[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102335":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102335,779,2,"多选题","我国的标准设计施工总承包合同，分别给出（ ）可供发包人选择的合同模式。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","固定工期",false,{"key":16,"text":17,"correct":14},"B","固定费用",{"key":19,"text":20,"correct":21},"C","可以补偿",true,{"key":23,"text":24,"correct":21},"D","不补偿",{"key":26,"text":27,"correct":14},"E","固定地点","CD","2020版教材P119-120 我国的标准设计施工总承包合同，分别给出可以补偿或不补偿两种可供发包人选择的合同模式。因此，本题的正确答案为CD。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]