":22},"1\u002F3",{"key":27,"text":271,"correct":29},"2\u002F3",{"key":31,"text":273,"correct":22},"3\u002F4",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1100659,"(2015年真题)根据《标准施工招标文件》，当重新招标时评标委员会否决所有投标，招标人应当（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"再次发布招标公告进行招标",{"key":24,"text":281,"correct":22},"降低对投标人的资格要求再次招标",{"key":27,"text":283,"correct":22},"降低工程质量标准再次招标",{"key":31,"text":285,"correct":29},"采用直接发包形式委托施工任务",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1100661,"(2016年真题)招标项目设有标底的，标底应当在（ ）时公布。",[290,292,294,296],{"key":20,"text":291,"correct":22},"发布招标公告",{"key":24,"text":293,"correct":22},"发售招标文件",{"key":27,"text":295,"correct":29},"开标",{"key":31,"text":297,"correct":22},"评标",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1100662,"(2018年真题)关于施工招标项目标底的说法，正确的是（ ）",[302,304,306,308],{"key":20,"text":303,"correct":22},"施工招标项目必须有标底",{"key":24,"text":305,"correct":29},"标底应当在开标时公布",{"key":27,"text":307,"correct":22},"标底应当作为评标的依据",{"key":31,"text":309,"correct":22},"一个项目可以有几个不同的标底",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1100663,"(2018年真题)关于投标保证金的说法，正确的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"招标文件的主要内容中不包括投标保证金",{"key":24,"text":317,"correct":29},"投标人不按要求提交投标保证金的，其投标文件按废标处理",{"key":27,"text":319,"correct":22},"投标保证金有效期应当长于投标有效期",{"key":31,"text":321,"correct":22},"投标保证金不得超过招标项目估算价的10%",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1100664,"(2018年真题)关于评标委员会的说法，正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":29},"评标委员会成员的名单应当保密",{"key":24,"text":329,"correct":22},"评标委员会成员的名单应当在开标后确定",{"key":27,"text":331,"correct":22},"评标委员会中的技术专家不得多于成员总数的2\u002F3",{"key":31,"text":333,"correct":22},"评标委员会中的专家一律采取随机抽取方式确定",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1100665,"(2018年真题)关于投标中投标质疑的说法，正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"投标人可以主动要求进行说明",{"key":24,"text":341,"correct":22},"投标人的说明可以改变投标文件的实质性内容",{"key":27,"text":343,"correct":22},"评标委员会可以口头通知投标人进行说明",{"key":31,"text":345,"correct":29},"投标人的说明应当采用书面形式",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1100666,"(2015年真题)根据《标准施工招标文件》，关于评标委员会对投标文件质疑的说法，错误的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"评标委员会以书面形式要求投标人书面澄清质疑问题",{"key":24,"text":353,"correct":29},"评标委员会约请投标人当面澄清并作会议记录",{"key":27,"text":355,"correct":22},"评标委员会不接受投标人主动提出的澄清说明",{"key":31,"text":357,"correct":22},"投标人的书面澄清说明作为投标书的组成文件",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1100667,"(2018年真题)根据《招标投标法》，应由（ ）确定中标人。",[362,364,366,368],{"key":20,"text":363,"correct":29},"招标人",{"key":24,"text":365,"correct":22},"招标代理机构",{"key":27,"text":367,"correct":22},"评标委员会",{"key":31,"text":369,"correct":22},"招标投标监督机构",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1100668,"(2017年真题)建设工程项目招标人与中标人签订合同前，可就投标文件中的（ ）进行协商谈判",[374,376,378,380],{"key":20,"text":375,"correct":29},"细微偏差",{"key":24,"text":377,"correct":22},"投标价格",{"key":27,"text":379,"correct":22},"质量要求",{"key":31,"text":381,"correct":22},"工期要求",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1100669,"(2013年真题)关于定标的说法，正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"确定中标人的权利归评标委员会",{"key":24,"text":389,"correct":29},"招标人在评标委员会推荐的中标候选人中确定中标人",{"key":27,"text":391,"correct":22},"招标人可以根据自己的意愿确定中标人",{"key":31,"text":393,"correct":22},"中标通知书发出后，投标人有权拒绝订立合同",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1100670,"(2014年真题)中标人在签订施工合同前，应履行的担保义务是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"按招标文件的规定向招标人提交预付款担保",{"key":24,"text":401,"correct":29},"按招标文件的规定向招标人提交履约担保",{"key":27,"text":403,"correct":22},"书面同意从工程款中扣留履约保证金",{"key":31,"text":405,"correct":22},"按招标文件规定提交工程款支付担保",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1100671,"(2012年真题)根据《标准施工招标文件》，到投标截止时间时，投标人数量不足（ ）个的，应当重新招 标。",[410,412,414,416],{"key":20,"text":411,"correct":22},"2",{"key":24,"text":413,"correct":29},"3",{"key":27,"text":415,"correct":22},"4",{"key":31,"text":417,"correct":22},"5",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1100672,"(2016年真题)根据《招标投标法实施条例》，招标人可以釆用两阶段招标的项目是（ ）",[422,424,426,428],{"key":20,"text":423,"correct":22},"建设规模100万㎡以上，建设周期3年以上的项目",{"key":24,"text":425,"correct":22},"项目初步设计已完成且施工图设计尚未完成的项目",{"key":27,"text":427,"correct":29},"技术复杂或者无法精确拟定技术规范的项目",{"key":31,"text":429,"correct":22},"构成内容多且专业性强的大型项目",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1100673,"(2017年真题)技术复杂的建设工程项目，招标人可采用两阶段招标。关于第二阶段评标的说法，错误的是 （ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"评标委员会检查各投标书是否按照第一阶段提出的要求作出响应性修改",{"key":24,"text":437,"correct":22},"投标人在澄清问题会后，应以书面形式对投标书的不明之处加以说明",{"key":27,"text":439,"correct":22},"技术标未通过者，商务标原封不动退还给投标人",{"key":31,"text":441,"correct":29},"技术标未通过，但商务报价及优惠条件对项目有利的，可参加第二阶段评标",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1100674,"(2016年真题)某招标项目，招标人在原定投标截止之日前10d发出最后一份书面答疑文件，则此时投标截止 时间至少延长（ ）d。",[446,447,449,451],{"key":20,"text":417,"correct":29},{"key":24,"text":448,"correct":22},"10",{"key":27,"text":450,"correct":22},"15",{"key":31,"text":452,"correct":22},"20",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1100675,"(2017年真题)建设工程项目的招标人发现招标文件有错误时，应在投标截止时间15日前通知投标人，同时进 行的工作是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":29},"以书面形式修改招标文件，但不延长投标截止日期",{"key":24,"text":460,"correct":22},"以口头形式修改招标文件，但不延长投标截止日期",{"key":27,"text":462,"correct":22},"以书面形式修改招标文件，并延长投标截止日期",{"key":31,"text":464,"correct":22},"以口头形式修改招标文件，并延长投标截止日期",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},1100676,"(2012年真题)关于招标人解答投标人质疑的说法，正确的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"招标人给予口头答复即可",{"key":24,"text":472,"correct":22},"招标人答复只给予提问者",{"key":27,"text":474,"correct":29},"招标人答复作为招标文件的组成部分",{"key":31,"text":476,"correct":22},"招标人答复与招标文件不一致，以招标文件为准",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1100677,"(2017年真题)公开招标时，对招标人和投标人均有法律约束力的投标有效期应从（ ）起算",[481,483,485,487],{"key":20,"text":482,"correct":22},"发布招标公告日",{"key":24,"text":484,"correct":22},"开始资格预审日",{"key":27,"text":486,"correct":22},"发售招标文件日",{"key":31,"text":488,"correct":29},"投标截止日",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},1100678,"(2015年真题)工程投标时，投标保证金对投标人具有约束力的期限是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"申请资格预审日起，至开标日止",{"key":24,"text":496,"correct":22},"购买招标文件日起，至开标日止",{"key":27,"text":498,"correct":22},"投标截止日起，至招标人确定中标人日止",{"key":31,"text":500,"correct":29},"投标截止日起，至招标人与中标人签订合同日止",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},1100679,"(2017年真题)在投标有效期内出现特殊情况，招标人以书面形式通知投标人延长投标有效期时，投标人的正 