[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102242":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102242,779,2,"多选题","关于设计招标项目评标的说法，正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","通常采用综合评估法",true,{"key":16,"text":17,"correct":18},"B","可以使用招标文件未规定的评标标准和方法以提高评标质量",false,{"key":20,"text":21,"correct":18},"C","响应性评审属于详细评审的内容",{"key":23,"text":24,"correct":18},"D","资信业绩评审属于初步评审的内容",{"key":26,"text":27,"correct":14},"E","未通过初步评审的投标文件不再进行详细评审","AE","3、评标分为初步评审和详细评审两个阶段",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]