[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102220":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102220,779,2,"多选题","在勘察设计招标中，以下（ ）属于投标人资格审查资料的内容。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","对投标人资质要求",false,{"key":16,"text":17,"correct":18},"B","投标人近年财务状况表",true,{"key":20,"text":21,"correct":18},"C","拟委任的主要人员汇总表",{"key":23,"text":24,"correct":14},"D","项目负责人的资格要求",{"key":26,"text":27,"correct":18},"E","投标人近年完成的类似勘察设计项目情况表","BCE","本题考查的是工程勘察设计招标主要工作内容。注意与招标人对投标人要求的资料相区别。选项AD属于招标人对投标人的要求。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]