确做法是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":29},"同意延长，并相应延长投标保证金的有效期",{"key":24,"text":508,"correct":22},"同意延长，并要求修改投标文件",{"key":27,"text":510,"correct":22},"同意延长，但拒绝延长投标保证金的有效期",{"key":31,"text":512,"correct":22},"拒绝延长，但无权收回投标保证金",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},1100680,"(2016年真题)关于延长投标有效期的说法，错误的是（ ）",[517,519,521,523],{"key":20,"text":518,"correct":22},"需要延长投标有效期时，招标人应以书面形式通知所有投标人",{"key":24,"text":520,"correct":22},"投标人同意延长投标有效期，其投标保证金的有效期相应延长",{"key":27,"text":522,"correct":22},"投标人可以拒绝延长投标有效期，但会失去参与投标竞争的资格",{"key":31,"text":524,"correct":29},"投标人拒绝延长投标有效期的，无权收回投标保证金",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},1100681,"(2012年真题)某工程项目招标采用评标价法评标。中标人的投标报价为5000万元，投标工期比招标文件要求的工期提前获得评标优惠150万元。若评标时不考虑其他因素，则评标价和合同价应分别为（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":29},"4850万元和5000万元",{"key":24,"text":532,"correct":22},"4850万元和4850万元",{"key":27,"text":534,"correct":22},"5150万元和5000万元",{"key":31,"text":536,"correct":22},"5150万元和4850万元",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1100682,"(2015年真题)根据《标准施工招标文件》，下列评审工作中，不属于综合评估法的初步评审阶段工作内容的是（ ）。",[541,543,545,546],{"key":20,"text":542,"correct":22},"形式评审",{"key":24,"text":544,"correct":22},"资格评审",{"key":27,"text":163,"correct":22},{"key":31,"text":547,"correct":29},"施工方案合理性评审",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1100683,"(2016年真题)根据《标准施工招标文件》，对于大型复杂工程，有特殊专业施工技术和经验要求的施工招标，宜采用的评标方法是（ ）。",[552,554,555,557],{"key":20,"text":553,"correct":22},"最低投标价法",{"key":24,"text":243,"correct":22},{"key":27,"text":556,"correct":22},"最合理报价评审法",{"key":31,"text":558,"correct":29},"综合评估法",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},1100684,"(2016年真题)某采用最低评标价法评标的项目，其评标价比较如下： 则第一中标候选人的评标价格和投标报价分别为（ ）万元。",[563,565,567,569],{"key":20,"text":564,"correct":22},"3200和3200",{"key":24,"text":566,"correct":22},"3360和3200",{"key":27,"text":568,"correct":29},"3350和3500",{"key":31,"text":570,"correct":22},"3370和3400",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1100685,"(2016年真题)施工评标过程中，发现投标报价大写金额与小写金额不一致时，评标委员会正确的处理办法是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"以小写金额为准修正投标报价并经投标人书面确认",{"key":24,"text":578,"correct":29},"以大写金额为准修正投标报价并经投标人书面确认",{"key":27,"text":580,"correct":22},"由投标人书面澄清，按大写或按小写来计算投标报价",{"key":31,"text":582,"correct":22},"将该投标文件直接作废标处理",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1100686,"(2016年真题)施工评标中，审查投标人名称与资质证书的名称是否一致，属于（ ）评审的内容。",[587,589,591,593],{"key":20,"text":588,"correct":22},"资格",{"key":24,"text":590,"correct":22},"程序",{"key":27,"text":592,"correct":22},"响应性",{"key":31,"text":594,"correct":29},"形式",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},1100687,"(2017年真题)采用综合评估法对施工项目投标文件进行详细评审时，属于施工组织设计评审内容的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"项目经理的任职资格",{"key":24,"text":602,"correct":22},"主要技术负责人的施工管理业绩",{"key":27,"text":604,"correct":22},"各专业人员数量的合理性",{"key":31,"text":606,"correct":29},"资源配置计划的合理性",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":27,"analysis":33},1100688,"(2017年真题)建设工程项目招标采用资格后审方式的，资格后审时间应为（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":22},"提交投标书后，开标前",{"key":24,"text":614,"correct":22},"提交投标书后，评标前",{"key":27,"text":616,"correct":29},"开标后，评标前",{"key":31,"text":618,"correct":22},"提交投标书前",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]