[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102700":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102700,779,2,"多选题","以下（ ）是招标采购阶段的合同管理的内容。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开展项目招标采购的总体策划",true,{"key":16,"text":17,"correct":18},"B","落实细化合同交底工作",false,{"key":20,"text":21,"correct":14},"C","根据标准文本编制招标文件和合同条件",{"key":23,"text":24,"correct":14},"D","合理选择合同计价方式",{"key":26,"text":27,"correct":18},"E","灵活规范应对处理合同变更","ACD","知识点:招标采购阶段的管理任务和方法。选项BE是合同订立及履行阶段合同管理目标。2020版教材P1～6。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]