[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102683":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102683,779,2,"多选题","勘察投标中详细评标评审的因素包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","资信业绩",true,{"key":16,"text":17,"correct":14},"B","勘察纲要",{"key":19,"text":20,"correct":21},"C","资格评审",false,{"key":23,"text":24,"correct":14},"D","投标报价",{"key":26,"text":27,"correct":21},"E","响应性评审","ABD","知识点:勘察评标的评审因素。选CE属于初步评审的因素。2020版教材P36。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]