[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102200":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102200,779,2,"多选题","建设工程项目的招标人对投标人就招标文件提出的问题作出澄清，该澄清可能影响投标文件编制，如澄清发出时距投标截止时间还余10日，同时进行的工作是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","澄清仅发给提出问题的投标人",false,{"key":16,"text":17,"correct":18},"B","澄清发送给每一位投标",true,{"key":20,"text":21,"correct":14},"C","澄清应说明问题的来源",{"key":23,"text":24,"correct":18},"D","延长投标截止日期",{"key":26,"text":27,"correct":14},"E","不延长投标截止日期","BD","",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]