[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102334":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102334,779,2,"多选题","设计施工总承包合同，暂列金额在通用条款内列出的可选用的条款有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","区段工程应达到的要求",false,{"key":16,"text":17,"correct":14},"B","约定分部移交区段的名称",{"key":19,"text":20,"correct":21},"C","计日工费和暂估价均已包括在合同价格内，实施过程中不再另行考虑",true,{"key":23,"text":24,"correct":14},"D","发包人不提供施工设备或临时设施",{"key":26,"text":27,"correct":21},"E","实际发生的费用另行补偿的方式","CE","2020版教材P123-126 通用条款中对承包人在投标阶段，按照发包人在价格清单中给出的计日工和暂估价的报价均属于暂列金额内支出项目。通用条款内分别列出两种可选用的条款，一种是计日工费和暂估价均已包括在合同价格内，实施过程中不再另行考虑；另一种是实际发生的费用另行补偿的方式。因此，本题的正确答案为CE。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]