[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102332":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102332,779,2,"多选题","对于发包人负责提供主材料和工程设备的包工部分包料承包方式，应在专用条款内写明材料和工程设备的（ ）等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","名称",true,{"key":16,"text":17,"correct":14},"B","规格",{"key":19,"text":20,"correct":14},"C","数量",{"key":22,"text":23,"correct":14},"D","价格",{"key":25,"text":26,"correct":27},"E","时间",false,"ABCD","2020版教材P123-126 本题考查重点是“设计施工总承包合同的订立——订立合同时需要明确的内容”。发包人是否负责提供工程材料和设备，在通用条款中也给出两种不同供选择的条款：一种是由承包人包工包料承包，发包人不提供工程材料和设备；另一种是发包人负责提供主材料和工程设备的包工部分包料承包方式。对于后一种情况，应在专用条款内写明材料和工程设备的名称、规格、数量、价格、交货方式、交货地点等。因此，本题的正确答案为ABCD。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]