[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102651":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102651,779,2,"多选题","根据《标准设计施工总承包合同》，可给予承包人费用和工期补偿的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","缺陷责任期内非承包人原因缺陷的修复",false,{"key":16,"text":17,"correct":14},"B","发包人违约解除合同",{"key":19,"text":20,"correct":21},"C","隐蔽工程的重新检查证明质量合格",true,{"key":23,"text":24,"correct":21},"D","发包人原因的工期延误",{"key":26,"text":27,"correct":21},"E","基准资料错误","CDE","知识点:索赔管理。选项AB，可给予费用补偿，但不用延长工期；选项C，由于隐蔽工程的重新检查证明质量合格，则费用补偿，工期顺延；如检验质量不合格，则费用不予补偿，不能延长工期。2020版教材P133。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]