[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102134":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102134,779,2,"多选题","下列关于各报价方式下卖方责任理解正确的是（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","报EXW价的卖方在施工现场将货物交给买方后即完成交货",false,{"key":16,"text":17,"correct":14},"B","报FCA价的卖方在指定装运港将货物装上买方指定的船只即完成交货",{"key":19,"text":20,"correct":14},"C","报FOB价的卖方在指定地点将货物交给买方指定的承运人即完成交货",{"key":22,"text":23,"correct":24},"D","报CIF价的卖方负责办理租船订舱并承担从装运港运至目的港的保险费",true,{"key":26,"text":27,"correct":24},"E","报CIP价的卖方负责与承运人签订运输协议并承担货物运至目的地的保险费","DE","",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]